Vendor, North Charleston, SC
Harbor Services, Inc.
UEI JH52YFL71EA3, CAGE 57YY6
72 awards and $31,269,259 obligated between January 18, 2024 and October 28, 2026, 93% under full and open competition, against 6.3 offers on average where reported. 58 of the awards trace back to a SAM.gov solicitation on this site.
Sells to
Awarding agencies by dollars.
| Department of Veterans Affairs | $25,194,551 |
| Department of the Air Force | $5,133,567 |
| Department of State | $938,141 |
| Department of the Army | $3,000 |
Industries
NAICS on the awards, by dollars.
| Commercial and Institutional Building ConstructionNAICS 236220 | $25,441,860 |
| Roofing ContractorsNAICS 238160 | $5,617,003 |
| Finish Carpentry ContractorsNAICS 238350 | $95,508 |
| Plumbing, Heating, and Air-Conditioning ContractorsNAICS 238220 | $85,500 |
| Painting and Wall Covering ContractorsNAICS 238320 | $29,388 |
How it wins
Awards by competition, set-aside and type.
| Full and Open Competition After Exclusion of Sources | 67 |
| Competed Under SAP | 3 |
| Not Competed Under SAP | 2 |
| Service Disabled Veteran Owned Small Business SET-ASIDE | 22 |
| 8A Competed | 2 |
| Sdvosb Sole Source | 1 |
| Delivery Order | 53 |
| Definitive Contract | 13 |
| Purchase Order | 4 |
Hear when Harbor Services, Inc. wins an award and when a contract it holds is about to end.Follow it
Contracts ending soon
Contracts Harbor Services, Inc. holds whose performance ends in the next 19 months, by published end date. Each one is a recompete to prepare for.
- Ending
- 9
- Obligated so far
- $18,960,310
- Soonest
- October 30, 2026
The 9 contracts, the office behind each one and the dates are in the workspace. See them
Competes with
Vendors selling commercial and institutional building construction to Department of Veterans Affairs, by dollars.
| Sawtooth Construction JV II LLCChicago, IL | $258,581,168 |
| Richard Group LLCChicago, IL | $234,851,709 |
| Hurley Jv, LLPColorado Springs, CO | $228,102,665 |
| Hsgs-Ameresco, LLCSummerville, SC | $202,439,821 |
| Birmingham Industrial Construction, LLCColumbiana, AL | $189,329,279 |
| Esa South, Inc.Cantonment, FL | $188,378,098 |
Solicitations it won
SAM.gov opportunities whose award USAspending attributes to this vendor.
- 534-24-902 - Temporary Compounding Area (DD Bldg) - Construction (VA-26-00009675)
Department of Veterans Affairs, 247-Network Contract Office 7
Award noticeSDVOSBNAICS 236220Charleston, SC36C24726B0002Awarded to Harbor Services, Inc. for $259,773
Posted Jun 177 publications - 557-21-103 Correct Critical Roof and Exterior Wall Deficiencies CONSTRUCTION
Department of Veterans Affairs, 247-Network Contract Office 7
Award noticeSDVOSBNAICS 238160Dublin, GA36C24726R0030Awarded to Harbor Services, Inc. for $5,617,003
Posted Jun 167 publications - Renovate B3-EHRM Training and Admin Space Project 544 22 703 EHRM Construction 6439 Garner's Ferry Rd. Columbia VAMC Columbia, SC 29209
Department of Veterans Affairs, Pcac
Award noticeSDVOSBNAICS 236220Columbia, SC36C77626R0032Awarded to Harbor Services, Inc. for $2,279,415
Posted May 272 publications - Renovate Bldg. 15, 2nd Floor
Department of Veterans Affairs, 246-Network Contracting Office 6
Award noticeSDVOSBNAICS 236220Asheville, NC36C24625B0007Awarded to Harbor Services, Inc. for $2,889,292
Posted Oct 29, 202523 publications - 509-24-210 - Correct Patient Safety 2F
Department of Veterans Affairs, 247-Network Contract Office 7
Award noticeSDVOSBNAICS 236220Augusta-Richmond County, GA36C24725R0053Awarded to Harbor Services, Inc. for $407,933
Posted Apr 16, 20253 publications - Replacement of Boiler Blow-off Tank - Charleston VA Healthcare System
Department of Veterans Affairs, 247-Network Contract Office 7
Award noticeSDVOSBNAICS 238220Charleston, SC36C24724Q0928Awarded to Harbor Services, Inc. for $87,500
Posted Sep 4, 20243 publications - Resurfacing Nurse Station with Architectural Film
Department of Veterans Affairs, 247-Network Contract Office 7
PresolicitationSDVOSBNAICS 238350Charleston, SC36C24724Q0943Awarded to Harbor Services, Inc.
