Solicitation, total small business set-aside, first published as presolicitation
AZ BL COLO 7528(1) Burro Creek Road
6982AF27B000002
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Offers due
November 17, 2026 at 4:00 PM EST
17 days from now. Posted October 27, 2026, first published September 15, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- TX FW LGA 10(5) Steve Thompson Wildlife DriveSolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 3 daysNov 3
- ND NP THRO 204(1) Buck Hill RoadSolicitationNAICS 237310Medora, ND6982AF25B000004Closes in 3 daysNov 3
- WY BR WYAO US20(1) US 20 and Hayden Arch Bridge RepairsSources soughtNAICS 237310Cody, WY6982AF27SS00001Closes in 4 daysNov 4
Similar, open now
- FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes in 2 daysNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 3 daysNov 3 - TX FW LGA 10(5) Steve Thompson Wildlife Drive
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 3 daysNov 3
Description
As published on SAM.gov.
PROJECT DESCRIPTION:
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
SCOPE OF THE WORK:
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
- Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
- Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
- Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
- Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award-January - 2027
Construction – January 2027 through October 2027
ESTIMATED COST RANGE:
Between $2,000,000 and $5,000,000
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 11.12.4 Design Physical Data and Reports.zip70 KB, October 15, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 15, 2026
Presolicitation, originally sources sought
Due September 30, 2026 at 4:00 PM EDT. SAM.gov, notice 04633d3deaa74bd9856924934d466a6d
2 revisions on SAM
- September 15, 2026: publish, presolicitation
- May 19, 2026: publish, sources sought
October 15, 2026
Solicitation
Due November 17, 2026 at 4:00 PM EST. SAM.gov, notice 07013cf162754b15ba4b0f1b7d02d803
3 revisions on SAM
- October 15, 2026: publish, solicitation
- October 15, 2026: publish, solicitation
- September 15, 2026: publish, presolicitation
October 15, 2026
Solicitation, originally presolicitation
Due November 17, 2026 at 4:00 PM EST. SAM.gov, notice f94840fdd5c54b6aa5917c0dd1e742e1
3 revisions on SAM
- October 15, 2026: publish, solicitation
- October 15, 2026: publish, solicitation
- September 15, 2026: publish, presolicitation
October 27, 2026
Solicitation
Due November 17, 2026 at 4:00 PM EST. SAM.gov, notice d6f6fdca13254c15aa5780ecb43eee20
4 revisions on SAM
- October 27, 2026: publish, solicitation
- October 15, 2026: publish, solicitation
- October 15, 2026: publish, solicitation
- September 15, 2026: publish, presolicitation
Points of contact
- Eric Grosskreuzcflcontracts@dot.gov
- Kelly PalmerCFLcontracts@dot.gov