{"canonical":"https://abierto.us/opportunities/w912pl25ba004","key":"W912PL25BA004","url":"https://abierto.us/opportunities/w912pl25ba004","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","open":false,"response_deadline":"2025-07-02T21:00:00Z","first_posted":"2025-04-18","last_posted":"2025-07-07","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W075 ENDIST LOS ANGELES","naics":"237990","psc":"Y1PZ","set_aside":"SBA","place_state":"CA","place_county":"06065","place_county_name":"Riverside County","place_city":"0678120","place_city_name":"Temecula","winner":"EMPIRE EQUIPMENT SERVICE, INC.","award_amount":null,"publications":[{"notice_id":"e20eddae61244be6bdf60e31c6849b3a","title":"Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration","solicitation_number":"W912PL25BA004","notice_type":"p","base_type":"p","posted":"2025-04-18","posted_at":null,"due_at":"2025-06-04T20:00:00Z","due_date":"2025-06-04","cancelled":null,"archived":null,"archive_date":"2025-06-19","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e20eddae61244be6bdf60e31c6849b3a/view","enriched":false,"history":[]},{"notice_id":"608a231606354e3aa8a520fdd4804b12","title":"Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration","solicitation_number":"W912PL25BA004","notice_type":"p","base_type":"p","posted":"2025-04-21","posted_at":null,"due_at":"2025-06-04T20:00:00Z","due_date":"2025-06-04","cancelled":null,"archived":null,"archive_date":"2025-06-19","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/608a231606354e3aa8a520fdd4804b12/view","enriched":false,"history":[]},{"notice_id":"2e88aec7f1ad4fc597815e1f74824e2f","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-05-02","posted_at":null,"due_at":"2025-06-04T21:00:00Z","due_date":"2025-06-04","cancelled":null,"archived":null,"archive_date":"2026-05-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2e88aec7f1ad4fc597815e1f74824e2f/view","enriched":false,"history":[]},{"notice_id":"5d2a8ba72826458c9b548b1a969cd7c0","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-05-29","posted_at":null,"due_at":"2025-06-13T20:00:00Z","due_date":"2025-06-13","cancelled":null,"archived":null,"archive_date":"2026-05-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5d2a8ba72826458c9b548b1a969cd7c0/view","enriched":false,"history":[]},{"notice_id":"73a748ccbfe841649e22833d7b5d0ade","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-06-04","posted_at":null,"due_at":"2025-06-13T21:00:00Z","due_date":"2025-06-13","cancelled":null,"archived":null,"archive_date":"2026-06-04","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/73a748ccbfe841649e22833d7b5d0ade/view","enriched":false,"history":[]},{"notice_id":"e46bce5d235c453885ea2f267c09e051","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-06-10","posted_at":null,"due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":null,"archived":null,"archive_date":"2026-06-10","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e46bce5d235c453885ea2f267c09e051/view","enriched":false,"history":[]},{"notice_id":"5e1ddf960eb34b19b95a7204b09f56f5","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-06-17","posted_at":null,"due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":null,"archived":null,"archive_date":"2026-06-17","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5e1ddf960eb34b19b95a7204b09f56f5/view","enriched":false,"history":[]},{"notice_id":"7632cb1ea1a34e8b9a73cd888a794ef8","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-07-01","posted_at":null,"due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":null,"archived":null,"archive_date":"2026-07-01","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7632cb1ea1a34e8b9a73cd888a794ef8/view","enriched":false,"history":[]},{"notice_id":"14fd1968365d4882b36943296b446f07","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-07-02","posted_at":null,"due_at":"2025-07-02T22:00:00Z","due_date":"2025-07-02","cancelled":null,"archived":null,"archive_date":"2026-07-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/14fd1968365d4882b36943296b446f07/view","enriched":false,"history":[]},{"notice_id":"53e6eae5c8c4428e917929e0d0059283","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-07-02","posted_at":null,"due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":null,"archived":null,"archive_date":"2026-07-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/53e6eae5c8c4428e917929e0d0059283/view","enriched":false,"history":[]},{"notice_id":"8820cccaa5bf4a3eb55afaf934bf6e90","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-07-02","posted_at":null,"due_at":"2025-07-02T22:00:00Z","due_date":"2025-07-02","cancelled":null,"archived":null,"archive_date":"2026-07-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8820cccaa5bf4a3eb55afaf934bf6e90/view","enriched":false,"history":[]},{"notice_id":"5b0ae067ee4a46b9b5b7ba3992228bcf","title":"Murrieta Creek Phase 2B","solicitation_number":"W912PL25BA004","notice_type":"o","base_type":"o","posted":"2025-07-07","posted_at":null,"due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","cancelled":null,"archived":null,"archive_date":"2026-07-02","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5b0ae067ee4a46b9b5b7ba3992228bcf/view","enriched":false,"history":[]}],"latest_notice_id":"5b0ae067ee4a46b9b5b7ba3992228bcf","first_type":"p","notices":[{"dates":{"posted":"2025-04-18","response_deadline":{"raw":"2025-06-04T13:00:00-07:00","utc":"2025-06-04T20:00:00Z","date":"2025-06-04","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e20eddae61244be6bdf60e31c6849b3a/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-19","archive_type":"auto15"},"contacts":[{"name":"Michael