Solicitation, total small business set-aside
CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail
6982AF19B000019
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Other Heavy and Civil Engineering Construction.
Response deadline
October 16, 2024 at 4:30 PM EDT
Closed 748 days ago. Posted November 12, 2024, first published September 3, 2024. Scheduled to archive November 13, 2024.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed in 2024
132 like it are open now in other heavy and civil engineering construction
- USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Department of the Army, W075 Endist Sacramento
SolicitationNAICS 237990Sacramento, CAW9123826BA013Closes in 14 daysNov 17 - FWS - Pixley NWR Water Recirculation Design-Build
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 237990California140FF027R0003Closes in 27 daysNov 30 - Belle Fountain Ditch Cleanout Phase 2
Department of the Army, W07V Endist Memphis
SolicitationSDVOSBNAICS 237990MissouriW912EQ26BA002Closes todayNov 3
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
TOTAL SMALL BUSINESS SET-ASIDE PROJECT DETAILS: CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail This project will consist of replacement and reconstruction of the approximately 2,871-foot-long, ABA accessible, raised timber boardwalk trail (6-feet wide) that was completely destroyed during flash flooding on August 5, 2022. The project also includes removal of remaining portions of damaged and displaced boardwalk from sensitive environmental areas including wilderness, reconstructing the trailhead parking lot, and reconstructing a 400-foot section of roadway with special rock embankment.
The boardwalk alignment will be placed in a modified alignment to follow the new post-flashflood stream course (August 2022 and Tropical Storm Hillary August 2023 events). All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints including paleontological monitoring, limitations on large equipment in the boardwalk area, and matting that will affect the construction schedule and type of operations.
Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude within National Parks, National Forests, or similar environments is required. Principle work items include:
2,100 square yards of thermally modified timber structural decking, 58 thousand board feet measure (MFBM) of structural timber, treated, 5,800 linear feet of timber, 6-inch curbing, 700 linear feet of timber bridge railing, 650 each helical piles (2-7/8”, 5-1/2” & 7” diameter), 1,300 square yards of removal of timber boardwalk debris (by helicopter) 2,000 cubic yards of embankment construction, 400 cubic yards of special rock embankment, 680 square yards of concrete sidewalk and pavement, 400 linear feet of concrete curb, and 1 each vault toilet (double occupancy unit) The anticipated advertisement date for the project is September 2024 with construction anticipated from November 2024 to June 2025. The estimated price range of the project work is between $5,000,000 and $10,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 3, 2024
Solicitation, originally presolicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice 06ee89fcb3ff4431af34208d76f00297
September 11, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice 1d6a97d5271d41dc8f1e2ae0f9648711
September 11, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice 7ae3f3530128483fa5aab6124991529b
September 17, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice dd04c03250da4dc8b468baee444e1b9b
September 24, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice 3ebd8bca3a3a47c9b4b07d9487938f5c
September 24, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice c51affcd742341d3b3acb50251ab221a
September 25, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice 4256266822c544459b065f6d7dda3818
September 27, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice 0a3599e1716c423bb5c27a9b7ffefe40
September 30, 2024
Solicitation
Due October 3, 2024 at 4:00 PM EDT. SAM.gov, notice 206b909e37ef4dfa97f31e53d0417ae6
October 1, 2024
Solicitation
Due October 10, 2024 at 4:00 PM EDT. SAM.gov, notice 67df62c0c6f94b84b53e6658d2053140
October 2, 2024
Solicitation
Due October 10, 2024 at 4:00 PM EDT. SAM.gov, notice d9b05ff212eb4f35afbee2425dcb3494
October 8, 2024
Solicitation
Due October 10, 2024 at 4:00 PM EDT. SAM.gov, notice 6fd3843704df438eb01b0b825c0730b5
October 9, 2024
Solicitation
Due October 16, 2024 at 4:30 PM EDT. SAM.gov, notice 07f636d6c70046f7a9103699c1d3cf17
October 14, 2024
Solicitation
Due October 16, 2024 at 4:30 PM EDT. SAM.gov, notice 86796f70922948a4b31710c6ab5dc01a
October 15, 2024
Solicitation
Due October 16, 2024 at 4:30 PM EDT. SAM.gov, notice 223773caf233430c9c89dfa98caac976
October 16, 2024
Solicitation
Due October 16, 2024 at 4:30 PM EDT. SAM.gov, notice e34f98dde7d94e9d8c5edba4405a0c3d
November 12, 2024
Solicitation
Due October 16, 2024 at 4:30 PM EDT. SAM.gov, notice 5e700422043449b8a50d5ff62af6a275
November 12, 2024
Solicitation
Due October 16, 2024 at 4:30 PM EDT. SAM.gov, notice b90a4f0b2e8c49108faa24860977636e
Points of contact
- Kelly Palmercflcontracts@dot.gov