{"canonical":"https://abierto.us/opportunities/191bwc24c0008p00012","key":"191BWC24C0008P00012","url":"https://abierto.us/opportunities/191bwc24c0008p00012","title":"South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)","solicitation_number":"191BWC24C0008P00012","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":null,"first_posted":"2026-10-13","last_posted":"2026-10-13","department":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","subagency":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","office":"INTERNAT. BOUNDARY AND WATER COMM.","naics":"237110","psc":"Y1ND","set_aside":null,"place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06073","place_county_name":"San Diego County","place_city":null,"place_city_name":null,"winner":"PCL Construction Inc. dba PCL Construction Services","award_amount":"552372021.00","publications":[{"notice_id":"fb3dc2bfe38f4cadad0b01ec41e87e68","title":"South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)","solicitation_number":"191BWC24C0008P00012","notice_type":"a","base_type":"a","posted":"2026-10-13","posted_at":"2026-10-13T14:25:28.965Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2026-10-28","removed_at":null,"award_number":"191BWC24C0006P00001","awardee_name":"PCL Construction Inc. dba PCL Construction Services","amount":"552372021.00","link_sam":"https://sam.gov/workspace/contract/opp/fb3dc2bfe38f4cadad0b01ec41e87e68/view","enriched":true,"history":[{"index":1,"title":"South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T14:25:28.965Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"fb3dc2bfe38f4cadad0b01ec41e87e68","solicitation_number":"191BWC24C0008P00012"}]}],"latest_notice_id":"fb3dc2bfe38f4cadad0b01ec41e87e68","first_type":"a","notices":[{"award":{"date":"2026-09-29","amount":"552372021.00","number":"191BWC24C0006P00001","awardee":{"raw":"PCL Construction Inc. dba PCL Construction Services Tempe AZ 85284 USA","name":"PCL Construction Inc. dba PCL Construction Services","location":{"zip":"85284","city":{"code":"73000","name":"Tempe"},"state":{"code":"AZ","name":"Arizona"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2026-10-13","posted_at":"2026-10-13T14:25:28.965Z","award_date":"2026-09-29","created_at":"2026-10-13T14:13:52.548Z","modified_at":"2026-10-13T14:25:28.969Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/fb3dc2bfe38f4cadad0b01ec41e87e68/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)","agency":{"office":{"code":"199401","name":"INTERNAT. BOUNDARY AND WATER COMM."},"subtier":{"code":"19BM","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"department":{"code":"019","name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO"},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"organization_id":"500025680","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2026-10-28","archive_type":"auto_custom"},"history":[{"index":1,"title":"South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-13T14:25:28.965Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"fb3dc2bfe38f4cadad0b01ec41e87e68","solicitation_number":"191BWC24C0008P00012"}],"contacts":[{"name":"Philip Johnson","role":"primary","email":"philip.johnson@ibwc.gov"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"fb3dc2bfe38f4cadad0b01ec41e87e68","lineage_id":"fb3dc2bfe38f4cadad0b01ec41e87e68","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T07:16:19.788570065Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"41eb71cbb11d7265b7d0141a8104a834-25\"","fetched_at":"2026-10-14T03:54:05.500072632Z","row_sha256":"9102c968fea06cfb1214b24218e1a98d24a09b68bd7077792d166b16508f93f2","last_modified":"2026-10-14T03:30:44Z"},"updated_at":"2026-10-14T07:16:19.788570065Z","first_seen_at":"2026-10-14T03:54:05.500072632Z"},"description":{"html":"<p>The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:</p>\n\n<p>Early Work Package (EWP) 1C &ndash; Replacement In Kind</p>\n\n<p>Final Construction Price: <strong>$13,147,453</strong></p>\n\n<p>Scope includes:</p>\n\n<ul>\n\t<li>Removal and replacement of existing roofs.</li>\n\t<li>Replacement of process equipment and piping.