Sources sought, first published as special notice
YOSE 215363 Rehabilitate Tuolumne Meadows Wastewater Treatment Plant
140P2025R0105
National Park Service, DSC Contracting Services Division. Other Heavy and Civil Engineering Construction.
Response deadline
August 4, 2025 at 4:00 PM EDT
Closed 455 days ago. Posted July 28, 2025, first published July 24, 2025. Scheduled to archive August 19, 2025.
Get the next one like this from National Park Service by email, the day it is posted.Find my opportunities
This one closed in 2025
132 like it are open now in other heavy and civil engineering construction
- USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Department of the Army, W075 Endist Sacramento
SolicitationNAICS 237990Sacramento, CAW9123826BA013Closes tomorrowNov 3 - FWS - Pixley NWR Water Recirculation Design-Build
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 237990California140FF027R0003Closes in 28 daysNov 30 - GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes todayNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
YOSE 215363 Rehabilitate Tuolumne Meadows Wastewater Treatment Plant. Please view the attachment for complete details of the Sources Sought Notice.
Amendment 01 - Add Attachment 1 - Questionnaire This project will replace an extended aeration WWTP and associated infrastructure, that is more than 50 years old. The infrastructure includes two disposal ponds, a force main that connects the WWTP to the disposal ponds, and effluent spray field, and a recreational vehicle dump station.
The existing plant will be demolished, one pond will be replaced with an enclosed holding tank, the other pond will be demolished, the force main will be replaced, and a recreational vehicle dump station replaced. The existing treated effluent disposal spray field equipment will be replaced with new lower maintenance spray equipment. The new treatment plant will provide modern primary, secondary, and tertiary treatment components and solids handling capability. The wastewater treatment plant operates from May to October with an average flow of 60,000 gallons per day.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 24, 2025
Special notice
Due August 4, 2025 at 4:00 PM EDT. SAM.gov, notice 28b35d6362d14107a73e7a2c6f39c015
July 24, 2025
Special notice
Due July 24, 2025 at 5:30 PM EDT. SAM.gov, notice b3e4a1820777476e82574a9f27d71075
July 24, 2025
Sources sought, originally special notice
Due August 4, 2025 at 4:00 PM EDT. SAM.gov, notice ec97be2c9ec7447790f72df62bc58ee0
July 28, 2025
Sources sought
Due August 4, 2025 at 4:00 PM EDT. SAM.gov, notice 185c1e1240c04546b13d90f0c1ad9257
Points of contact
- Bowers, Justinjustin_bowers@nps.gov0000000000