Combined synopsis and solicitation, total small business set-aside, first published as sources sought
Battery Install and Replacement
FA940124Q0035
Department of the Air Force, FA9401 377 MSG PK. Battery Manufacturing.
Response deadline
September 19, 2024 at 4:00 PM EDT
Closed 774 days ago. Posted September 17, 2024, first published May 17, 2024. Scheduled to archive October 4, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
20 like it are open now in battery manufacturing
- BATTERY ASSEMBLY
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 335910Anywhere in the USSPE7L727T0347Closes tomorrowNov 2 - BATTERY,NONRECHARGEABL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 335910Anywhere in the USSPE7L727T0357Closes tomorrowNov 2 - BATTERY ASSEMBLY
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 335910Anywhere in the USSPE7L727T0349Closes tomorrowNov 2
Description
As published on SAM.gov.
The Air Force has a requirement for the purchase of 12 sodium nickel battery modules to replace the existing battery modules. In addition, one 200-amp power inverter and 27 additional electrical outlets are required for the building.
Contractor must remove and dispose of existing lead-acid batteries, provide Ethernet remote monitoring capabilities, remove and dispose of existing power inverters and purchase and install replacement power inverters, and purchase and install overhead electrical outlets located in the areas of the batteries and inverters. Critical requirement to be met is that the battery system be 48 volts and provide 5 hours of power at the 120 amp maximum load.
Batteries must meet the following requirements: • Cycling Capability: 4.500 cycles (80% DOD) • Battery energy density 100÷120Wh/kg, 150-190Wh/lt • Shelf life (> 20 years) • Temperature Immunity (-40 ÷ +60°C) • No gas emissions • No flammable materials • No fire/water flood reaction • 100% recyclable • NO pollution materials • NO gas emissions Power inverters must be one 200-amp and one 100-amp for the two required power inverters for the building. Electrical outlets are to be 115V, 60 Hertz power.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 17, 2024
Sources sought
58 AMXS Deicer Repair Parts
Due May 28, 2024 at 2:00 PM EDT. SAM.gov, notice 25c79a366e3c4f0f85e78f9cd35a46b2
September 12, 2024
Combined synopsis and solicitation
Due September 19, 2024 at 4:00 PM EDT. SAM.gov, notice 40d3cf95c85f43c59f16984207523ba8
September 17, 2024
Combined synopsis and solicitation
Due September 19, 2024 at 4:00 PM EDT. SAM.gov, notice 47f6fc3eb55c42cc88ce24a547a91650
Points of contact
- Abigail Turnerabigail.turner.2@us.af.mil
- Rachel Copelandrachel.copeland.3@us.af.mil