Presolicitation
Military Ocean Terminal Concord (MOTCO) Berms Construction and Dredging Project
W912P725BLI01
Department of the Army, W075 Endist San Fran. Other Heavy and Civil Engineering Construction.
Response deadline
June 6, 2025 at 7:00 PM EDT
Closed 514 days ago. Posted May 22, 2025. Scheduled to archive June 6, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
131 like it are open now in other heavy and civil engineering construction
- USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Department of the Army, W075 Endist Sacramento
SolicitationNAICS 237990Sacramento, CAW9123826BA013Closes tomorrowNov 3 - FWS - Pixley NWR Water Recirculation Design-Build
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 237990California140FF027R0003Closes in 28 daysNov 30 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes todayNov 2
All 131 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
This acquisition is proceeding as Full and Open, Invitation for Bid (IFB). This Procurement will be conducted under FSC CODE:
Y1KF, NAICS Code: 237990. The size standard for this code is $45,000,000.
All questions should be directed to the Contract Specialist, Lisa Ip: Lisa.I.Ip@usace.army.mil.Estimated Cost Range is between $10,000,000 - $25,000,000.JOB DESCRIPTION: The work includes the dredging of MOTCO wharves 2 and 3 to -35-ft (MLLW) plus 1-ft of paid over-depth and transporting of the dredged material per the requirements in specification, Munitions and Explosives of Concern (MEC) screening of dredged material to 3 inches, MEC clearing of the detention basin and borrow area, construction of new berms and installation of reinforced polyethyline liners in the detention basin cells 1 and 2, discharge of effluent water from the detention basin cells 1 and 2 to the local wastewater system in accordance with the Delta Diablo Special Discharge Permit and disposal of MEC Debris.
All material is suitable and shall be taken for disposal at the Detention Basin Cells 1 and 2.This requirement is for Full and Open Competition. It will be issued as an Invitation for Bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. The solicitation will be available on/about 09 June 2025 for viewing/downloading the solicitation and documents.ALL BIDS will be due on/about 09 July 2025 at 01:00 PM PDT. The specific date and time will be identified in the solicitation.
BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS.
NOTE:a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers.b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml.c) Offers MUST BE submitted electronically through the PIEE website.d) Registration should be completed one (1) week prior to the anticipated solicitation release date.
USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.e) See attachments PIEE Solicitation Module Vendor Access Instructions, SOP PIEE Proposal Manager Offeror, and SOP PIEE Posting Offer for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 22, 2025
Presolicitation
Due June 6, 2025 at 7:00 PM EDT. SAM.gov, notice 5cbd38ea15c145dd98250124896e0bf3
Points of contact
- Lisa Iplisa.i.ip@usace.army.mil415-503-6877
- Mary Fronckmary.fronck@usace.army.mil4152382899