Solicitation, first published as presolicitation
ND NP THRO 204(1) Buck Hill Road
6982AF25B000004
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Offers due
November 3, 2026 at 4:00 PM EST
2 days from now. Posted October 29, 2026, first published September 15, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- TX FW LGA 10(5) Steve Thompson Wildlife DriveSolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 2 daysNov 3
- WY BR WYAO US20(1) US 20 and Hayden Arch Bridge RepairsSources soughtNAICS 237310Cody, WY6982AF27SS00001Closes in 3 daysNov 4
- OK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsSolicitationSmall businessNAICS 237310Tishomingo, OK6982AF27B000003Closes in 11 daysNov 12
Similar, open now
- Road Maintenance - Sheyenne. Roadway reconditioning and aggregate surface place and aggregate spot surfacing
Forest Service, USDA FS Dakota Prairie Grasslands
Combined synopsis and solicitationSmall businessNAICS 237310Lisbon, ND1240BE27Q0011Closes in 5 daysNov 6 - ND OMAD 2025(1) Minuteman Missile Access Road
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Minot, ND6982AF27B000011Closes in 31 daysDec 2 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2
Description
As published on SAM.gov.
INVITATION FOR BID (IFB)
FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE
PROJECT NUMBER: ND NP THRO 204(1)
PROJECT NAME: Buck Hill Road
PROJECT DESCRIPTION:
Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options.
SCOPE OF THE WORK:
The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot.
The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage.
The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package.
Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area.
Buck Hill Road may be closed for the duration of construction.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
- 11,000 cubic yards of subexcavation
- 1,000 linear feet of geocomposite sheet drain
- 2,000 tons of hot asphalt concrete pavement
- 5,000 tons of roadway aggregate
- 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused)
- 5,100 linear feet of concrete curb and gutter (tan and onyx colored)
- 650 square yards of concrete sidewalk (tan colored)
- 1,600 linear feet of guardrail
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award - January 2027
Construction – April 2027 through November 2027
ESTIMATED COST RANGE:
Between $5,000,000 and $10,000,000
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- ND NP THRO 204(1) - JOFOC_7.31.2026.pdf260 KB, October 1, 2026
- Questions and Answers 09 21 2026 ND NP THRO 204(1) Buck Hill Road.pdf93 KB, September 21, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 15, 2026
Presolicitation, originally sources sought
Due September 30, 2026 at 4:00 PM EDT. SAM.gov, notice 79fd783a138c4712a511e5e338872f1d
2 revisions on SAM
- September 15, 2026: publish, presolicitation
- October 30, 2024: publish, sources sought
September 21, 2026
Presolicitation
Due September 30, 2026 at 4:00 PM EDT. SAM.gov, notice bcce73af1ed54e3aab636788582e30b7
3 revisions on SAM
- September 21, 2026: publish, presolicitation
- September 15, 2026: publish, presolicitation
- October 30, 2024: publish, sources sought
October 1, 2026
Solicitation, originally presolicitation
Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 8522769e61fa4b8e9ccca85a9f15254b
2 revisions on SAM
- October 1, 2026: publish, solicitation
- September 21, 2026: publish, presolicitation
October 7, 2026
Solicitation
Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 725411ccc3ac46efb76d1069217bbfc2
3 revisions on SAM
- October 7, 2026: publish, solicitation
- October 1, 2026: publish, solicitation
- September 21, 2026: publish, presolicitation
October 14, 2026
Solicitation
Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice d603355264cf486e9f7167fc4cc3f0f2
4 revisions on SAM
- September 21, 2026: publish, presolicitation
- October 14, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
- October 1, 2026: publish, solicitation
October 27, 2026
Solicitation
Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice d12c6aab990d4811a5a120eba2152854
5 revisions on SAM
- October 27, 2026: publish, solicitation
- September 21, 2026: publish, presolicitation
- October 14, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
- October 1, 2026: publish, solicitation
October 29, 2026
Solicitation
Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 627bc004858f4f58a44af35a6b332d13
6 revisions on SAM
- October 29, 2026: publish, solicitation
- October 27, 2026: publish, solicitation
- September 21, 2026: publish, presolicitation
- October 14, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
- October 1, 2026: publish, solicitation
Points of contact
- Kelly Palmercflacquisitions@dot.gov