Vendor, Anchorage, AK, part of Arctic Slope Regional Corporation
Asrc Earthworks, LLC
UEI UNMLFNGA9WT9, CAGE 6P7G0
52 awards and $67,889,572 obligated between January 16, 2024 and June 3, 2026, 100% under full and open competition, against 3.5 offers on average where reported. 8 of the awards trace back to a SAM.gov solicitation on this site.
Sells to
Awarding agencies by dollars.
| Department of the Air Force | $34,492,322 |
| Department of the Army | $33,397,250 |
Industries
NAICS on the awards, by dollars.
| Highway, Street, and Bridge ConstructionNAICS 237310 | $34,492,322 |
| Commercial and Institutional Building ConstructionNAICS 236220 | $33,397,250 |
How it wins
Awards by competition, set-aside and type.
| Full and Open Competition After Exclusion of Sources | 52 |
| Small Business Set Aside - Total | 1 |
| 8A Competed | 1 |
| Delivery Order | 50 |
| Definitive Contract | 1 |
Solicitations it won
SAM.gov opportunities whose award USAspending attributes to this vendor.
- OLI002 Road Repair
Department of the Army, W2SN Endist Alaska
Award noticeSmall businessNAICS 236220AlaskaW911KB24R0041Awarded to Asrc Earthworks, LLC for $34,084,500
Posted Oct 18, 20248 publications
Awards
Every award in the window, by dollars obligated.
| Contract | Awarding office | Described as | Obligated |
|---|---|---|---|
| W911KB24C0022Definitive Contract, September 30, 2024, Full and Open Competition After Exclusion of Sources, 1 offersSolicitation | W2SN Endist AlaskaDepartment of the Army | OLI002 Oliktok Road RepairNAICS 236220, PSC Y1LB | $33,397,250 |
| FA500025F0106Delivery Order, September 12, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Construct Elbow Expansion Phase BNAICS 237310, PSC Z2LB | $6,405,476 |
| FA500025F0089Delivery Order, July 30, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Work on Rickenbacker Ave. Between 18TH and 20TH Involves Repairing and Replacing Damaged Pavements, Upgrading Storm Drains, and InstalliNAICS 237310, PSC Z2LB | $2,569,752 |
| FA500024F0018Delivery Order, January 31, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Repair Paving Fighter DriveNAICS 237310, PSC Z2LB | $2,360,569 |
| FA500024F0069Delivery Order, June 25, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | "the Purpose of This Project Is to Repair the Ammo Supply Point (Asp) Road, Extend the Usable Space at the Ammunition Magazine, and Provide NAICS 237310, PSC Z2LB | $2,167,926 |
| FA500026F0014Delivery Order, January 27, 2026, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | FXSB 24-9051 Repair Carswell Ave and 10TH ST and Realign Carswell AveNAICS 237310, PSC Z1LB | $1,969,725 |
| FA500024F0067Delivery Order, June 11, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Contractor Shall Furnish All Design, Parts, Plants, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All WoNAICS 237310, PSC Z1JZ | $1,781,023 |
| FA500026F0013Delivery Order, January 29, 2026, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Jber. Requirements Include, But Are Not Limited To, Airfield Pavements (Runways, Taxiways, ApronNAICS 237310, PSC Z2LB | $1,683,769 |
| FA500025F0006Delivery Order, November 6, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber).NAICS 237310, PSC Z2LB | $1,499,150 |
| FA500024F0126Delivery Order, September 13, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Project Will Repair Talley Avenue at Jber-Elmendorf, Addressing Erosion in the Pavement and Replacing Road Shoulders for Better Water DrNAICS 237310, PSC Z2LB | $1,457,666 |
| FA500024F0063Delivery Order, July 1, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Contractor Shall Furnish All Design, Plant, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (InclNAICS 237310, PSC Z2LB | $1,369,917 |
| FA500025F0112Delivery Order, September 11, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Repair First Street (Between D Street and Richardson Drive, Jber-R, AkNAICS 237310, PSC Z2JZ | $1,113,828 |
