Solicitation, total small business set-aside
FCI Jesup - Water main tie-into water softener
15BFA025Q00000281
Federal Prison System / Bureau of Prisons, Fao. Water and Sewer Line and Related Structures Construction.
Response deadline
November 25, 2025 at 4:00 PM EST
Closed 347 days ago. Posted November 7, 2025, first published October 14, 2025. Scheduled to archive December 10, 2025.
Get the next one like this from Federal Prison System / Bureau of Prisons by email, the day it is posted.Find my opportunities
This one closed in 2025
28 like it are open now in water and sewer line and related structures construction
- Repair of Waterfront Utility Services Transmitted via a Utilidor Tunnel at NSB Kings Bay, GA
Department of the Navy, Navfacsyscom Southeast
Sources soughtNAICS 237110Kings Bay Base, GAN6945027RM610Closes in 2 daysNov 9 - Design-Build Repair Storm Sewer Lines at U.S. Coast Guard Base San Juan, Puerto Rico Project Number: PN 15852459
US Coast Guard, Ceu Miami
PresolicitationSDVOSBNAICS 237110San Juan, PRDB-PNUM15852459Closes in 2 daysNov 9 - LB Lateral Water Line and Facilities Replacement for Wastewater System
Departmental Offices, Reclamation Contracting Activity
Sources soughtNAICS 237110California140RR027R0014Closes in 5 daysNov 12
All 28 open in water and sewer line and related structures construction
Description
As published on SAM.gov.
The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW and drawings for further details. All work must comply with local, state, and federal regulations. This is a TOTAL SMALL BUSINESS SET ASIDE. Evaluation factors; Lowest Price Technically Acceptable (LPTA) and past performance. A Pre-Bid site visist will take place at FCI Jesup on Wednesday, October 29, 2025, at 9:00 am EST.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Drawing.pdf870 KB, October 14, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 14, 2025
Solicitation, originally sources sought
Due November 14, 2025 at 6:00 PM EST. SAM.gov, notice 70d6de1697824421b627ad821df24b4b
3 revisions on SAM
- November 7, 2025: publish, solicitation
- October 14, 2025: publish, solicitation
- July 25, 2025: publish, sources sought
November 7, 2025
Solicitation
Due November 25, 2025 at 4:00 PM EST. SAM.gov, notice 44cf48ab36b84769a609bdbaea80f039
3 revisions on SAM
- November 7, 2025: publish, solicitation
- October 14, 2025: publish, solicitation
- July 25, 2025: publish, sources sought
Points of contact
- Steven Dennisonsdennison@bop.gov7197845744