Posted Jul 31, 20242 publications - 534-23-909 - Audiology Security Doors
Department of Veterans Affairs, 247-Network Contract Office 7
Combined synopsis and solicitationSDVOSBNAICS 236220Charleston, SC36C24724B0012Awarded to Harbor Services, Inc.
Posted Jul 10, 20248 publications
Awards
Every award in the window, by dollars obligated.
| Contract | Awarding office | Described as | Obligated |
|---|---|---|---|
| 36C24724N0566Delivery Order, April 26, 2024, Full and Open Competition After Exclusion of Sources, 2 offers | 247-Network Contract Office 7Department of Veterans Affairs | Project Number 509-23-401 Design to Correct Electrical Deficiencies in Building 801, Phase 1NAICS 236220, PSC Y1DA | $6,287,803 |
| 36C24726C0037Definitive Contract, June 16, 2026, Full and Open Competition After Exclusion of Sources, 7 offersSolicitation | 247-Network Contract Office 7Department of Veterans Affairs | Repair RoofNAICS 238160, PSC Z1DA | $5,617,003 |
| 36C24724N0240Delivery Order, March 29, 2024, Full and Open Competition After Exclusion of Sources, 3 offers | 247-Network Contract Office 7Department of Veterans Affairs | This Task Order Award Is Issued to Complete Project 544-22-116 to Replace Electrical Panels and Breakers and to Correct Electrical DeficiencNAICS 236220, PSC Z1DA | $5,126,645 |
| 36C24626C0013Definitive Contract, October 29, 2025, Full and Open Competition After Exclusion of Sources, 3 offersSolicitation | 246-Network Contracting Office 6Department of Veterans Affairs | Renovate BLDG 15 2ND FloorNAICS 236220, PSC Y1AZ | $2,889,292 |
| 36C77626C0054Definitive Contract, May 27, 2026, Full and Open Competition After Exclusion of Sources, 11 offersSolicitation | PcacDepartment of Veterans Affairs | To Complete the Renovation Construction Project at the Columbia VA Medical Center for the Ehrm Training and Admin Space in Building B3. the NAICS 236220, PSC Y1DZ | $2,279,415 |
| 36E77619C0082Definitive Contract, May 14, 2024, Full and Open Competition After Exclusion of Sources, 2 offers | PcacDepartment of Veterans Affairs | Correct Various Design Omissions and Material Cost IncreasesNAICS 236220, PSC Z2DA | $1,593,799 |
| 36C24623C0010Definitive Contract, January 23, 2024, Full and Open Competition After Exclusion of Sources, 4 offers | 246-Network Contracting Office 6Department of Veterans Affairs | Renovate 4B for Medical Center Support StaffNAICS 236220, PSC Y1DA | $1,459,158 |
| 36C24623C0013Definitive Contract, February 18, 2025, Full and Open Competition After Exclusion of Sources, 4 offers | 246-Network Contracting Office 6Department of Veterans Affairs | Renovate 4A for Nursing Administration and Education P00002 Admin Cs/CoNAICS 236220, PSC Y1DA | $1,089,245 |
| 19AQMM25C0473Definitive Contract, September 30, 2025, Full and Open Competition After Exclusion of Sources, 6 offers | Acquisitions - Aqm MomentumDepartment of State | Charleston Regional Center Building D Scanning Facility RenovationNAICS 236220, PSC Y1AA | $938,141 |
| 36C24723N0619Delivery Order, January 24, 2024, Full and Open Competition After Exclusion of Sources, 2 offers | 247-Network Contract Office 7Department of Veterans Affairs | PN 509-18-602 Correct Parking & Roadways Deficiencies P0002 NcteNAICS 236220, PSC Z2DA | $927,840 |
| 36C24623C0058Definitive Contract, May 1, 2025, Full and Open Competition After Exclusion of Sources, 3 offers | 246-Network Contracting Office 6Department of Veterans Affairs | Renovate 1C for Surgical and Non Surgical StaffNAICS 236220, PSC Y1DA | $725,895 |
