# South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)

Canonical: https://abierto.us/opportunities/191bwc24c0008p00012

- Solicitation number: 191BWC24C0008P00012
- Notice type: Award notice
- Status: Awarded to PCL Construction Inc. dba PCL Construction Services for $552,372,021.00
- Department: International Boundary and Water Commission: US-Mexico
- Contracting office: Internat. Boundary and Water Comm. (199401)
- NAICS: 237110 Water and Sewer Line and Related Structures Construction
- Product or service code: Y1ND Construction Of Sewage And Waste Facilities
- Place of performance: San Ysidro, California
- County: San Diego County (FIPS 06073). https://abierto.us/counties/san-diego-county-ca-06073
- First posted: October 13, 2026
- Last posted: October 13, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/fb3dc2bfe38f4cadad0b01ec41e87e68/view

## Description

The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages:

Early Work Package (EWP) 1C &ndash; Replacement In Kind

Final Construction Price: $13,147,453

Scope includes:

	Removal and replacement of existing roofs.

	Replacement of process equipment and piping.

	Replacement of electrical equipment.

	Replacement of odor control media.

	Installation of new window sealants.

	Replacement of coiling doors.

	Replacement of emergency showers and eyewashes.

	Painting and coating of existing facilities.

Early Work Package (EWP) 3B &ndash; Early Procurement

Final Construction Price: $25,693,528

Scope includes procurement of critical long-lead equipment, including:

	Standby generators and associated switchgear.

	Medium-voltage switchgear.

	Positive displacement blowers.

	Submersible solids-handling pumps.

	Dewatering centrifuges.

	Stainless steel slide gates.

	Stop logs.

Early Work Package (EWP) 4 &ndash; Major Concrete Structures

Final Construction Price: $37,468,188

Scope includes:

	Construction of major concrete structures for new Headworks facilities.

	Primary Sedimentation Tanks 6 and 7.

	Storage Warehouse.

	New influent and drainage infrastructure.

	Associated piping, carpentry, architectural, mechanical, electrical, and support features.

Phase 1 Base Construction Expansion

Final Construction Price: $369,613,306

Scope includes:

	New Headworks facility with integrated pump station.

	Screening and grit removal systems.

	Primary sedimentation expansion.

	Centralized odor control facilities.

	Waste activated sludge thickening and storage facilities.

	Dewatering upgrades.

	Lime storage/feed and truck loadout facilities.

	Storage warehouse.

	Chlorination storage facility.

	Administrative building expansion.

	Multiple electrical buildings.

	New electrical service, generators, utility distribution systems, process piping, and site work.

	Rehabilitation of existing activated sludge tanks and lime silos.

	Engineering services during construction and procurement of the effluent meter and bypass piping.

Construction Allowances

The contract also increases CLIN 008 Construction Allowances by $9,804,886, increasing the allowance amount from $1,783,374 to $11,588,260 to address uncertain construction elements and field conditions associated with EWP-1C and Phase 1 construction activities. [191BWC24C0008 P00012 | PDF]

Period of Performance

The base construction period of performance has been revised to 1,643 calendar days (54 months) from issuance of the Base Construction Notice to Proceed (NTP). Construction closeout requirements remain unchanged and must be completed within 180 calendar days following construction completion.

Award Value

	Previous Contract Value: $106,449,546

	Modification Increase: $445,922,475

	Revised Total Contract Value: $552,372,021

## Open now in the same industry

25 open in NAICS 237110.

- Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements (W912QR-PDB-FHLWATER), due November 3, 2026 at 1:00 PM EST. https://abierto.us/opportunities/w912qrpdbfhlwater
- LB Lateral Water Line and Facilities Replacement for Wastewater System (140RR027R0014), due November 11, 2026 at 8:00 PM EST. https://abierto.us/opportunities/140rr027r0014
- USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA (W9123827X1CHG), due December 7, 2026 at 11:00 AM EST. https://abierto.us/opportunities/w9123827x1chg

## Publications

- October 13, 2026: Award notice. Notice fb3dc2bfe38f4cadad0b01ec41e87e68. https://sam.gov/workspace/contract/opp/fb3dc2bfe38f4cadad0b01ec41e87e68/view