Skip to content
Abierto

Sources sought

GOGA 222626 Rehabilitate Torpedo Wharf Phase I

140P2024R0162

National Park Service, DSC Contracting Services Division. Other Heavy and Civil Engineering Construction.

Response deadline

July 16, 2024 at 2:00 PM EDT

Closed 793 days ago. Posted July 2, 2024. Scheduled to archive July 23, 2024.

Description

As published on SAM.gov.

GOGA 222626 Rehabilitate Torpedo Wharf Phase I Golden Gate National Recreation Area, San Fransico, California.

This project is Phase I of a larger project that will rehabilitate the deteriorated superstructure (piles, pile caps and structural deck) and surface pavement and includes rehabilitating the existing fendering and bullrails; adding new safety railings and rescue ladders; and installing reinforcement and protective coating to the under deck of the trestle/approach/wharf for Torpedo Wharf, located at Crissy Field, Golden Gate National Recreation Area. The structure is of an historic nature. ifornia.

The work of Phase I (this project) includes concrete underdeck rehabilitation to the deck and pile cabs between the shore and eighth abutment; removal of existing asphalt surface for the entire wharf; rehabilitation of the concrete top deck and curb for the entire wharf; replacement of the approach trestle construction joints; replacement of the wharf bullrail; installation of guardrailing and ladders; resurfacing of the deck of the entire wharf; and site restoration as necessary.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 2, 2024

    Sources sought

    Due July 16, 2024 at 2:00 PM EDT. SAM.gov, notice a79f29ed0d2346909c3851b16c9ebbd1

Points of contact