| FA483024F0087Delivery Order, September 24, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Provide a New Motorola Model Shelter, New Communication Tower and Foundation, New Site Grounding System, New Electrical Service, Generator WNAICS 236220, PSC Z2JZ | $660,919 |
| FA483024F0067Delivery Order, July 28, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Construct Fencing Hightower Road Antiterrorism and Force ProtectionNAICS 236220, PSC Z2JZ | $561,348 |
| FA483024F0088Delivery Order, September 24, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Replace Weatherstripping Around Door Frame2. Replace Flooring All Work Shall Be Accomplished at B32NAICS 236220, PSC Z2JZ | $412,866 |
| 36C24725C0055Definitive Contract, April 15, 2025, Not Competed Under SAP, 1 offersSolicitation | 247-Network Contract Office 7Department of Veterans Affairs | Mag Doors and SecurityNAICS 236220, PSC Z2DA | $407,933 |
| FA483025F0036Delivery Order, August 12, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Demo (14), Construct (9) Picnic Shelters, Grassy Pond. the Requirement Shall Be Completed Iaw Sow Dated 22 May 25. Contractor Shall Furnish NAICS 236220, PSC Z2JZ | $399,866 |
| FA483025F0032Delivery Order, July 7, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Replace Chiller and Pipe at B105. All Work Should Be Accomplished at Moody AFB Iaw Sow Dated June 7NAICS 236220, PSC Z2JZ | $328,552 |
| 36C24726C0049Definitive Contract, June 16, 2026, Full and Open Competition After Exclusion of Sources, 4 offersSolicitation | 247-Network Contract Office 7Department of Veterans Affairs | Project 534-24-902 Temporary Compounding AreaNAICS 236220, PSC Z1DA | $259,773 |
| FA483025F0042Delivery Order, August 21, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Remove and Replace B721 DX HVAC Unit All Work Should Be Accomplished at Moody AFB Iaw Sow 12 June 2NAICS 236220, PSC Z2JZ | $243,241 |
| FA483026F0016Delivery Order, May 1, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Moody Building 550/553 Dorm Lighting UpgradeNAICS 236220, PSC Z2JZ | $240,920 |
| 36C24724N0117Delivery Order, January 18, 2024, Full and Open Competition After Exclusion of Sources, 2 offers | 247-Network Contract Office 7Department of Veterans Affairs | 544-23-128 Repair East Campus Water FeedNAICS 236220, PSC Z1DA | $234,295 |
| FA483025F0060Delivery Order, September 25, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Repair Roof Leaks and Damage, Storm Helene, Building 657NAICS 236220, PSC Z2JZ | $229,919 |
| 36C24718C0193Definitive Contract, February 15, 2024, Full and Open Competition After Exclusion of Sources, 6 offers | 247-Network Contract Office 7Department of Veterans Affairs | EO14042 - Renovate Mental Health Ward, Augusta GaNAICS 236220, PSC Y1DA | $208,956 |
| FA483024F0036Delivery Order, May 10, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Complete Aspr 15-0124, Avon Park, Fl, Bldg. 236: 1. Remove and Demo Existing Generator2. Furnish and InNAICS 236220, PSC Z2JZ | $158,197 |
| FA483025F0034Delivery Order, September 2, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Replace the Siding and Trim at B20-23 and B20510 All Work Should Be Accomplished at Grassy Pond IawNAICS 236220, PSC Z2JZ | $156,739 |
| FA483024F0024Delivery Order, April 18, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Repair Carpet/Sheetrock at B718 Moody Afb. the Requirement Shall Be Completed Iaw the Sow.NAICS 236220, PSC Z2PZ | $117,654 |
| FA483026F0024Delivery Order, May 28, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Building 454 - Replace Air Handling UnitNAICS 236220, PSC Z2JZ | $115,456 |