</li>\n\t<li>Replacement of electrical equipment.</li>\n\t<li>Replacement of odor control media.</li>\n\t<li>Installation of new window sealants.</li>\n\t<li>Replacement of coiling doors.</li>\n\t<li>Replacement of emergency showers and eyewashes.</li>\n\t<li>Painting and coating of existing facilities.&nbsp;</li>\n</ul>\n\n<p>Early Work Package (EWP) 3B &ndash; Early Procurement</p>\n\n<p>Final Construction Price: <strong>$25,693,528</strong></p>\n\n<p>Scope includes procurement of critical long-lead equipment, including:</p>\n\n<ul>\n\t<li>Standby generators and associated switchgear.</li>\n\t<li>Medium-voltage switchgear.</li>\n\t<li>Positive displacement blowers.</li>\n\t<li>Submersible solids-handling pumps.</li>\n\t<li>Dewatering centrifuges.</li>\n\t<li>Stainless steel slide gates.</li>\n\t<li>Stop logs.&nbsp;</li>\n</ul>\n\n<p>Early Work Package (EWP) 4 &ndash; Major Concrete Structures</p>\n\n<p>Final Construction Price: <strong>$37,468,188</strong></p>\n\n<p>Scope includes:</p>\n\n<ul>\n\t<li>Construction of major concrete structures for new Headworks facilities.</li>\n\t<li>Primary Sedimentation Tanks 6 and 7.</li>\n\t<li>Storage Warehouse.</li>\n\t<li>New influent and drainage infrastructure.</li>\n\t<li>Associated piping, carpentry, architectural, mechanical, electrical, and support features.&nbsp;</li>\n</ul>\n\n<p>Phase 1 Base Construction Expansion</p>\n\n<p>Final Construction Price: <strong>$369,613,306</strong></p>\n\n<p>Scope includes:</p>\n\n<ul>\n\t<li>New Headworks facility with integrated pump station.</li>\n\t<li>Screening and grit removal systems.</li>\n\t<li>Primary sedimentation expansion.</li>\n\t<li>Centralized odor control facilities.</li>\n\t<li>Waste activated sludge thickening and storage facilities.</li>\n\t<li>Dewatering upgrades.</li>\n\t<li>Lime storage/feed and truck loadout facilities.</li>\n\t<li>Storage warehouse.</li>\n\t<li>Chlorination storage facility.</li>\n\t<li>Administrative building expansion.</li>\n\t<li>Multiple electrical buildings.</li>\n\t<li>New electrical service, generators, utility distribution systems, process piping, and site work.</li>\n\t<li>Rehabilitation of existing activated sludge tanks and lime silos.</li>\n\t<li>Engineering services during construction and procurement of the effluent meter and bypass piping.&nbsp;</li>\n</ul>\n\n<p>Construction Allowances</p>\n\n<p>The contract also increases CLIN 008 Construction Allowances by <strong>$9,804,886</strong>, increasing the allowance amount from <strong>$1,783,374</strong> to <strong>$11,588,260</strong> to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]</p>\n\n<p>Period of Performance</p>\n\n<p>The base construction period of performance has been revised to <strong>1,643 calendar days (54 months)</strong> from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion.&nbsp;</p>\n\n<p>Award Value</p>\n\n<ul>\n\t<li>Previous Contract Value: <strong>$106,449,546</strong></li>\n\t<li>Modification Increase: <strong>$445,922,475</strong></li>\n\t<li>Revised Total Contract Value: <strong>$552,372,021</strong>&nbsp;</li>\n</ul>","text":"The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:\n\nEarly Work Package (EWP) 1C – Replacement In Kind\n\nFinal Construction Price: $13,147,453\n\nScope includes:\n\n• Removal and replacement of existing roofs.\n\n• Replacement of process equipment and piping.\n\n• Replacement of electrical equipment.\n\n• Replacement of odor control media.\n\n• Installation of new window sealants.\n\n• Replacement of coiling doors.\n\n• Replacement of emergency showers and eyewashes.\n\n• Painting and coating of existing facilities.\n\nEarly Work Package (EWP) 3B – Early Procurement\n\nFinal Construction Price: $25,693,528\n\nScope includes procurement of critical long-lead equipment, including:\n\n• Standby generators and associated switchgear.\n\n• Medium-voltage switchgear.\n\n• Positive displacement blowers.\n\n• Submersible solids-handling pumps.\n\n• Dewatering centrifuges.\n\n• Stainless steel slide gates.\n\n• Stop logs.\n\nEarly Work Package (EWP) 4 – Major Concrete Structures\n\nFinal Construction Price: $37,468,188\n\nScope includes:\n\n• Construction of major concrete structures for new Headworks facilities.