# Battery Install and Replacement

Canonical: https://abierto.us/opportunities/fa940124q0035

- Solicitation number: FA940124Q0035
- Notice type: Combined synopsis and solicitation (first published as sources sought)
- Status: Closed. Deadline was September 19, 2024 at 4:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA9401 377 MSG PK (FA9401)
- NAICS: 335910 Battery Manufacturing
- Product or service code: 6140 Batteries, Rechargeable
- Set-aside: Total small business set-aside
- Place of performance: Kirtland AFB, New Mexico
- County: Bernalillo County (FIPS 35001). https://abierto.us/counties/bernalillo-county-nm-35001
- City: Kirtland AFB. https://abierto.us/cities/kirtland-afb-nm-3536300
- First posted: May 17, 2024
- Last posted: September 17, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/47f6fc3eb55c42cc88ce24a547a91650/view

## Description

The Air Force has a requirement for the purchase of 12 sodium nickel battery modules to replace the existing battery modules. In addition, one 200-amp power inverter and 27 additional electrical outlets are required for the building.

Contractor must remove and dispose of existing lead-acid batteries, provide Ethernet remote monitoring capabilities, remove and dispose of existing power inverters and purchase and install replacement power inverters, and purchase and install overhead electrical outlets located in the areas of the batteries and inverters. Critical requirement to be met is that the battery system be 48 volts and provide 5 hours of power at the 120 amp maximum load.

Batteries must meet the following requirements: • Cycling Capability: 4.500 cycles (80% DOD) • Battery energy density 100÷120Wh/kg, 150-190Wh/lt • Shelf life (> 20 years) • Temperature Immunity (-40 ÷ +60°C) • No gas emissions • No flammable materials • No fire/water flood reaction • 100% recyclable • NO pollution materials • NO gas emissions Power inverters must be one 200-amp and one 100-amp for the two required power inverters for the building. Electrical outlets are to be 115V, 60 Hertz power.

## Publications

- May 17, 2024: Sources sought, due May 28, 2024 at 2:00 PM EDT. Notice 25c79a366e3c4f0f85e78f9cd35a46b2. https://sam.gov/workspace/contract/opp/25c79a366e3c4f0f85e78f9cd35a46b2/view
- September 12, 2024: Combined synopsis and solicitation, due September 19, 2024 at 4:00 PM EDT. Notice 40d3cf95c85f43c59f16984207523ba8. https://sam.gov/workspace/contract/opp/40d3cf95c85f43c59f16984207523ba8/view
- September 17, 2024: Combined synopsis and solicitation, due September 19, 2024 at 4:00 PM EDT. Notice 47f6fc3eb55c42cc88ce24a547a91650. https://sam.gov/workspace/contract/opp/47f6fc3eb55c42cc88ce24a547a91650/view

## Points of contact

- Abigail Turner, abigail.turner.2@us.af.mil
- Rachel Copeland, rachel.copeland.3@us.af.mil

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/fa940124q0035.