| 36C24724C0081Definitive Contract, August 27, 2024, Full and Open Competition After Exclusion of Sources, 1 offersSolicitation | 247-Network Contract Office 7Department of Veterans Affairs | Audiology Security Badge Access DoorsNAICS 236220, PSC Z2DA | $112,463 |
| FA483024F0092Delivery Order, September 29, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Demo B153 Latrine2. Renovate B460 Latrine. All Work Should Be Accomplished at Moody AFB Iaw Sow 3 SNAICS 236220, PSC Z2JZ | $104,965 |
| FA483025F0014Delivery Order, March 31, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Demo Existing Concrete PAD2. Prep and Pour New Concrete Pad 3. Construct New Picnic Shelter4. InstaNAICS 236220, PSC Z2JZ | $96,781 |
| 36C24724P1156Purchase Order, August 19, 2024, Competed Under SAP, 1 offersSolicitation | 247-Network Contract Office 7Department of Veterans Affairs | Resurfacing of 3 Nurse StationsNAICS 238350, PSC J071 | $95,508 |
| FA483026F0017Delivery Order, May 7, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Demolish Hunt HQ Cabin at B600 Avon Park Complete All Work Iaw Applicable Sow Dated 06 April 2026NAICS 236220, PSC Z2JZ | $91,728 |
| FA483024F0011Delivery Order, February 2, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Simplified Acquisition of Base Engineering Requirements Saber Task Order to Repair Storm Idalia Damage. Building 966NAICS 236220, PSC Z2EB | $87,425 |
| 36C24724P1222Purchase Order, September 6, 2024, Competed Under SAP, 5 offersSolicitation | 247-Network Contract Office 7Department of Veterans Affairs | Replacement of Boiler Blowoff TankNAICS 238220, PSC J044 | $85,500 |
| FA483026F0019Delivery Order, May 18, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Avon Park Building 28 Replace Fire Pumps. Complete All Work Iaw with Applicable Sow Dated April 28, 2026. the Contractor Shall Furnish All LNAICS 236220, PSC Z2AZ | $83,248 |
| FA483025F0051Delivery Order, September 15, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Demo Pavilions One, Two and Three. 2. Replace Pavilion One 3. Install a Quazite Underground EnclosuNAICS 236220, PSC Z2JZ | $79,610 |
| FA483024F0060Delivery Order, June 26, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Replace the HVAC at Moody AFB Building 7082. Tie Into the Existing Emcs. All Work Should Be AccomplNAICS 236220, PSC Z2JZ | $76,740 |
| FA483024F0065Delivery Order, July 23, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Demo and Repair the Lakeside Deck at Grassy Pondall Work Should Be Accomplished at Grassy Pond Iaw NAICS 236220, PSC Z2JZ | $71,053 |
| FA483026F0018Delivery Order, May 7, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of the Task Order Is To: 1 Demolish the Existing Wash Rack Support Office, B760 Complete All Work Iaw Applicable Sow Dated 30 MaNAICS 236220, PSC Z2JZ | $70,116 |
| FA483024F0028Delivery Order, April 24, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Repair Damage to Replace Carpet/Walls Fire Station at Building 621 on Moody Afb. the Requirement Shall NAICS 236220, PSC Z2PZ | $66,899 |
| FA483024F0059Delivery Order, June 24, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Complete Qseu 24-0135: 1. Repaint Moody AFB Youth Center Gym, B1804requirement Shall Be Accomplished IaNAICS 236220, PSC Z2JZ | $55,242 |
| FA483024F0050Delivery Order, June 13, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Complete the Requirement of Qseu 22-0812, by Renovating the Male and Female Restrooms at Moody AFB BuilNAICS 236220, PSC Z2JZ | $53,029 |
| FA483025F0067Delivery Order, September 30, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Replace the Existing Drain System 2. Strip and Repaint Pool and Locker Room Floors All Work Should NAICS 236220, PSC Z2JZ | $52,349 |
