Skip to content
Abierto

Solicitation, total small business set-aside, first published as presolicitation

Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements

W9123825BA002

Department of the Army, W075 Endist Sacramento. Other Heavy and Civil Engineering Construction.

Awarded

CAM-DUTRA JV-II LLC

$5,828,823.11 obligated so far on USAspending

Description

As published on SAM.gov.

See attached Bid Abstract AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA).

The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River.

The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section.

The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
MVULGL7HL8C7
CAGE
9SXE5
Vendor location
Palo Alto, CA
Contract
W9123825CA009, definitive contract
Obligated
$5,828,823.11
Actions
6 between May 30, 2025 and February 25, 2026
Competition
Full and Open Competition After Exclusion of Sources, 4 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Sacramento River Erosion (Sre) C5 Pioneer Bridge Levee Improvements
Match
solicitation number W9123825BA002 equals the FPDS solicitation identifier; same awarding office W91238 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 5, 2025

    Presolicitation

    USACE SPK DBB Construction - Sacramento River Erosion Contract 5 Pioneer Bridge Levee Improvements- Sacramento, California

    Due May 2, 2025 at 1:00 PM EDT. SAM.gov, notice f6420f6861774dcf83aafb6d294ad39a

  2. March 20, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice 5d4262ae6fa944d5ab454c4bc8fa0bf6

  3. March 21, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice c93e68e17a6b4168b711454908e0fc78

  4. April 2, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice 092eb020dab84584b4a0d7601f674658

  5. April 3, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice fd6dfad732f94fb3938f11dd6846bf49

  6. April 18, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice ef64f8ce7b3940809d403aeed984e904

  7. April 25, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice c82c603206e74a06a2af42e9a1d730b9

Points of contact