# Repair Arctic Utilidor D (FTQW 20-0502) & Utilidor H (FTQW 23-1001)

Canonical: https://abierto.us/opportunities/200502231001

- Solicitation number: 20-0502_23-1001
- Notice type: Presolicitation
- Status: Closed. Deadline was July 22, 2025 at 4:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA5004 354 Cons PK (FA5004)
- NAICS: 541330 Engineering Services
- Product or service code: C219 Other Architect and Engineering Services
- Set-aside: Total small business set-aside
- Place of performance: Eielson AFB, Alaska
- County: Fairbanks North Star Borough (FIPS 02090). https://abierto.us/counties/fairbanks-north-star-borough-ak-02090
- City: Eielson AFB. https://abierto.us/cities/eielson-afb-ak-0221370
- First posted: June 12, 2025
- Last posted: July 14, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/0aaaebb63d2e450083da7b0eeddf1179/view

## Description

The 354th Eielson Contracting Quadron is seeking qualification packages for A&E services for the project below:

The Arctic Utilidor D & Arctic Utilidor H were constructed and installed in the 1950's and have exceeded their useful life. Many of the pipes have patches and splices to keep them operational and pipe supports have rusted. In addition, it is suspected there is significant infiltration and inflow (I&I) entering the system through the utilidor infrastructure due to aging waterproofing and concrete joint sealing systems.

This is causing the wastewater treatment plant to encroach on its permitted treatment volume during spring break up. Based on previous utilidor projects, it is suspected there will be asbestos-containing material (ACM), but a hazmat survey shall be conducted for both utilities to determine what hazardous materials are present. Both utilidors fall within contaminated soils areas.

Utilidor D will need the Design of the full-length replacement of all utility systems, this includes sewer, water, steam, and condensate utility piping in the main utilidor. All lateral lines servicing the Butler Buildings 3435-3442 and Building 3426 shall also be replaced. The existing service to Building 3425 shall remain in place and be connected to the new utility lines.

Utilidor H will also need the full-length design of the replacement of all utility systems, all lateral lines servicing the buildings shall be replaced. Also design three additional manholes for Utilidor H to provide a maximum of 300-feet spacing between drip legs and traps. The contract schedule set forth in the statement of work requires a delivery of 100% design documents in 216 calendar days.

If this is something your firm is interested in and can accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF330 (Architect-Engineer Qualification-Standard Form 330), and a PPQ (Past Performance Questionnaire).

## Publications

- June 12, 2025: Presolicitation, due July 14, 2025 at 4:00 PM EDT. Notice 69a6ecaa9dd047f18d59ef9e6e102b99. https://sam.gov/workspace/contract/opp/69a6ecaa9dd047f18d59ef9e6e102b99/view
- July 1, 2025: Presolicitation, due July 14, 2025 at 4:00 PM EDT. Notice 75c385a43b9a4f729f34810fc2935a39. https://sam.gov/workspace/contract/opp/75c385a43b9a4f729f34810fc2935a39/view
- July 14, 2025: Presolicitation, due July 22, 2025 at 4:00 PM EDT. Notice 0aaaebb63d2e450083da7b0eeddf1179. https://sam.gov/workspace/contract/opp/0aaaebb63d2e450083da7b0eeddf1179/view

## Points of contact

- 354 CONS PKA Designs, 354CONS.PKA.Designs@us.af.mil
- Ryan Smith, ryan.smith.186@us.af.mil, 9073777348

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/200502231001.
