Sources sought, total small business set-aside
Demolition Services for Building 140, 7362, and 4395, Joint Base San Antonio Lackland
F2M3CC5129A002
Department of the Air Force, FA3016 502 Cons CL. Site Preparation Contractors.
Response deadline
August 1, 2025 at 1:00 PM EDT
Closed 457 days ago. Posted July 25, 2025. Scheduled to archive August 16, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
9 like it are open now in site preparation contractors
- Instrument Landing Structure (ILS)
Department of the Army, W076 Endist FT Worth
Sources soughtSmall businessNAICS 238910LouisianaW9126G27RA021Closes tomorrowNov 2 - Demolish Dormitory 2425
Department of the Air Force, FA4897 366 Cons PKP
Sources soughtNAICS 238910Mountain Home AFB, IDFA489727QSS11Closes in 2 daysNov 3 - Hickman Wildlife Water Catchment and Pipe Fence
Bureau of Land Management, New Mexico State Office
Combined synopsis and solicitationSmall businessNAICS 238910New Mexico140L1726Q0054Closes in 8 daysNov 9
Description
As published on SAM.gov.
This requirement is to complete the demolition of Building 140, 7362, and 4395 located at Joint Base San Antonio (JBSA) Lackland (LAK). This is a non-personal services requirement. The Contractor shall furnish all management, supervision, labor, tools, equipment, materials, and supplies necessary for the complete and compliant demolition of three (3) buildings located at JBSA Lackland: Building 4395, Building 7362, and Building 140 located at JBSA Lackland-Chapman Training Annex. The Contractor is responsible for all aspects of the demolition process, including, but not limited to, the following:
Surveys and Documentation: Conduct initial and post-work topographic surveys, and provide pre-demolition photographic records. All surveys and photographic records must be certified by a Registered Professional Land Surveyor.
Demolition and Removal: Demolish and remove all material from the specified buildings, including all above-ground and below-ground structures, to a depth of three (3) feet below the existing grade. This includes, but is not limited to, concrete slabs, foundations, and vaults.
Utility Disconnection: Locate, disconnect, cap, and plug all overhead and underground utilities (water, wastewater, electrical, gas, etc.) to the nearest acceptable point. The disconnection points will be determined on-site by the applicable service provider and the Project Manager (PM) during the execution of the contract.
Debris Removal and Disposal: Remove and dispose of all demolition debris from the sites in accordance with all applicable federal, state, and local regulations. The Contractor is responsible for securing all necessary permits and ensuring proper disposal methods.
Work Layout and Supervision: The Contractor shall provide all necessary work layouts and supervision to ensure the safe and efficient execution of the demolition work. If interested and capable of fulfilling this requirement, please complete the attached sources sought notice questionnaire and return to me no later than suspense date NLT 1 August 2025 12:00PM CDT. In this notice there are the following documents:
1. Sources sought notice questionnaire;
2. Draft PWS Any interested party may inquire with the below point of contact:
1st Lt Chad Olson, Contract Specialist, Email: chad.olson.4@us.af.mil
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 25, 2025
Sources sought
Due August 1, 2025 at 1:00 PM EDT. SAM.gov, notice 3cb5b8cf3cac467c8d1a3a4ca2d45f0f
Points of contact
- Chad Olsonchad.olson.4@us.af.mil2108027358