Sources sought
LB Lateral Water Line and Facilities Replacement for Wastewater System
140RR027R0014
Departmental Offices, Reclamation Contracting Activity. Water and Sewer Line and Related Structures Construction.
Offers due
November 11, 2026 at 8:00 PM EST
12 days from now. Posted October 27, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- RELAYSolicitationEDWOSBNAICS 335314Anywhere in the US140RR027Q0016Closes in 3 daysNov 3
- EC-ECAO Exterior Door ReplacementSources soughtNAICS 238350Colorado140RR027Q0018Closes in 4 daysNov 4
- Closes in 4 daysNov 4
Similar, open now
- Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Department of the Army, W072 Endist Louisville
Sources soughtNAICS 237110Lockwood, CAW912QR-PDB-FHLWATERCloses in 3 daysNov 3 - USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA
Department of the Army, W075 Endist Sacramento
Sources soughtNAICS 237110Copperopolis, CAW9123827X1CHGCloses in 37 daysDec 7 - BRINE PIPELINE ACCESS IMPROVEMENTS
Department of the Army, W075 Endist Los Angeles
PresolicitationSmall businessNAICS 237110CaliforniaW912PL26BA002Closes in 96 daysFeb 4, 2027
All 24 open in water and sewer line and related structures construction
Description
As published on SAM.gov.
This sources sought notice is for market research and acquisition planning purposes only. No formal solicitation for this work exists at this time.
The work is located at the Oak Shores and Smittle Recreation Areas located in Napa County, California.
Interested parties should include the following information in their response:
(a) Business name, address, cage code, size classification based on NAICS size standard, socioeconomic classification (i.e. HUBZone; 8(a), etc.), and a point of contact;
(b) A positive statement of your intention to submit an offer for this solicitation as a prime contractor;
(c) Evidence of your experience performing work similar in type and scope to the work in this announcement within the last five years. The evidence should include: contract numbers, project titles, dollar amounts and points of contacts with telephone numbers. Please do not include more than three past projects; and
(d) Include attachments cataloging the company's equipment assets, personnel resources and financial resources that demonstrate company responsibility and capability to perform required work.
(e) If bonding is required, also provide evidence of your bonding capacity;
All interested parties are encouraged to respond to this notice, by e-mail to Marianna_mezentseva@ios.doi.gov not later than 5PM PDT on November 11, 2026. The information provided in this announcement is all information the Government has available at this time. There are no specifications, drawings, bid packages, or source lists available.
System for Award Management (SAM) applies to this procurement. Prospective contractors must be registered in the System for Award Management (SAM) prior to award. Lack of registration in the SAM database will make an offeror ineligible for award. Information on SAM registration can be obtained via the Internet at http://www.sam.gov
PRINCIPAL COMPONENTS OF WORK:
¿ Replace 2¿ gate lateral valve at Main rated for 200 psi.
¿ Install N30 utility valve box w/water on lid, and appropriate quantity of risers to surface grade at Main lateral shut off 2¿ valve
¿ Reduce to 1¿ for lateral pipe to C.S. Install 1¿ lateral water line from main line 2¿ valve to PRV and 1¿ gate valve at rear of C.S. at Chase room
¿ Install 1¿ pressure reducing valve and 1¿ gate valve at rear of C.S. at Chase room Exterior in the proximity
¿ Install 1¿ pressure reducing valve and 1¿ gate valve rated for 200 psi.
¿ Install N30 utility valve box w/water on lid, and appropriate quantity of risers to surface grade over 1¿ PRV and gate valve
¿ Drill holes in brick on each side of C.S. Chase room access door approx. 1 ft above exterior floor
¿ Install 1¿ galvanized pipe from exterior PRV/gate valve, split into 2 lines, and run pipe in each hole to near interior copper line connection point. Fill wall holes with concrete.
¿ Install interior PRV and 1¿ gate valve, and tee with pressure gauge (1¿ face 0 to 60 psi) after PRV between 1¿ galvanized pipe and copper pipe, connect to copper pipe on each side of Chase room
¿ Flush and pressure test all connections prior to backfill of excavation from main lie to copper line connections interior of Chase room
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 27, 2026
Sources sought
Due November 11, 2026 at 8:00 PM EST. SAM.gov, notice f54174631fdf46668d424fa88a3a8bf1
1 revisions on SAM
- October 27, 2026: publish, sources sought
Points of contact
- Ahola, Roxanarahola@usbr.gov9169785549