Presolicitation
USACE SPK DBB Construction - Natomas NPP - Sacramento, CA
W9123826BA013
Department of the Army, W075 Endist Sacramento. Water and Sewer Line and Related Structures Construction.
Response deadline
September 4, 2026 at 12:00 PM EDT
Closed 12 days ago. Posted July 21, 2026. Scheduled to archive September 19, 2026.
Description
As published on SAM.gov.
The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for design-bid-build (DBB) construction services to renovate three (3) pumping stations (the Named Pumping Plants (NPPs)) in the Natomas region of Sacramento, California (CA). In general, the work for each site is anticipated to consist of removing the discharge pipes that currently go through the levee and installing new discharge piping that will traverse over the levee.
Elkhorn Pumping Plant is an irrigation pumping plant located on the Sacramento River north of Interstate 5 and west of Highway 99 along the Garden Highway Levee at River Mile 73.6. The plant conveys water from the Sacramento River into the Natomas Mutual Water Company’s (NMWC) Elkhorn Irrigation System.
The work at this site is anticipated to include levee excavation, removal of existing piping and appurtenances, levee embankment backfill and compaction, installation of new piping, build up area, removal and replacement of a portion of Garden Highway pavement, installation of vacuum system and conduit, and replacement of fiber optic line conduit.
Riverside Pumping Plant is an irrigation pumping plant located on the Sacramento River north of Interstate 5 and west of Highway 99 along the Garden Highway Levee at River Mile 65.78 (Natomas Reach B). The plant conveys water from the Sacramento River into the NCMWC’s Riverside Irrigation Canal.
The work at this site is anticipated to include levee excavation, removal of existing piping and appurtenances, levee embankment backfill and compaction, installation of new piping, modification of existing maintenance ramp, removal and replacement of a portion of Garden Highway pavement, installation of vacuum system and conduit, and installation of underground conduit.
Pritchard Pumping Plant is an irrigation pumping plant located on the Sacramento River north of Interstate 5 and west of Highway 99 along the Garden Highway Levee at River Mile 75.0/Levee Mile 5.82 (Natomas Reach C). The plant conveys water from the Sacramento River into the NCMWC’s Elkhorn Irrigation Canal.
The work at this site is anticipated to include levee excavation, removal of existing piping and appurtenances, levee embankment backfill and compaction, installation of new piping, installation of vacuum system and conduit, and replacement of fiber optic line conduit.
The Government estimates that construction of the requirement can be completed within one-thousand-ninety-five (1095) calendar days from Contractor receipt of Notice to Proceed, with construction occurring sequentially over three (3) years at a rate of one (1) plant per construction season. This project will require Cybersecurity Maturity Model Certification (CMMC) Level 1 Self Certification. The Government estimates the target price range of the project to be between $10,000,000.00 and $13,000,000.00.
The Government intends to solicit the requirement as an Invitation for Bids (IFB) that will result in award of a firm-fixed price contract. The solicitation is anticipated to be issued using North American Industrial Classification System (NAICS) code 237110, Water and Sewer Line and Related Structures Construction. The small business size standard for this NAICS, as established by the United States Small Business Administration (SBA), is $45,000,000.00 annual revenue.
The Product Service Code (PSC) is anticipated to be Z2NE, Repair or Alteration of Water Supply Facilities.
The solicitation is anticipated to be issued unrestricted, i.e., with full and open competition, through the Procurement Integrated Enterprise Environment (PIEE - https://piee.eb.mil) and Governmentwide Point of Entry, the System for Award Management (SAM - www.SAM.gov) in August 2026 with bids tentatively due in September 2026. Requirements for an approved Subcontracting plan from an "other than small" awardee will be included in the solicitation and subsequent award.
If the Government conducts a pre-bid conference and/or site visit, the date, time, location, and access requirements will be identified in any forthcoming solicitation. Please DO NOT request an updated schedule if estimated dates are surpassed; the Government will release all information publicly through PIEE and SAM when updates are available. Requests for schedule updates may be ignored.
The anticipated solicitation and attachments may be posted in Portable Document Format (.pdf) which will require Adobe Acrobat Reader to open and view files. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. All prospective Offerors must be registered in the PIEE system at least one (1) week prior to the anticipated bid due date. Registration is not required to download any forthcoming solicitation documents, plans, and/or specifications, but IS required to submit a bid.
Copies of the solicitation and attachments will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. Failure to register in PIEE will prevent submission of bids as the Government will not accept them by any other means. See linked PIEE registration instructions and web-based training for information about how to access the PIEE Solicitation Module and submit bids.
All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines.
It is anticipated that any future solicitation and/or resulting contract will be subject to the E-Verify Employment Eligibility Verification Program (http://www.uscis.gov/e-verify) and sustainable acquisition requirements and/or high-performance sustainable building design and construction practices (https://www.epa.gov/greeningepa/guiding-principles-federal-leadership-highperformance-and-sustainable-buildings).
Further, one or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 21, 2026
Presolicitation
Due September 4, 2026 at 12:00 PM EDT. SAM.gov, notice 79398047ad84486b8baa7ae398a26ac9
Points of contact
- Antonina Bealantonina.beal@usace.army.mil9165577543
Also open from this buyer
- USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CASolicitationSmall businessNAICS 237990CaliforniaW9123826BA010Closes todaySep 16
- IIS USFS Tanbark Hazard Tree RemovalSolicitationSmall businessNAICS 561730CaliforniaW9123826QA035Closes in 6 daysSep 22
- $625M USACE SPD Vertical AE Design MATOCSolicitationNAICS 541330W9123826RA008Closes in 12 daysSep 28
- USACE SPK Construction - Natomas PP5, Sacramento, CASolicitationNAICS 237990CaliforniaW9123826BA012Closes in 13 daysSep 29
- Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CASolicitationNAICS 238210CaliforniaW9123826RA002Closes in 19 daysOct 5