Special notice
Q&A for Solicitation # 19SA7024Q0012
19SA7024Q0012-QA
Department of State, U.S. Embassy Riyadh. Other Concrete Product Manufacturing.
Response deadline
February 29, 2024 at 9:00 AM EST
Closed 977 days ago. Posted February 25, 2024. Scheduled to archive March 15, 2024.
Get the next one like this from Department of State by email, the day it is posted.Find my opportunities
This one closed in 2024
1 like it is open now in other concrete product manufacturing
- Picnic Tables & Bear Lockers with Install
Forest Service, Usda-Fs, Csa Intermountain 8
Combined synopsis and solicitationSmall businessNAICS 327390Colorado1240LT27Q0017Closes in 22 daysNov 24
Description
As published on SAM.gov.
QUESTIONS AND ANSWERS (Q&A) SOLICITATION # 19SA7024Q0012 (Replace the natural grass area with outdoor artificial /astro-turf grass and replace the fixed security fence)
Q1: Kindly share revised scope of work with all details to participate in bid effectively.
A1: The revised statement of work (SOW) has been revised.
Q2: Meanwhile have a query for earthwork layers thickness details (in case non suitable material and exchange the material for concrete ) after removing the green grass and setting new concrete structures.
A2: The concert floor is no longer needed according to the updated scope of work. The project now involves replacing the natural grass with outdoor artificial or astro-turf grass and installing a new security fence.
Q3: We are highly interested to bid on the solicitation# 19SA7024Q0012 project. Can a U.S. firm with local Saudi contractor partner bid on this project. Please confirm.
A3: Yes, with a local sub-contractor.
Q4: Footpath area before the fence also needs to be covered for concrete replacement. May we know the additional area?
A4: The concert floor is no longer needed according to the updated statement of work (SOW). The project now involves replacing the natural grass with outdoor artificial or astro-turf grass and installing a new security fence.
Q5: Can we have an Equipment (like bobcat) and Material Storage Allocated Area?
A5: Yes, small size (mini skid steer) on wheel or rubber chain.
Q6: Can we have a place for dumpster?
A6: Yes.
Q7: Could you please provide the compacted material/bullets specification?
A7: According to the updated SOW, the project now involves replacing the natural grass with outdoor artificial or astro-turf grass and installing a new security fence.
Q8: As discussed during site visit could you please provide us drainage plan?
A8: Details have been added to the updated SOW.
Q9: Is the DBA Insurance mandatory? If yes, need more time to acquire (30 to 40 days).
A9: Yes, it will take more time. Obtain a quote from the service provider and add the cost to the proposal.
Q10: Regarding the removal of trees, how deep are the roots to be removed?
A10: An 8-inch bio-chemical treatment is recommended for killing the roots.
Q11: Aluminum is recommended for fence. Can contractor use the steel members to fabricate the fence?
A11: No, only materials which are highly resistant to corrosion can be used (such as aluminum or stainless steel).
Q12: The irrigation system as built will be required to remove the piping to make sure it will not disturb the remaining system only sprinklers or complete U/G pipes as well?
A12: The contractor must remove any sprinklers or piping that may disrupt floor preparation and block off the 1-1/2” irrigation lines from the valve box that supply the garden.
Q13: Is irrigation system re-programming required by the contractor or embassy will take care of programming?
A13: This is not applicable to our project requirements.
Q14: In one statement it mentioned the slab foundation’s concrete in 300 psi, and in second statement is mentioned all concrete is 15 psi, which one is accurate please clarify?
A14: The concert floor is no longer needed according to the updated SOW. The project now involves replacing the natural grass with outdoor artificial or astro-turf grass and installing a new security fence.
Q15: The project duration can be extended from 30 days to more.
A15: This is not possible.
Q16: From which points the feeder cable will be coming to new panel board, and how much are linear meters.
A16: From the mechanical room - next building with total length of cable around 50 meters.
Q17: Will the project duration is 30 working days or 30 calendar days? Please Clarify.
A17: The duration is thirty (30) calendar days.
Q18: According to the site visit, it was requested to supply and fill with aggregate and coarse sand with a 40 cm depth under the concrete slab. Please confirm.
A18: The concert floor is no longer needed according to the updated SOW.
Q19: According to the site visit, it was requested to supply and lay reinforced cement concrete ground beams with a depth of 60 cm under the fence to install the columns. Please confirm.
A19: If the proposed design requires it, it can proceed.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 25, 2024
Special notice, originally solicitation
Due February 29, 2024 at 9:00 AM EST. SAM.gov, notice 09f2a053f17c4a138bdef004d1016152
Points of contact
- ATTN: Contracting OfficerRiyadhcontracting@state.gov