Presolicitation, total small business set-aside
AZ BL COLO 7528(1) Burro Creek Road
6982AF27B000002
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Offers due
September 30, 2026 at 4:00 PM EDT
14 days from now. Posted September 15, 2026.
Description
As published on SAM.gov.
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Small Business Set-Aside
PROJECT NUMBER: AZ FLAP PIM FR510(1)
PROJECT NAME: Burro Creek Road
PROJECT DESCRIPTION:
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
SCOPE OF THE WORK:
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
- Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
- Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
- Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
- Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award-January - 2027
Construction – January 2027 through October 2027
ESTIMATED COST RANGE:
Between $2,000,000 and $5,000,000
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 15, 2026
Presolicitation, originally sources sought
Due September 30, 2026 at 4:00 PM EDT. SAM.gov, notice 04633d3deaa74bd9856924934d466a6d
2 revisions on SAM
- September 15, 2026: publish, presolicitation
- May 19, 2026: publish, sources sought
Points of contact
- Eric Grosskreuzcflcontracts@dot.gov
- Kelly PalmerCFLcontracts@dot.gov
Also open from this buyer
- TX FW LGA 10(5) Steve Thompson Wildlife DrivePresolicitationSmall businessNAICS 237310Texas6982AF26B000014Closes tomorrowSep 17
- NV BL SONV 500(3) Red Rock TrailSources soughtNAICS 237310Nevada6982AF26SS00007Closes in 7 daysSep 23
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadPresolicitationNAICS 237310Utah6982AF27B000005Closes in 7 daysSep 23
- ND NP THRO 204(1) Buck Hill RoadPresolicitationNAICS 237310North Dakota6982AF25B000004Closes in 14 daysSep 30