Skip to content
Abierto

Solicitation, first published as presolicitation

New Well Drilling and Pump Installation

19MR6025Q0013

Department of State, U.S. Embassy Nouakchott. Site Preparation Contractors.

Response deadline

August 8, 2025 at 2:00 PM EDT

Closed 405 days ago. Posted August 4, 2025, first published June 18, 2025. Scheduled to archive August 8, 2025.

Description

As published on SAM.gov.

The U.S. Embassy, Nouakchott Mauritania, intends to issue a Firm Fixed-Price Construction Type Contract in the fourth quarter of Fiscal Year 2025 The offeror shall provide complete construction services, contract coordination, and supervision, including but not limited to the management and construction necessary to meet the requirements of this contract within the established timeframe. The requirement includes the following but is not limited to:

Engineering Studies and Design: Comprehensive engineering studies will be conducted to determine the optimal location and design for the new well.

This includes geological surveys, hydrological assessments, and detailed design plans to ensure the well meets all technical and operational requirements. • Drilling a New Well: The well will be drilled to a minimum depth of 70 meters with a diameter of 30 centimeters, using unplasticized polyvinyl chloride casing (ASTM F480 and NSF 14, Schedule 40) or as approved by the Contracting Officer's Representative. • Well Pump Installation: The project includes the purchase and installation of a well pump capable of achieving an optimum pumping rate of 3 to 6 cubic meters per hour. • Integration with Existing System: The new well will be connected to the existing water distribution pipe, ensuring seamless integration with the current infrastructure. • Construction of Pump House: A pump house will be constructed to house the well pump and associated equipment, providing protection and facilitating maintenance. •Automatic Operation with Bypass Feature: The system will be designed to operate automatically, with a bypass feature to ensure continuous water supply in case of any operational issues. •Water Quality Testing: Comprehensive water quality testing will be conducted to ensure that the well water meets all health and safety standards for potable water.

Regular monitoring and testing will be performed throughout the project to ensure compliance with quality standards. The complete Scope of Work and specifications are attached in the uploaded solicitation.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 18, 2025

    Presolicitation

    Due July 5, 2025 at 2:00 PM EDT. SAM.gov, notice 2bf1d8b9e1f344dfb6ca1799140433f8

  2. July 9, 2025

    Solicitation, originally presolicitation

    Due August 8, 2025 at 2:00 PM EDT. SAM.gov, notice fd4abb7414bf4b8f9900c77a11077b6d

  3. August 4, 2025

    Solicitation

    Due August 8, 2025 at 2:00 PM EDT. SAM.gov, notice 8fda9bc2988a4ecba11e2a98abef8432

Points of contact