Special notice, total small business set-aside
FALL SITE VISIT - Smiley Creek Bridge Replacement & Road Realignment
1240LT25R0005
Forest Service, Usda-Fs, Csa Intermountain 8. Highway, Street, and Bridge Construction.
Response deadline
November 6, 2024 at 2:00 PM EST
Closed 726 days ago. Posted November 12, 2024, first published October 29, 2024. Scheduled to archive November 21, 2024.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Federal Highway Administration, 690567 Western Federal Lands Div
SolicitationNAICS 237310Coeur d'Alene, ID69056726R000019Closes in 11 daysNov 13 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes todayNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes tomorrowNov 3
Description
As published on SAM.gov.
DRAFT – NOT FOR PROPOSAL/QUOTE/BID Update to Site Visit: Visit was held at the scheduled time. Three additional documets are being attached to this special Notice. 0. Sign in sheet 1. Meeting notes 2. Draft Layout Plan (Map) This concludes the purpose of this special notice until a date in the future that the Forest Service desides to issue a solicitation. Inclement Weather – Seasonal Site Visit Smiley Creek Bridge Replacement & Road Realignment Sawtooth National Forest General Information Solicitation No.:
1240LT25R0005 Document Type:
Site Visit Posted Date:
10/29/24 Site Visit Date:
11/07/2024 Site Visit Meeting Time: 11:00 am Mountain Time Description of Work “THIS PRESOLICITATION NOTICE IS ISSUED FOR INFORMATIONAL PURPOSES ONLY TO PROVIDE AN OPPORTUNITY FOR VENDORS TO ASSESS THE PROJECT SITE PRIOR TO INCLEMENT WEATHER OR SEASONAL CLOSURES AND PRIOR TO ISSUANCE OF THE SOLICITATION. THIS IS NOT A REQUEST FOR PROPOSAL/QUOTE OR BID. The Forest Service anticipates issuing a full solicitation at a time when the project site will be unavailable due to seasonal closures/weather.
Interested vendors are encouraged to visit the site for a full understanding and, if desired, take photos or videos.” Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will construct a new single lane road bridge across Smiley Creek including connecting road approaches.
Construction will consist of 1) installing a new approximately 16’ wide by 60’ long prefabricated steel bridge superstructure set on new treated timber abutments including construction of new abutment riprap armoring material and placement of new aggregate wear surface; 2) constructing new road approaches on either side of the new bridge totaling approximately 300 lineal feet on each side; and 3) performing other miscellaneous improvements as required.
The Government does not intend to award a contract(s) based solely on this site visit nor does it intend to pay for any costs incurred in response to this announcement. The intent of this notice is to ensure that prospective vendors may see the areas prior to heavy snowfall and issuing the solicitation. This is not a final solicitation or scope of work.
This project is in draft and is subject to change when the solicitation comes out Site Visit Location: From Sawtooth City, Idaho travel south along Forest Road 70077 approximately 5.5 miles to the project location.
Coordinates: 43.833352° N, 114.821909° W Those participating in the site visit must furnish their own transportation. Please inform Braidy Richins, Assistant Forest Engineer, if you plan to attend, by e-mailing him at braidy.richins@usda.gov by noon of the day before the site visit.
Magnitude of the Proposed Project: In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $500,000 and $1,000,000.
Point of Contact: Braidy Richins braidy.richins@usda.gov FAR 52.237-1 Site Visit. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Tony Taylor - Contract Specialisttony.taylor@usda.gov
- Braidy RichinsBraidy.Richins@usda.gov