Skip to content
  • 8,082 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

FCI Jesup - Water main tie-into water softener

15B30725PR000102

Federal Prison System / Bureau of Prisons, Fao. Water and Sewer Line and Related Structures Construction.

Response deadline

August 4, 2025 at 6:00 PM EDT

Closed 461 days ago. Posted July 25, 2025. Scheduled to archive September 30, 2025.

Get the next one like this from Federal Prison System / Bureau of Prisons by email, the day it is posted.Find my opportunities

This one closed in 2025

28 like it are open now in water and sewer line and related structures construction

All 28 open in water and sewer line and related structures construction

Description

As published on SAM.gov.

The Federal Bureau of Prisons is conducting market research in accordance with the Federal Acquisition Regulation, Part 10. A single solicitation will be issued for the Water main Tie-In to the existing centralized water softener system. The Federal Bureau of Prisons (FBOP), FCI Jesup, is a federal correctional facility located at 2600 Highway 301 South, Jesup, GA 31599. The FBOP intends to award to a responsible entity for the provision of all labor, materials, and equipment necessary for tapping into the existing 12" Ductile Iron Water Main, reducing it to 6" pipe, to supply water to the new water softener system. Work includes excavating around an existing check valve vault to expose the 12-inch ductile iron water main, installing 12-inch valve onto the upstream side of the check valve, installing tie-ins for a 6-inch supply and a return on the 12-inch water main underground, penetrating through the metal building wall, and install a 6-inch line to the existing water softener system. See SOW for drawings for further details.  All work must comply with local, state, and federal regulations. Drawings will be provided to show the layout of the work area.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 25, 2025

    Sources sought

    Due August 4, 2025 at 6:00 PM EDT. SAM.gov, notice 398bdb510473418ba6ea84e68c2449ba

    3 revisions on SAM
    • October 14, 2025: publish, solicitation
    • July 25, 2025: publish, sources sought
    • August 13, 2025: publish, presolicitation

Points of contact