\n\n• Primary Sedimentation Tanks 6 and 7.\n\n• Storage Warehouse.\n\n• New influent and drainage infrastructure.\n\n• Associated piping, carpentry, architectural, mechanical, electrical, and support features.\n\nPhase 1 Base Construction Expansion\n\nFinal Construction Price: $369,613,306\n\nScope includes:\n\n• New Headworks facility with integrated pump station.\n\n• Screening and grit removal systems.\n\n• Primary sedimentation expansion.\n\n• Centralized odor control facilities.\n\n• Waste activated sludge thickening and storage facilities.\n\n• Dewatering upgrades.\n\n• Lime storage/feed and truck loadout facilities.\n\n• Storage warehouse.\n\n• Chlorination storage facility.\n\n• Administrative building expansion.\n\n• Multiple electrical buildings.\n\n• New electrical service, generators, utility distribution systems, process piping, and site work.\n\n• Rehabilitation of existing activated sludge tanks and lime silos.\n\n• Engineering services during construction and procurement of the effluent meter and bypass piping.\n\nConstruction Allowances\n\nThe contract also increases CLIN 008 Construction Allowances by $9,804,886, increasing the allowance amount from $1,783,374 to $11,588,260 to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]\n\nPeriod of Performance\n\nThe base construction period of performance has been revised to 1,643 calendar days (54 months) from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion.\n\nAward Value\n\n• Previous Contract Value: $106,449,546\n\n• Modification Increase: $445,922,475\n\n• Revised Total Contract Value: $552,372,021","origin":"detail"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"191BWC24C0008P00012","place_of_performance":{"zip":"92173","city":{"code":"70252","name":"San Ysidro"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1ND"}],"due_at":null,"due_date":null,"closes_at":null,"awardable":false,"dept_key":"d-019","dept_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","sub_key":"s-19BM","sub_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","office_key":"o-199401","office_name":"INTERNAT. BOUNDARY AND WATER COMM.","state":"CA","county":"06073","county_name":"San Diego County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":"552372021.00","linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-29T05:12:36.558642Z","principal_notice_id":"fb3dc2bfe38f4cadad0b01ec41e87e68","description":{"text":"The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:\n\nEarly Work Package (EWP) 1C – Replacement In Kind\n\nFinal Construction Price: $13,147,453\n\nScope includes:\n\n• Removal and replacement of existing roofs.\n\n• Replacement of process equipment and piping.\n\n• Replacement of electrical equipment.\n\n• Replacement of odor control media.\n\n• Installation of new window sealants.\n\n• Replacement of coiling doors.\n\n• Replacement of emergency showers and eyewashes.\n\n• Painting and coating of existing facilities.\n\nEarly Work Package (EWP) 3B – Early Procurement\n\nFinal Construction Price: $25,693,528\n\nScope includes procurement of critical long-lead equipment, including:\n\n• Standby generators and associated switchgear.\n\n• Medium-voltage switchgear.\n\n• Positive displacement blowers.\n\n• Submersible solids-handling pumps.\n\n• Dewatering centrifuges.\n\n• Stainless steel slide gates.\n\n• Stop logs.\n\nEarly Work Package (EWP) 4 – Major Concrete Structures\n\nFinal Construction Price: $37,468,188\n\nScope includes:\n\n• Construction of major concrete structures for new Headworks facilities.\n\n• Primary Sedimentation Tanks 6 and 7.\n\n• Storage Warehouse.\n\n• New influent and drainage infrastructure.\n\n• Associated piping, carpentry, architectural, mechanical, electrical, and support features.\n\nPhase 1 Base Construction Expansion\n\nFinal Construction Price: $369,613,306\n\nScope includes:\n\n• New Headworks facility with integrated pump station.\n\n• Screening and grit removal systems.\n\n• Primary sedimentation expansion.\n\n• Centralized odor control facilities.