EGYN121012E Repair Outdated Electrical Switchgear Study B820-830
EGYN121012E
Department of the Air Force, FA4659 319 Cons PK. Engineering Services.
Response deadline
July 11, 2024 at 5:00 PM EDT
Closed 843 days ago. Posted June 13, 2024, first published May 21, 2024. Scheduled to archive July 26, 2024.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2024
94 like it are open now in engineering services
- High Power Microwave Engineering Services
Department of the Navy, NSWC Dahlgren
Sources soughtNAICS 541330Anywhere in the USN0017826R3004Closes todayNov 1 - FDRMC ENGINEERING SUPPORT SERVICES
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 541330Outside the USN6817126RN005Closes tomorrowNov 2 - AE Replace Elevators 539-24-102
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 541330Ohio36C25027R0008Closes tomorrowNov 2
Description
As published on SAM.gov.
Scope of Work: The Architect-Engineer (A-E) shall conduct an engineering design study, to include a Class 4 cost estimate (accuracy defined as – 20% to +30%) and provide recommendations to upgrade and/or replace the existing outdated switchgear and motor control center equipment in Mission Buildings B820 and B830 at Cavalier Space Force Station (CSFS), North Dakota.
Goal: Provide cost effective, feasible, and sustainable options that will upgrade the Tactical Support Switchgear (SWGR) and Motor Control Centers (MCC) while optimizing the p[power distributions system’s energy efficiency, reliability, resiliency and performance. The upgraded equipment, SWGE and MCC’s must retain their local and remote controls, their voltage and current protection and monitoring as well as any existing capabilities.
Additionally, the study must be conducted within the context of the defined short-term and long-term mission requirements of CSFS. Given that existing manufactured parts are no longer available to conduct routine and preventative maintenance on the switchgear and corresponding equipment, the study must explore both upgrading the existing equipment with modernized technology as well as replacing the existing equipment via reengineering. Questions are due by email NLT 27 June 2024 at 4:00PM CDT.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- TSgt Nicholas Cameronnicholas.cameron.3@us.af.mil70174752585
- Harold Andersonharold.anderson.11@us.af.mil7017475297