| FA500024F0080Delivery Order, July 26, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Contractor Shall Furnish All Design, Plant, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (IncludinNAICS 237310, PSC Z2LB | $1,082,763 |
| FA500024F0062Delivery Order, May 31, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Contractor Shall Furnish All Design, Parts, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (InclNAICS 237310, PSC Z2LB | $1,058,566 |
| FA500025F0047Delivery Order, May 9, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | FXSB 25-1805 Repair Taxiway MNAICS 237310, PSC Z2BD | $1,028,503 |
| FA500025F0128Delivery Order, September 30, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | This Project Will Repaint the Roadway Markings Throughout the Elmendorf Side of Joint Base Elmendorf-Richardson (Jber).NAICS 237310, PSC Z1LB | $999,996 |
| FA500024F0084Delivery Order, July 26, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Contractor Shall Furnish All Design, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (Including WNAICS 237310, PSC Y1GZ | $894,493 |
| FA500025F0110Delivery Order, September 11, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Jber, Alaska Iaw Statement of Work for HJZH 24-4628 Repair 5TH Street (Between D Street and DaviNAICS 237310, PSC Z2JZ | $851,376 |
| FA500024F0071Delivery Order, June 27, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Contractor Shall Furnish All Design, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (Including WNAICS 237310, PSC Z1JZ | $788,077 |
| FA500025F0109Delivery Order, September 10, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | HJZH 25-7644 Repair Davis Hwy E Randall to Army Guard RDNAICS 237310, PSC Z2LB | $664,604 |
| FA500024F0120Delivery Order, September 25, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Contractor Shall Furnish All Design, Parts, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (InclNAICS 237310, PSC Z1LB | $489,972 |
| FA500024F0102Delivery Order, September 12, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Contractor Shall Furnish All Design, Parts, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (InclNAICS 237310, PSC Z2LB | $377,690 |
| FA500025F0131Delivery Order, September 23, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Jber, Alaska. Requirements Include, But Are Not Limited To, Airfield Pavements and Road PavementNAICS 237310, PSC Z1LZ | $368,129 |
| FA500023F0101Delivery Order, September 19, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LZ | $331,149 |
| FA500026F0048Delivery Order, May 8, 2026, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | FXSB 26-9044 Repair Taxiway at Intersection D and MNAICS 237310, PSC Z1LB | $243,220 |
| FA500025F0087Delivery Order, August 6, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Install Concrete Speed Tables at Boniface GateNAICS 237310, PSC Z2JZ | $188,252 |
| FA500025F0108Delivery Order, September 11, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Remove Existing Swing Gates and Install Concrete Speed Tables at the Government Hill Gate. Remove Pavement, Install New Reinforced Speed TabNAICS 237310, PSC Z2LB | $170,282 |
| FA500022F0170Delivery Order, April 18, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Repair Hangar 21 Apron Twy J - Over Excavate an Area Additional 24 and Place Geotextile Separation Fabric Approximately 260 LF X35 LF SectioNAICS 237310, PSC Z2JZ | $98,424 |
| FA500025F0044Delivery Order, May 7, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Jber, Alaska. Requirements Include, But Are Not Limited To, Airfield Pavements (Runways, TaxiwayNAICS 237310, PSC 5610 | $76,000 |
| FA500022F0048Delivery Order, January 31, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | EPA Modification for Labor, and Fuel and Oil.NAICS 237310, PSC Z2LB | $74,936 |
| FA500024F0150Delivery Order, September 26, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Hospital Parking Lot SignsNAICS 237310, PSC Z2JZ | $62,987 |
