Skip to content
Abierto

Presolicitation, total small business set-aside

AZ BL COLO 7528(1) Burro Creek Road

6982AF27B000002

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Offers due

September 30, 2026 at 4:00 PM EDT

14 days from now. Posted September 15, 2026.

Description

As published on SAM.gov.

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

Small Business Set-Aside

PROJECT NUMBER: AZ FLAP PIM FR510(1)

PROJECT NAME: Burro Creek Road

PROJECT DESCRIPTION: 

Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet.  The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.

SCOPE OF THE WORK: 

The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety.  The scope of work for this project includes the following major construction activities and items:

  • Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
  • Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall.  Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
  • Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
  • Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.

The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.

PRINCIPAL WORK ITEMS:

Roadway Aggregate: 1,600 TONS

Ditch Reconditioning: 2,000 LNFT

Full Depth Reclamation: 1.3 MILE

Asphalt Concrete Pavement: 3,600 TON

18-Inch Pipe Culvert: 100 LNFT

24-Inch Pipe Culvert: 175 LNFT

Boulder: 100 EACH

ANTICIPATED SCHEDULE: 

Advertisement – October 2026

Award-January - 2027

Construction – January 2027 through October 2027

ESTIMATED COST RANGE: 

Between $2,000,000 and $5,000,000

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 15, 2026

    Presolicitation, originally sources sought

    Due September 30, 2026 at 4:00 PM EDT. SAM.gov, notice 04633d3deaa74bd9856924934d466a6d

    2 revisions on SAM
    • September 15, 2026: publish, presolicitation
    • May 19, 2026: publish, sources sought

Points of contact