\n\n• Waste activated sludge thickening and storage facilities.\n\n• Dewatering upgrades.\n\n• Lime storage/feed and truck loadout facilities.\n\n• Storage warehouse.\n\n• Chlorination storage facility.\n\n• Administrative building expansion.\n\n• Multiple electrical buildings.\n\n• New electrical service, generators, utility distribution systems, process piping, and site work.\n\n• Rehabilitation of existing activated sludge tanks and lime silos.\n\n• Engineering services during construction and procurement of the effluent meter and bypass piping.\n\nConstruction Allowances\n\nThe contract also increases CLIN 008 Construction Allowances by $9,804,886, increasing the allowance amount from $1,783,374 to $11,588,260 to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]\n\nPeriod of Performance\n\nThe base construction period of performance has been revised to 1,643 calendar days (54 months) from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion.\n\nAward Value\n\n• Previous Contract Value: $106,449,546\n\n• Modification Increase: $445,922,475\n\n• Revised Total Contract Value: $552,372,021","html":"<p>The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:</p>\n\n<p>Early Work Package (EWP) 1C &ndash; Replacement In Kind</p>\n\n<p>Final Construction Price: <strong>$13,147,453</strong></p>\n\n<p>Scope includes:</p>\n\n<ul>\n\t<li>Removal and replacement of existing roofs.</li>\n\t<li>Replacement of process equipment and piping.</li>\n\t<li>Replacement of electrical equipment.</li>\n\t<li>Replacement of odor control media.</li>\n\t<li>Installation of new window sealants.</li>\n\t<li>Replacement of coiling doors.</li>\n\t<li>Replacement of emergency showers and eyewashes.</li>\n\t<li>Painting and coating of existing facilities.&nbsp;</li>\n</ul>\n\n<p>Early Work Package (EWP) 3B &ndash; Early Procurement</p>\n\n<p>Final Construction Price: <strong>$25,693,528</strong></p>\n\n<p>Scope includes procurement of critical long-lead equipment, including:</p>\n\n<ul>\n\t<li>Standby generators and associated switchgear.</li>\n\t<li>Medium-voltage switchgear.</li>\n\t<li>Positive displacement blowers.</li>\n\t<li>Submersible solids-handling pumps.</li>\n\t<li>Dewatering centrifuges.</li>\n\t<li>Stainless steel slide gates.</li>\n\t<li>Stop logs.&nbsp;</li>\n</ul>\n\n<p>Early Work Package (EWP) 4 &ndash; Major Concrete Structures</p>\n\n<p>Final Construction Price: <strong>$37,468,188</strong></p>\n\n<p>Scope includes:</p>\n\n<ul>\n\t<li>Construction of major concrete structures for new Headworks facilities.</li>\n\t<li>Primary Sedimentation Tanks 6 and 7.</li>\n\t<li>Storage Warehouse.</li>\n\t<li>New influent and drainage infrastructure.</li>\n\t<li>Associated piping, carpentry, architectural, mechanical, electrical, and support features.&nbsp;</li>\n</ul>\n\n<p>Phase 1 Base Construction Expansion</p>\n\n<p>Final Construction Price: <strong>$369,613,306</strong></p>\n\n<p>Scope includes:</p>\n\n<ul>\n\t<li>New Headworks facility with integrated pump station.</li>\n\t<li>Screening and grit removal systems.</li>\n\t<li>Primary sedimentation expansion.</li>\n\t<li>Centralized odor control facilities.</li>\n\t<li>Waste activated sludge thickening and storage facilities.</li>\n\t<li>Dewatering upgrades.</li>\n\t<li>Lime storage/feed and truck loadout facilities.</li>\n\t<li>Storage warehouse.</li>\n\t<li>Chlorination storage facility.</li>\n\t<li>Administrative building expansion.</li>\n\t<li>Multiple electrical buildings.</li>\n\t<li>New electrical service, generators, utility distribution systems, process piping, and site work.</li>\n\t<li>Rehabilitation of existing activated sludge tanks and lime silos.</li>\n\t<li>Engineering services during construction and procurement of the effluent meter and bypass piping.&nbsp;</li>\n</ul>\n\n<p>Construction Allowances</p>\n\n<p>The contract also increases CLIN 008 Construction Allowances by <strong>$9,804,886</strong>, increasing the allowance amount from <strong>$1,783,374</strong> to <strong>$11,588,260</strong> to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]</p>\n\n<p>Period of Performance</p>\n\n<p>The base construction period of performance has been revised to <strong>1,643 calendar days (54 months)</strong> from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion.