Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Award notice

South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)

191BWC24C0008P00012

International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm.. Water and Sewer Line and Related Structures Construction.

Awarded

PCL Construction Inc. dba PCL Construction Services

$552,372,021.00 on the award notice, September 29, 2026, contract 191BWC24C0006P00001

Get the next one like this from International Boundary and Water Commission: US-Mexico by email, the day it is posted.Find my opportunities

This one was awarded in 2026

25 like it are open now in water and sewer line and related structures construction

All 25 open in water and sewer line and related structures construction

Description

As published on SAM.gov.

The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:

Early Work Package (EWP) 1C – Replacement In Kind

Final Construction Price: $13,147,453

Scope includes:

  • Removal and replacement of existing roofs.
  • Replacement of process equipment and piping.
  • Replacement of electrical equipment.
  • Replacement of odor control media.
  • Installation of new window sealants.
  • Replacement of coiling doors.
  • Replacement of emergency showers and eyewashes.
  • Painting and coating of existing facilities. 

Early Work Package (EWP) 3B – Early Procurement

Final Construction Price: $25,693,528

Scope includes procurement of critical long-lead equipment, including:

  • Standby generators and associated switchgear.
  • Medium-voltage switchgear.
  • Positive displacement blowers.
  • Submersible solids-handling pumps.
  • Dewatering centrifuges.
  • Stainless steel slide gates.
  • Stop logs. 

Early Work Package (EWP) 4 – Major Concrete Structures

Final Construction Price: $37,468,188

Scope includes:

  • Construction of major concrete structures for new Headworks facilities.
  • Primary Sedimentation Tanks 6 and 7.
  • Storage Warehouse.
  • New influent and drainage infrastructure.
  • Associated piping, carpentry, architectural, mechanical, electrical, and support features. 

Phase 1 Base Construction Expansion

Final Construction Price: $369,613,306

Scope includes:

  • New Headworks facility with integrated pump station.
  • Screening and grit removal systems.
  • Primary sedimentation expansion.
  • Centralized odor control facilities.
  • Waste activated sludge thickening and storage facilities.
  • Dewatering upgrades.
  • Lime storage/feed and truck loadout facilities.
  • Storage warehouse.
  • Chlorination storage facility.
  • Administrative building expansion.
  • Multiple electrical buildings.
  • New electrical service, generators, utility distribution systems, process piping, and site work.
  • Rehabilitation of existing activated sludge tanks and lime silos.
  • Engineering services during construction and procurement of the effluent meter and bypass piping. 

Construction Allowances

The contract also increases CLIN 008 Construction Allowances by $9,804,886, increasing the allowance amount from $1,783,374 to $11,588,260 to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]

Period of Performance

The base construction period of performance has been revised to 1,643 calendar days (54 months) from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion. 

Award Value

  • Previous Contract Value: $106,449,546
  • Modification Increase: $445,922,475
  • Revised Total Contract Value: $552,372,021 

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 13, 2026

    Award notice

    Awarded to PCL Construction Inc. dba PCL Construction Services for $552,372,021. SAM.gov, notice fb3dc2bfe38f4cadad0b01ec41e87e68

    1 revisions on SAM
    • October 13, 2026: publish, award notice

Points of contact