G. Robinson","role":"primary","email":"michael.g.robinson@usace.army.mil","phone":"213-452-3311"},{"name":"Ashley Powell","role":"secondary","email":"ashley.s.powell@usace.army.mil"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"e20eddae61244be6bdf60e31c6849b3a","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7052c4567080cb1503c9da305471a1f1d1f4df3e4be2e2b01e0337d8b52aa377","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Be advised that this is only a pre-soliciation notice. This notice does not commit the government to a soliciation nor is it a request for proposals or an invitation for bids. Solicitation should be advertised some time around 5 May 2025. The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(>500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate). Utilities: • RCWD 36\" line: Existing 36\" steel pipe to be relocated approximately 15' upstream of its current location. The new 36\" steel pipe will be encased in a 60\" steel casing. • RCWD 12\" line: Existing 12\" steel pipe to be abandoned in-place and removed by the Contractor. • RCWD 24\" line: Existing 24\" steel pipe to be relocated approximately 15' upstream of its current location. The new 24\" steel pipe will be encased in a 42\" steel casing. • EMWD 12\" and 24\" sewer lines: Existing 12\" and 24\" sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11' of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete. • SCG 4\" HP gas line: SCG will perform the relocation of the existing 4\" HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-04-21","response_deadline":{"raw":"2025-06-04T13:00:00-07:00","utc":"2025-06-04T20:00:00Z","date":"2025-06-04","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/608a231606354e3aa8a520fdd4804b12/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-06-19","archive_type":"auto15"},"contacts":[{"name":"Michael G. Robinson","role":"primary","email":"michael.g.robinson@usace.army.mil","phone":"213-452-3311"},{"name":"Ashley Powell","role":"secondary","email":"ashley.s.powell@usace.army.mil"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"608a231606354e3aa8a520fdd4804b12","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"df8114b9d637c470842b0bdcd81f798010f88252f04200509e2283b327f1ca2a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Be advised that this is only a pre-soliciation notice. This notice does not commit the government to a soliciation nor is it a request for proposals or an invitation for bids. Solicitation should be advertised some time around 5 May 2025. This project is estimated to be between $25,000,000 and $100,000,000. The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(>500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate). Utilities: • RCWD 36\" line: Existing 36\" steel pipe to be relocated approximately 15' upstream of its current location. The new 36\" steel pipe will be encased in a 60\" steel casing. • RCWD 12\" line: Existing 12\" steel pipe to be abandoned in-place and removed by the Contractor. • RCWD 24\" line: Existing 24\" steel pipe to be relocated approximately 15' upstream of its current location. The new 24\" steel pipe will be encased in a 42\" steel casing. • EMWD 12\" and 24\" sewer lines: Existing 12\" and 24\" sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11' of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete. • SCG 4\" HP gas line: SCG will perform the relocation of the existing 4\" HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-05-02","response_deadline":{"raw":"2025-06-04T13:00:00-08:00","utc":"2025-06-04T21:00:00Z","date":"2025-06-04","time":"13:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2e88aec7f1ad4fc597815e1f74824e2f/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-05-02","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2e88aec7f1ad4fc597815e1f74824e2f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6952af8a0eb1a074b181da3b98dca484056633a8c7aab399a172865be83a8b97","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary and Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","street":"Murrieta Creek, Riverside County, CA"},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-05-29","response_deadline":{"raw":"2025-06-13T13:00:00-07:00","utc":"2025-06-13T20:00:00Z","date":"2025-06-13","time":"13:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5d2a8ba72826458c9b548b1a969cd7c0/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-05-02","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5d2a8ba72826458c9b548b1a969cd7c0","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"34607f2cb45e54bfa07f1619f7bba517ac47768897823accd41fb874bfee9550","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"**AMENDMENT 0001 & AMENDMENT 0002 posted to PIEE- Please follow the below provided Links to Soliciation and Amendmnet Updates** The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary and Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-06-04","response_deadline":{"raw":"2025-06-13T13:00:00-08:00","utc":"2025-06-13T21:00:00Z","date":"2025-06-13","time":"13:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/73a748ccbfe841649e22833d7b5d0ade/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-06-04","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"73a748ccbfe841649e22833d7b5d0ade","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7a212f67e5861f5616ad451f3ce9028b942240affd161d00bd2c338b24e964eb","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"*Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-06-10","response_deadline":{"raw":"2025-07-02T13:00:00-08:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"13:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e46bce5d235c453885ea2f267c09e051/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-06-10","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e46bce5d235c453885ea2f267c09e051","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a1102a9c7936fdebc8ae638c5f00c4f8f1d5b2f7063352bce2e7c824cce05119","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"*Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-06-17","response_deadline":{"raw":"2025-07-02T13:00:00-08:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"13:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5e1ddf960eb34b19b95a7204b09f56f5/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-06-17","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5e1ddf960eb34b19b95a7204b09f56f5","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"21af9fc2a62aaebead34f70e8da7612dc5d3538f3351221df5c31efea236f620","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"*Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-07-01","response_deadline":{"raw":"2025-07-02T13:00:00-08:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"13:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7632cb1ea1a34e8b9a73cd888a794ef8/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-07-01","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7632cb1ea1a34e8b9a73cd888a794ef8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"917de99b11c7ffb486ee24ff9b8ddde371ce0c9624196027de5908005fa39eb5","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"***BID OPENING PARTICIPATION INSTUCTIONS***see attachment for Meeting instructions and call in number***Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-07-02","response_deadline":{"raw":"2025-07-02T14:00:00-08:00","utc":"2025-07-02T22:00:00Z","date":"2025-07-02","time":"14:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/14fd1968365d4882b36943296b446f07/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-07-02","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"14fd1968365d4882b36943296b446f07","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"150a2c9118559cd7af3e87872fbe65dcd99a280a2bf46f0eb5ff5ef7c17c344c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"***BID OPENING PARTICIPATION INSTUCTIONS***BIDS DUE at 2PM***see attachment for Meeting instructions and call in number***Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-07-02","response_deadline":{"raw":"2025-07-02T14:00:00-07:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/53e6eae5c8c4428e917929e0d0059283/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-07-02","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"53e6eae5c8c4428e917929e0d0059283","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6d12c738591b6d3ce8816546f5c93df273b76586fff000d0fe1be43ec695e588","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"***BID OPENING PARTICIPATION INSTUCTIONS***see attachment for Meeting instructions and call in number***Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-07-02","response_deadline":{"raw":"2025-07-02T14:00:00-08:00","utc":"2025-07-02T22:00:00Z","date":"2025-07-02","time":"14:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8820cccaa5bf4a3eb55afaf934bf6e90/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-07-02","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8820cccaa5bf4a3eb55afaf934bf6e90","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"559214169701b528716f48ccba703ebb5de197db568770d8de210a9f2ad4174b","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"***BID OPENING PARTICIPATION INSTUCTIONS***see attachment for Meeting instructions and call in number***Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"},{"dates":{"posted":"2025-07-07","response_deadline":{"raw":"2025-07-02T14:00:00-07:00","utc":"2025-07-02T21:00:00Z","date":"2025-07-02","time":"14:00:00","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5b0ae067ee4a46b9b5b7ba3992228bcf/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Murrieta Creek Phase 2B","agency":{"office":{"code":"W912PL","name":"W075 ENDIST LOS ANGELES"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-07-02","archive_type":"auto_custom"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5b0ae067ee4a46b9b5b7ba3992228bcf","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"3efa0cc4c8dc6026fb573e05b288f2da725c55207d0c61e74638dbd89433e4df","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T17:45:50.850439Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"text":"Be advised that the bid abtract has been uploaded in the attachments