| FA483024F0014Delivery Order, February 27, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Simplified Acquisition of Base Engineering Requirements Saber Task Order to Repair Storm Idalia Damage.NAICS 236220, PSC Z2NZ | $45,211 |
| FA483024F0012Delivery Order, February 21, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Simplified Acquisition of Base Engineering Requirements Saber Task Order to Repair Six Storm Idalia Damage Projects at Grassy Pond.NAICS 236220, PSC Z2JZ | $42,241 |
| FA483025F0040Delivery Order, September 2, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Replace Roofing, Siding, Trim and Doors at Grassy Pond Roundhouse B20507 All Work Should Be AccomplNAICS 236220, PSC Z2JZ | $38,103 |
| FA483024F0066Delivery Order, July 30, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Repair and Refurbish Roundhouse Hvac.NAICS 236220, PSC Z2JZ | $35,229 |
| FA483026F0027Delivery Order, June 3, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Directional Boring Building 609NAICS 236220, PSC Z2JZ | $35,163 |
| 36C24723N0131Delivery Order, December 18, 2024, Full and Open Competition After Exclusion of Sources, 5 offers | 247-Network Contract Office 7Department of Veterans Affairs | Mod to Descope Doors and PharmacyNAICS 236220, PSC Y1DA | $32,811 |
| FA483024F0055Delivery Order, June 17, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Replacing the HVAC and Renovating the Male and Female Restrooms at Moody AFB Building 1806. All Work ShNAICS 236220, PSC Z2JZ | $32,423 |
| FA483024F0041Delivery Order, June 13, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Installation of New Electrical Outlets to Individual Equipment Lockers in B606, Moody Afb.All Work NAICS 236220, PSC Z2JZ | $31,327 |
| FA483024F0010Delivery Order, February 2, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Simplified Acquisition of Base Engineering Requirements Saber Task Order to Repair Grassy Pond CabinsNAICS 236220, PSC Z2EB | $31,267 |
| FA483024F0051Delivery Order, June 13, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Upgrade Electrical System in Bldg. 807 on Moody AFB.2. Install New Vehicle Lift the Contactor ShallNAICS 236220, PSC Z2JZ | $30,274 |
| FA483025P0093Purchase Order, September 29, 2025, Not Competed Under SAP, 1 offers | FA4830 23 Cons CCDepartment of the Air Force | Install Wallpaper in B105NAICS 238320, PSC Z2JZ | $29,388 |
| FA483025F0039Delivery Order, September 2, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Replace Stairs and Boardwalk at Grassy Ponds All Work Should Be Accomplished at Grassy Pond Iaw SowNAICS 236220, PSC Z2JZ | $29,272 |
| FA483024F0038Delivery Order, May 21, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: 1. Demo Bldg. 43 Picnic Shelter2 . Construct New Picnic Shelter West of Bldg. 43 All Work Should Be AcNAICS 236220, PSC Z2PZ | $27,694 |
| FA483025F0066Delivery Order, September 30, 2025, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: Furnish and Install New Safety Switch for Bead Breaker. Furnish and Install New Safety Switch for WheeNAICS 236220, PSC Z2JZ | $26,235 |
| FA483024F0016Delivery Order, April 17, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Repair Damage to Sidewalk and Steps Near B1301 on Moody Afb. the Requirement Shall Be Completed Iaw theNAICS 236220, PSC Z2PZ | $19,688 |
| FA483026F0015Delivery Order, May 4, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Building 932 - Minor Interior RenovationNAICS 236220, PSC Z2AZ | $16,904 |