&nbsp;</p>\n\n<p>Award Value</p>\n\n<ul>\n\t<li>Previous Contract Value: <strong>$106,449,546</strong></li>\n\t<li>Modification Increase: <strong>$445,922,475</strong></li>\n\t<li>Revised Total Contract Value: <strong>$552,372,021</strong>&nbsp;</li>\n</ul>","origin":"detail"},"contacts":[{"name":"Philip Johnson","role":"primary","email":"philip.johnson@ibwc.gov"}],"place_of_performance":{"zip":"92173","city":{"code":"70252","name":"San Ysidro"},"state":{"code":"CA","name":"California"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"79902","city":"El Paso","state":"TX","country":"USA"},"naics_codes":["237110"],"award":{"date":"2026-09-29","amount":"552372021.00","number":"191BWC24C0006P00001","awardee":{"raw":"PCL Construction Inc. dba PCL Construction Services Tempe AZ 85284 USA","name":"PCL Construction Inc. dba PCL Construction Services","location":{"zip":"85284","city":{"code":"73000","name":"Tempe"},"state":{"code":"AZ","name":"Arizona"},"country":{"code":"USA","name":"UNITED STATES"}}}},"attachments":[],"awards":[],"related":[{"key":"191BWC26R0009","latest_notice_id":"5e94c48ddf4f4a3cbae1a06295eb4efa","title":"Operations and Maintenance (O&M) Services for the SBIWTP","solicitation_number":"191BWC26R0009","notice_type":"o","first_type":"o","first_posted":"2026-09-25","last_posted":"2026-10-20","notices":2,"due_at":"2027-01-06T21:00:00Z","due_date":"2027-01-06","closes_at":"2027-01-06T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-019","dept_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","sub_key":"s-19BM","sub_name":"INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO","office_key":"o-199401","office_name":"INTERNAT. BOUNDARY AND WATER COMM.","naics":"221320","psc":"M1ND","set_aside":null,"state":"CA","county":"06073","county_name":"San Diego County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-21T04:01:16.865590Z"}],"similar_open":[{"key":"W912QRPDBFHLWATER","latest_notice_id":"a0eaf34784a742eea4712f941a0a7085","title":"Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements","solicitation_number":"W912QR-PDB-FHLWATER","notice_type":"r","first_type":"r","first_posted":"2026-10-26","last_posted":"2026-10-26","notices":1,"due_at":"2026-11-03T18:00:00Z","due_date":"2026-11-03","closes_at":"2026-11-03T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912QR","office_name":"W072 ENDIST LOUISVILLE","naics":"237110","psc":null,"set_aside":null,"state":"CA","county":"06053","county_name":"Monterey County","city":"0642146","city_name":"Lockwood","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-27T04:48:32.497036Z"},{"key":"140RR027R0014","latest_notice_id":"f54174631fdf46668d424fa88a3a8bf1","title":"Y--LB Lateral Water Line and Facilities Replacement for Wastewater System","solicitation_number":"140RR027R0014","notice_type":"r","first_type":"r","first_posted":"2026-10-27","last_posted":"2026-10-27","notices":1,"due_at":"2026-11-12T01:00:00Z","due_date":"2026-11-11","closes_at":"2026-11-12T01:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140RR0","office_name":"RECLAMATION CONTRACTING ACTIVITY","naics":"237110","psc":"Y1PZ","set_aside":null,"state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"description","state_evidence":"S AND SMITTLE RECREATION AREAS LOCATED IN NAPA COUNTY, CALIFORNIA","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"},{"key":"W9123827X1CHG","latest_notice_id":"737fe18fcbda4c9380639dde065f1a07","title":"USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA","solicitation_number":"W9123827X1CHG","notice_type":"r","first_type":"r","first_posted":"2026-10-08","last_posted":"2026-10-08","notices":1,"due_at":"2026-12-07T16:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"237110","psc":"Y1PD","set_aside":null,"state":"CA","county":"06009","county_name":"Calaveras County","city":"0616210","city_name":"Copperopolis","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-09T04:30:03.659222Z"}],"similar_open_total":25}