Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Romero Camuesa & Arroyo Seco Retaining Wall Replacements

12970224R0015

Forest Service, USDA Forest Service-Spoc SW. Other Heavy and Civil Engineering Construction.

Response deadline

May 1, 2024 at 6:00 PM EDT

Closed 869 days ago. Posted April 25, 2024, first published March 27, 2024. Scheduled to archive May 16, 2024.

Description

As published on SAM.gov.

This project consists of the removal and replacement of failed retaining walls at one site on National Forest System Road 19S09 (Arroyo Seco) and one site on National Forest System Road 15N15 (Romero Camuesa), both on the Los Padres National Forest. The site on NFSR 19S09 is located approximately 27 miles (36 minutes) west of the Monterey District Ranger Station in King City, California, near the Arroyo Seco Campground.

The site on NFSR 15N15 is located approximately 18 miles (50 minutes) north of Montecito, California, one mile west of the Divide Peak OHV staging area.

The required work includes the removal of a failed block wall on 19S09 and a failed crib wall on 15N15, structural excavation, the installation of Class 4 rip-rap, including rockfall netting, the installation of a combined 975 square feet of new mechanically stabilized earth wall, including geocomposite sheet drainage systems, roadway reconditioning, including an aggregate base surface course, and the installation of carsonite delineators.

The contractor will also be required to survey and stake the new retaining walls, test imported materials in accordance with specifications, and institute soil erosion and pollution control measures in accordance with plans, specifications, and the contractor-submitted Soil Erosion Control Plan. Magnitude of construction: Between $500,000 and $1,000,000.

A site visit will be held April 15, 2024 through April 16, 2024 There will be one site visit which includes both days Contractors will meet at 1000L at the following locations:

April 15th: San Marcos fire station 5398 E Camino Cielo, Santa Barbara, CA 93105 April 16th: Arroyo Seco campground 47600 Arroyo Seco Rd, Greenfield, CA 93927 RFIs to be submitted to george.staggs@usda.gov by 1700 CDT April 24, 2024

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 27, 2024

    Combined synopsis and solicitation

    Due April 24, 2024 at 6:00 PM EDT. SAM.gov, notice 802de6856c7e43db9f97b8d6082197a7

  2. March 27, 2024

    Combined synopsis and solicitation

    Due April 24, 2024 at 6:00 PM EDT. SAM.gov, notice aeda88f27ab648f687f6be27c6f6da16

  3. March 28, 2024

    Combined synopsis and solicitation

    Due April 24, 2024 at 6:00 PM EDT. SAM.gov, notice 0a4ea16385ab46fcb54106b2cce48801

  4. March 28, 2024

    Combined synopsis and solicitation

    Due April 24, 2024 at 6:00 PM EDT. SAM.gov, notice 67230bc03722486783c727c7c6186cf3

  5. April 3, 2024

    Combined synopsis and solicitation

    Due April 24, 2024 at 6:00 PM EDT. SAM.gov, notice 56fee52964a54770b84ef5054205d40b

  6. April 3, 2024

    Combined synopsis and solicitation

    Due April 24, 2024 at 6:00 PM EDT. SAM.gov, notice 8264b9322c994d759f5aa6ec81d4f1de

  7. April 22, 2024

    Combined synopsis and solicitation

    Due April 24, 2024 at 6:00 PM EDT. SAM.gov, notice 6fe35771bcfb47bd9f514ecb24693c2d

  8. April 24, 2024

    Combined synopsis and solicitation

    Due May 1, 2024 at 6:00 PM EDT. SAM.gov, notice 57b1d24a40584a6b80a718c8c3d255ae

  9. April 24, 2024

    Combined synopsis and solicitation

    Due May 1, 2024 at 6:00 PM EDT. SAM.gov, notice 8d3654516bdd47518d5a7a4e3b40053a

  10. April 25, 2024

    Combined synopsis and solicitation

    Due May 1, 2024 at 6:00 PM EDT. SAM.gov, notice 539f3e585cb549ec939a23a771923461

Points of contact