| FA483024F0052Delivery Order, June 12, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is To: Install Dorm Directory Signs to 13 Bldgs. Located on Moody AFB Bldgs.: 580, 572, 573, 545, 546, 548, 5NAICS 236220, PSC Z2JZ | $13,363 |
| FA483024F0025Delivery Order, April 16, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of the Task Order Is To: 1. Complete Requirement Qseu 22-0100 (Formally Qseu 22-0146)A. Reconfigure the Vestibule in Bldg. 646 oNAICS 236220, PSC Z2JZ | $12,112 |
| FA483026F0008Delivery Order, February 24, 2026, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This to Is To: A. Add Approximately 150 Feet of Conduit, New Switch Locations Are Farther from Panel. B. Add Cabling as RequiNAICS 236220, PSC Z2PZ | $11,590 |
| FA483024F0022Delivery Order, April 11, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | The Purpose of This Task Order Is to Replace Siding and Soffit at Grassy Pond on Moody Afb. the Requirement Shall Be Completed Iaw the Sow.NAICS 236220, PSC Z2PZ | $10,968 |
| 36C24724P0102Purchase Order, February 27, 2024, Competed Under SAP, 3 offers | 247-Network Contract Office 7Department of Veterans Affairs | Laminar Flow DiffusersNAICS 236220, PSC C1AZ | $8,333 |
| W912HP25FA165Delivery Order, September 19, 2025, Full and Open Competition After Exclusion of Sources, 9 offers | W074 Endist CharlestonDepartment of the Army | Sdvosb Db/Dbb Idc Minimum Guarantee $3,000 Will Be Deobligated Upon Award of the First Task Order.NAICS 236220, PSC Y1JZ | $3,000 |
| 36C24721N0486Delivery Order, March 1, 2024, Full and Open Competition After Exclusion of Sources, 2 offers | 247-Network Contract Office 7Department of Veterans Affairs | Cath Lab HVACNAICS 236220, PSC Y1DA | $1,474 |
| 36C77627N0023Delivery Order, October 28, 2026, Full and Open Competition After Exclusion of Sources, 60 offers | PcacDepartment of Veterans Affairs | VISN 8 Construction IDIQ Matoc - Mainland Rfo Eo 14398NAICS 236220, PSC Y1DA | $1,000 |
| FA483024F0064Delivery Order, July 30, 2024, Full and Open Competition After Exclusion of Sources | FA4830 23 Cons CCDepartment of the Air Force | Repair Cabins A, C and J at Grassy Pond.NAICS 236220, PSC Z2JZ | $250 |
| 36C24723N0567Delivery Order, September 24, 2024, Full and Open Competition After Exclusion of Sources, 1 offers | 247-Network Contract Office 7Department of Veterans Affairs | Modification to Execute No Cost Time Extension.NAICS 236220, PSC Y1DA | $0 |
| FA483024D0002October 24, 2024, Full and Open Competition After Exclusion of Sources, 5 offers | FA4830 23 Cons CCDepartment of the Air Force | Simplified Acquisition of Base Engineering Requirements (Saber) Contract for Minor Construction Projects.NAICS 236220, PSC Z2JZ | $0 |
| W912HP25D5014September 18, 2025, Full and Open Competition After Exclusion of Sources, 19 offersSolicitation | W074 Endist CharlestonDepartment of the Army | Sdvosb Db/Dbb MatocNAICS 236220, PSC Y1JZ | $0 |
| 36C77622C0098Definitive Contract, October 1, 2024, Full and Open Competition After Exclusion of Sources, 4 offers | PcacDepartment of Veterans Affairs | Ehrm Correct Data Center Design-BuildNAICS 236220, PSC Y1DA | -$4,249,590 |
- Places of performance
- GeorgiaSouth CarolinaNorth CarolinaFlorida
- Product and service codes
- Z1DA Maintenance Of Hospitals And InfirmariesY1DA Construction Of Hospitals And InfirmariesZ2JZ Repair Or Alteration Of Miscellaneous BuildingsZ2DA Repair Or Alteration Of Hospitals And InfirmariesY1AZ Construction Of Other Administrative Facilities And Service BuildingsY1DZ Construction Of Other Hospital Buildings
- Transactions
- 128 across 72 awards