Sources sought, first published as special notice
Supplemental Sources Sought - HSAAP Intake Facility and Pump House
W9123625S4001
Department of the Army, W2SD Endist Norfolk. Water and Sewer Line and Related Structures Construction.
Response deadline
April 22, 2025 at 10:00 AM EDT
Closed 515 days ago. Posted April 8, 2025, first published November 5, 2024. Scheduled to archive January 15, 2026.
Description
As published on SAM.gov.
Supplemental Sources Sought Notice Construction of New River Water Intake Facility and Pump House at Holston Army Ammunition Plant (HSAAP), Kingsport, TN. The Army Corps of Engineers—Norfolk District is conducting Supplemental Market Research to identify potential sources for construction of the facility identified. Holston Army Ammunition Plant (HSAAP) is a Government-Owned, Contractor-Operated (GOCO) explosives production facility located in Kingsport, TN. All production at HSAAP depends on river water.
HSAAP draws river water from the Holston River for process use in the plant. River water provides two primary functions: (1) Feedstock to the Filtered Water Plant, and (2) Non-contact Cooling Water (NCCW) for various process applications. River water is currently extracted through the existing pump house and intake on the east side of the plant.
The new river water intake facility and pump house will comply with the Clean Water Act (CWA) Rule 316(b) which provides protection to aquatic wildlife by reducing fish impingement mortality rates.
40 Code of Federal Regulations (CFR) § 125.94 identifies requirements for existing/new facilities to ensure compliance with Rule 316(b) such as (a) limiting the allowed velocity of the water flow through intake screens to 0.5 feet per second (fps), or (b) using a modified traveling screen that safely transports impinged organisms back to the source waterbody. Estimated intake capacity for river water is 80-96 million gallons per day (MGPD). Please review the attached document for further details.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 5, 2024
Special notice
Notice of Intent to Sole Source: New River Intake Facility at Holston Army Ammunition Plant
Due November 20, 2024 at 5:00 PM EST. SAM.gov, notice 497a4a8bd8044e6a90ddfc9b3eac1984
April 8, 2025
Sources sought
Due April 22, 2025 at 10:00 AM EDT. SAM.gov, notice ca35747854dc4300ad37ceef0528a5f0
Points of contact
- Raven D. Sasserraven.d.sasser@usace.army.mil7572017136
- Ekaterina Oxleyekaterina.oxley@usace.army.mil(757) 201-7026
Also open from this buyer
- DoWEA PMDM-NC IDIQ RFPSolicitationSmall businessNAICS 238220W9123626RA013Closes in 2 daysSep 21
- Water Intake Facility at Radford Army Ammunition PlantSources soughtNAICS 237110Radford, VAW9123627X1CJ7Closes in 9 daysSep 28
- Fort Lee Vehicle Recovery RangeSolicitation8(a)NAICS 236220Fort Lee, VAW9123626BA006Closes in 10 daysSep 29
- Gathright Dam Herbicide Service ContractSolicitationSmall businessNAICS 561730W9123626QA004Closes in 11 daysSep 30
- Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment ProjectSolicitationNAICS 237990Virginia Beach, VAW9123626BA011Closes in 13 daysOct 2