Solicitation
Purchase of 2 Sewer Cleaning and Sludge Disposal Pump Trucks
W912PB26QA093
Department of the Army, 0409 Aq HQ Contract. Heavy Duty Truck Manufacturing.
Response deadline
September 23, 2026 at 4:00 AM EDT
Closed 38 days ago. Posted September 10, 2026, first published August 26, 2026. Scheduled to archive October 8, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed 38 days ago
3 like it are open now in heavy duty truck manufacturing
- Articulating Aerial Fire Truck
Departmental Offices, Reclamation Contracting Activity
Sources soughtNAICS 336120Anywhere in the US140RR027Q0033Closes in 12 daysNov 12 - Common Tactical Truck (CTT) Commercial Solutions Opening (CSO)
Department of the Army, W6QK Acc- Dta
SolicitationNAICS 336120Anywhere in the USW912CH-26-S-C001Closes in 1235 daysMar 19, 2030 - Heavy Equipment Program - Sweeper and Scrubber Equipment SPE8EC25R0003
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationNAICS 336120Anywhere in the USHEPP_10-17-2025Closes in 16 daysNov 16
Description
As published on SAM.gov.
This solicitation is for a contractor to provide two High-Pressure Flushing and Suction-Pressure Tanker trucks. These vehicles are intended for a range of municipal and industrial sanitation tasks, including sewage removal, cleaning of storm/sewer pipes, and emergency hazardous spill response.
The required trucks must be ADR-certified and modified to meet specific environmental and hazardous material transport regulations (Type Class AT/FL, Tank Code L4BH). Key specifications include:
-
Chassis: A heavy-duty, 3-axle (6x2) commercial truck chassis with a minimum Gross Vehicle Weight (GVW) of 28,000 kg and a diesel engine of at least 450 HP.
-
Tank: A minimum capacity of 14,000 liters, featuring an internal movable piston to create variable-capacity chambers for water and sludge.
-
Vacuum System: A rotary compressor vacuum pump with a minimum flow rate of 1,500 m³/h.
-
Flushing System: A high-pressure water pump capable of delivering a minimum of 300 liters/minute at 170 bar.
-
Ancillary Equipment: The vehicle must be delivered with all necessary support equipment, including a comprehensive nozzle package, a wireless remote control for boom and hose reel operation, and all ADR-required safety gear.
The contractor is also responsible for providing operating manuals, initial training for up to five government personnel, and a minimum 12-month comprehensive warranty on the tanker body and integrated systems.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 1-Product Specification Sludge Disposal Pump Trucks.pdf73 KB, August 26, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 26, 2026
Solicitation
Due September 8, 2026 at 4:00 AM EDT. SAM.gov, notice b2eaffe3456b49d3aae8d36093cfb626
2 revisions on SAM
- September 10, 2026: publish, solicitation
- August 26, 2026: publish, solicitation
September 10, 2026
Solicitation
Due September 23, 2026 at 4:00 AM EDT. SAM.gov, notice da45f3e500e64ba6931802ed93fdd729
2 revisions on SAM
- September 10, 2026: publish, solicitation
- August 26, 2026: publish, solicitation
Points of contact
- Yohannes Tekolayohannes.s.tekola.mil@army.mil
- Gus Wesselsgus.w.wessels.mil@army.mil