Presolicitation, total small business set-aside
Repair Arctic Utilidor D (FTQW 20-0502) & Utilidor H (FTQW 23-1001)
20-0502_23-1001
Department of the Air Force, FA5004 354 Cons PK. Engineering Services.
Response deadline
July 22, 2025 at 4:00 PM EDT
Closed 467 days ago. Posted July 14, 2025, first published June 12, 2025. Scheduled to archive August 23, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
94 like it are open now in engineering services
- High Power Microwave Engineering Services
Department of the Navy, NSWC Dahlgren
Sources soughtNAICS 541330Anywhere in the USN0017826R3004Closes todayNov 1 - FDRMC ENGINEERING SUPPORT SERVICES
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 541330Outside the USN6817126RN005Closes tomorrowNov 2 - AE Replace Elevators 539-24-102
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 541330Ohio36C25027R0008Closes tomorrowNov 2
Description
As published on SAM.gov.
The 354th Eielson Contracting Quadron is seeking qualification packages for A&E services for the project below:
The Arctic Utilidor D & Arctic Utilidor H were constructed and installed in the 1950's and have exceeded their useful life. Many of the pipes have patches and splices to keep them operational and pipe supports have rusted. In addition, it is suspected there is significant infiltration and inflow (I&I) entering the system through the utilidor infrastructure due to aging waterproofing and concrete joint sealing systems.
This is causing the wastewater treatment plant to encroach on its permitted treatment volume during spring break up. Based on previous utilidor projects, it is suspected there will be asbestos-containing material (ACM), but a hazmat survey shall be conducted for both utilities to determine what hazardous materials are present. Both utilidors fall within contaminated soils areas.
Utilidor D will need the Design of the full-length replacement of all utility systems, this includes sewer, water, steam, and condensate utility piping in the main utilidor. All lateral lines servicing the Butler Buildings 3435-3442 and Building 3426 shall also be replaced. The existing service to Building 3425 shall remain in place and be connected to the new utility lines.
Utilidor H will also need the full-length design of the replacement of all utility systems, all lateral lines servicing the buildings shall be replaced. Also design three additional manholes for Utilidor H to provide a maximum of 300-feet spacing between drip legs and traps. The contract schedule set forth in the statement of work requires a delivery of 100% design documents in 216 calendar days.
If this is something your firm is interested in and can accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF330 (Architect-Engineer Qualification-Standard Form 330), and a PPQ (Past Performance Questionnaire).
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 12, 2025
Presolicitation
Due July 14, 2025 at 4:00 PM EDT. SAM.gov, notice 69a6ecaa9dd047f18d59ef9e6e102b99
July 1, 2025
Presolicitation
Due July 14, 2025 at 4:00 PM EDT. SAM.gov, notice 75c385a43b9a4f729f34810fc2935a39
July 14, 2025
Presolicitation
Due July 22, 2025 at 4:00 PM EDT. SAM.gov, notice 0aaaebb63d2e450083da7b0eeddf1179
Points of contact
- 354 CONS PKA Designs354CONS.PKA.Designs@us.af.mil
- Ryan Smithryan.smith.186@us.af.mil9073777348