section of this announcment. ***BID OPENING PARTICIPATION INSTUCTIONS***see attachment for Meeting instructions and call in number***Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912PL25BA004","place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"product_service_code":"Y1PZ"}],"due_at":"2025-07-02T21:00:00Z","due_date":"2025-07-02","closes_at":"2025-07-02T21:00:00Z","awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PL","office_name":"W075 ENDIST LOS ANGELES","state":"CA","county":"06065","county_name":"Riverside County","city":"0678120","city_name":"Temecula","country":"USA","winner_key":"S716Y6TKMYN5","amount":null,"linked_awards":12,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"5b0ae067ee4a46b9b5b7ba3992228bcf","description":{"text":"Be advised that the bid abtract has been uploaded in the attachments section of this announcment. ***BID OPENING PARTICIPATION INSTUCTIONS***see attachment for Meeting instructions and call in number***Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing","html":null,"origin":"extract"},"contacts":[{"name":"Ashley Powell","role":"primary","email":"ashley.s.powell@usace.army.mil","phone":"2134523241"},{"name":"Michael Robinson","role":"secondary","email":"MICHAEL.G.ROBINSON@USACE.ARMY.MIL","phone":"2134523311"}],"place_of_performance":{"zip":"92590","city":{"name":"Temecula"},"state":{"code":"CA"},"street":"Murrieta Creek, Riverside County, CA","country":{"code":"USA"}},"office_address":{"zip":"90017-3409","city":"LOS ANGELES","state":"CA","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[],"awards":[{"award_key":"CONT_AWD_W912PL25C0020_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_W912PL25C0020_9700_-NONE-_-NONE-/","piid":"W912PL25C0020","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"S716Y6TKMYN5","recipient_name":"EMPIRE EQUIPMENT SERVICE, INC.","recipient_uei":"S716Y6TKMYN5","recipient_cage":"7WLX1","recipient_city":"RIVERSIDE","recipient_state":"CA","sub_name":"Department of the Army","office_name":"W075 ENDIST LOS ANGELES","office_key":"o-W912PL","first_action_date":"2025-07-16","last_action_date":"2026-05-21","actions":6,"obligated":"45881628.61","current_total_value":"46158198.61","potential_total_value":"48319319.18","naics":"237990","psc":"Y1PZ","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":2,"description":"MURRIETA CREEK PHASE 2B","method":"solicitation","confidence":"high","evidence":["solicitation number W912PL25BA004 equals the FPDS solicitation identifier","same awarding office W912PL"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"W912PL26S0050","latest_notice_id":"b9d0bb9ba9e44aab82f9b02938734ace","title":"RIO DE FLAG FLOOD CONTROL PROJECT ��������� PHASE 4 LOWER RDF INLET","solicitation_number":"W912PL26S0050","notice_type":"r","first_type":"r","first_posted":"2026-08-27","last_posted":"2026-08-27","notices":2,"due_at":"2026-09-18T21:00:00Z","due_date":"2026-09-18","closes_at":"2026-09-18T21:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PL","office_name":"W075 ENDIST LOS ANGELES","naics":null,"psc":null,"set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-17T06:28:38.602097Z"},{"key":"W912PL26S0052","latest_notice_id":"245224c2dfbf4e1f86a11460e81158e7","title":"Expand Emergency Power to HVAC Systems","solicitation_number":"W912PL26S0052","notice_type":"r","first_type":"r","first_posted":"2026-09-04","last_posted":"2026-09-04","notices":1,"due_at":"2026-09-21T21:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T21:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PL","office_name":"W075 ENDIST LOS ANGELES","naics":null,"psc":null,"set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912PL26S0051","latest_notice_id":"41089e3c49a844089e5d3e6bd60c6bb2","title":"Rio de Flag Flood Risk Management Project","solicitation_number":"W912PL26S0051","notice_type":"r","first_type":"r","first_posted":"2026-09-04","last_posted":"2026-09-09","notices":2,"due_at":"2026-09-21T21:00:00Z","due_date":"2026-09-21","closes_at":"2026-09-21T21:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PL","office_name":"W075 ENDIST LOS ANGELES","naics":null,"psc":null,"set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912PL26RA027","latest_notice_id":"1946b27d85cf40339a04667cadde4e9a","title":"DISASTER RESILIENCY PROGRAM PHASE 3, CREECH AFB, NEVADA","solicitation_number":"W912PL26RA027","notice_type":"o","first_type":"p","first_posted":"2026-07-10","last_posted":"2026-08-25","notices":2,"due_at":"2026-09-24T21:00:00Z","due_date":"2026-09-24","closes_at":"2026-09-24T21:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PL","office_name":"W075 ENDIST LOS ANGELES","naics":"236220","psc":"Y1BZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912PL26S0053","latest_notice_id":"3161c7bd334547aebf6eefa3dc25e180","title":"Multiple Award Task Order Contract (MATOC) Healthcare Facility Construction, Repair, and Renovation Services, Arizona","solicitation_number":"W912PL26S0053","notice_type":"r","first_type":"r","first_posted":"2026-09-12","last_posted":"2026-09-12","notices":1,"due_at":"2026-09-28T21:00:00Z","due_date":"2026-09-28","closes_at":"2026-09-28T21:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PL","office_name":"W075 ENDIST LOS ANGELES","naics":null,"psc":null,"set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}