Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Awarded NKRD Maintenance Repairs

127EAX24Q0028

Forest Service, Usda-Fs, Csa Southwest 5. Highway, Street, and Bridge Construction.

Response deadline

August 12, 2024 at 2:00 PM EDT

Closed 767 days ago. Posted August 22, 2024, first published June 17, 2024. Scheduled to archive August 27, 2024.

Description

As published on SAM.gov.

Awarded-- Rusty Bucket Construction See attached Award notification for the particulars 7/15/2024 Amended Solicitation submittal date:and added questions and answers Submittal date extended from 7/12/2024 to 7/29/2024 at 12:00 pm 7/15/20246/28/2023--Added specifications_summary of work attachment The Contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the replacment of two (2) underground water system control valves, one (1) 4” backflow preventer assembly, two (2) electric heaters, two (2) roof penetration boots, one (1) propane shut-off valve, one (1) electric incinerating toilet, and one (1) ¾” PEX water line (approximatly 3” in length).

The contractor is also responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the following new improvements.

One (1) French Drain (21’L x 2’W x 2.5’D) and associated underground 4” drainage culvert (approximatly 65 L.F.), one (1) 120v, 15 amp circuit with quadplex outlet installed on existing steel lookout tower (intended outlet location is approximatly 100’ above ground level) The Contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the repair/replacement of the existing 4” sanitary sewer at Big Springs Work Center (Bid Items #9 and #9A).

The intent of this contract is to either clear the blocked sewer line using non-destrictive methods or to completely replace the blocked section of sewer (damaged sections of sewer line shall not be left in-place without adaquate repair to fully restore integrity of sewer pipe). Contractor will be responsible for investigating the nature of the blockage, and determining the appropriate course of action to bring the blocked sewer into full working order.

If the sewer pipe is found to be physically compromised, then replacment of the compromised section will be requiered. Only one of the two bid items, #9 and #9A will be paid. Contractor is responsible for coordinating with COR during the process to elect which bid item will be necessary for successful repair of the sanitary sewer

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 17, 2024

    Combined synopsis and solicitation

    NKRD Maintenance Repairs

    Due July 12, 2024 at 2:00 PM EDT. SAM.gov, notice afc287581e7d4674ad3f62beea1478be

  2. June 28, 2024

    Combined synopsis and solicitation

    NKRD Maintenance Repairs

    Due July 12, 2024 at 2:00 PM EDT. SAM.gov, notice 2eff9794f3f94198a45b20b98822f8a5

  3. July 15, 2024

    Combined synopsis and solicitation

    NKRD Maintenance Repairs

    Due July 29, 2024 at 2:00 PM EDT. SAM.gov, notice 8060e5ef101c49f7ae82afd436bffe8d

  4. July 15, 2024

    Combined synopsis and solicitation

    NKRD Maintenance Repairs

    Due July 29, 2024 at 2:00 PM EDT. SAM.gov, notice 9615cca380614e42a0476c970aff9caf

  5. August 22, 2024

    Combined synopsis and solicitation

    Due August 12, 2024 at 2:00 PM EDT. SAM.gov, notice 2ff4b05813f546aa90b8d5493aa46279

Points of contact

  • Reforestation Tree Shelters
    Combined synopsis and solicitationSmall businessNAICS 113210Luna, NM127EAv26Q0094
    Closes todaySep 18
  • Horse Panels
    Combined synopsis and solicitationSmall businessNAICS 332323Arizona127EAV26Q0119
    Closes todaySep 18