Murrieta Creek Phase 2B

W912PL25BA004

Department of the Army, W075 Endist Los Angeles. Other Heavy and Civil Engineering Construction.

Awarded

Empire Equipment Service, Inc.

$45,881,628.61 obligated so far on USAspending

Description

As published on SAM.gov.

Be advised that the bid abtract has been uploaded in the attachments section of this announcment.

BID OPENING PARTICIPATION INSTUCTIONS

see attachment for Meeting instructions and call in number

Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00).

The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:?

RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.?

EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
S716Y6TKMYN5
CAGE
7WLX1
Vendor location
Riverside, CA
Contract
W912PL25C0020, definitive contract
Obligated
$45,881,628.61, current value $46,158,199, potential $48,319,319
Actions
6 between July 16, 2025 and May 21, 2026
Competition
Full and Open Competition After Exclusion of Sources, 2 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Murrieta Creek Phase 2B
Match
solicitation number W912PL25BA004 equals the FPDS solicitation identifier; same awarding office W912PL (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 18, 2025

    Presolicitation

    Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration

    Due June 4, 2025 at 4:00 PM EDT. SAM.gov, notice e20eddae61244be6bdf60e31c6849b3a

  2. April 21, 2025

    Presolicitation

    Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration

    Due June 4, 2025 at 4:00 PM EDT. SAM.gov, notice 608a231606354e3aa8a520fdd4804b12

  3. May 2, 2025

    Solicitation

    Due June 4, 2025 at 5:00 PM EDT. SAM.gov, notice 2e88aec7f1ad4fc597815e1f74824e2f

  4. May 29, 2025

    Solicitation

    Due June 13, 2025 at 4:00 PM EDT. SAM.gov, notice 5d2a8ba72826458c9b548b1a969cd7c0

  5. June 4, 2025

    Solicitation

    Due June 13, 2025 at 5:00 PM EDT. SAM.gov, notice 73a748ccbfe841649e22833d7b5d0ade

  6. June 10, 2025

    Solicitation

    Due July 2, 2025 at 5:00 PM EDT. SAM.gov, notice e46bce5d235c453885ea2f267c09e051

  7. June 17, 2025

    Solicitation

    Due July 2, 2025 at 5:00 PM EDT. SAM.gov, notice 5e1ddf960eb34b19b95a7204b09f56f5

  8. July 1, 2025

    Solicitation

    Due July 2, 2025 at 5:00 PM EDT. SAM.gov, notice 7632cb1ea1a34e8b9a73cd888a794ef8

  9. July 2, 2025

    Solicitation

    Due July 2, 2025 at 6:00 PM EDT. SAM.gov, notice 14fd1968365d4882b36943296b446f07

  10. July 2, 2025

    Solicitation

    Due July 2, 2025 at 5:00 PM EDT. SAM.gov, notice 53e6eae5c8c4428e917929e0d0059283

  11. July 2, 2025

    Solicitation

    Due July 2, 2025 at 6:00 PM EDT. SAM.gov, notice 8820cccaa5bf4a3eb55afaf934bf6e90

  12. July 7, 2025

    Solicitation

    Due July 2, 2025 at 5:00 PM EDT. SAM.gov, notice 5b0ae067ee4a46b9b5b7ba3992228bcf