| FA500023F0105Delivery Order, March 25, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Joint Base Elmendorf-Richardson (Jber) Is Located on the Northern Edge of Anchorage, Alaska and Is Nearest Accessible from the Glenn HighwayNAICS 237310, PSC Z1LB | $56,752 |
| FA500023F0104Delivery Order, September 19, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z1LZ | $53,859 |
| FA500025F0051Delivery Order, May 9, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Jber, Alaska. Requirements Include, But Are Not Limited To, Airfield Pavements (Runways, TaxiwayNAICS 237310, PSC 3895 | $48,265 |
| FA500023F0037Delivery Order, January 29, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber).NAICS 237310, PSC Z2JZ | $47,898 |
| FA500023F0103Delivery Order, August 28, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LB | $32,320 |
| FA500022F0169Delivery Order, May 22, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | The Project Will Repair Parallel Taxiway (Twy) E from Twy M to Twy J, Including Shoulder Repair. Taxiway Edge Lighting Shall Be Adjusted to NAICS 237310, PSC Z2BD | $31,406 |
| FA500023F0159Delivery Order, March 20, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | FXSB 23-9716 Vandenberg Over Ship Creek GuardrailNAICS 237310, PSC Z2LB | $25,367 |
| FA500025F0043Delivery Order, May 5, 2025, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Jber, Alaska. Requirements Include, But Are Not Limited To, Airfield Pavements (Runways, TaxiwayNAICS 237310, PSC 3895 | $19,500 |
| FA500023F0169Delivery Order, January 16, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | HJZH 23-1049 Construct Toc Pads& Parking Lot B765NAICS 237310, PSC Z2LB | $14,590 |
| FA500023F0111Delivery Order, February 21, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | FXSB 23-2107 Repair Aas Panels, Barrier 3NAICS 237310, PSC Z2BD | $11,126 |
| FA500022F0114Delivery Order, April 19, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Added Attachment 1 - (Sow) FXSB 22-2001 Repair Hardstand 38, Modification 2, Rev 1/25/2023, See 1.3,1.3.4, Pavement, F and 1.3, 1.3.5, MisceNAICS 237310, PSC Z2JZ | $11,025 |
| FA500024F0005Delivery Order, May 21, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LB | $4,765 |
| FA500023F0170Delivery Order, August 28, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LB | $3,439 |
| FA500023F0098Delivery Order, August 28, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LZ | $3,131 |
| FA500023F0151Delivery Order, September 1, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LB | $721 |
| FA500024F0004Delivery Order, September 9, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LZ | $552 |
| FA500023F0161Delivery Order, August 28, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson (Jber), Alaska. Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z1JZ | $77 |
| FA500021D0002March 24, 2025, Full and Open Competition After Exclusion of Sources, 6 offers | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LB | $0 |
| FA500023F0040Delivery Order, May 10, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Contractor Shall Furnish All Design, Plant, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (IncludinNAICS 237310, PSC Z2LB | -$13,391 |
| FA500023F0044Delivery Order, May 9, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Paving Indefinite Quantity Requirements for Joint Base Elmendorf-Richardson, Alaska (Jber). Requirements Include, But Are Not Limited To, AiNAICS 237310, PSC Z2LZ | -$16,854 |
| FA500023F0022Delivery Order, May 8, 2024, Full and Open Competition After Exclusion of Sources | FA5000 673 Cons PKBDepartment of the Air Force | Contractor Shall Furnish All Design, Plant, Labor, Equipment, Supplies, Materials, Appliances, Transportation and Perform All Work (IncludinNAICS 237310, PSC Z1LB | -$70,443 |
- Places of performance
- Alaska
- Product and service codes
- Y1LB Construction Of Highways, Roads, Streets, Bridges, And RailwaysZ2LB Repair Or Alteration Of Highways/Roads/Streets/Bridges/RailwaysZ1LB Maintenance Of Highways/Roads/Streets/Bridges/RailwaysZ1JZ Maintenance Of Miscellaneous BuildingsZ2JZ Repair Or Alteration Of Miscellaneous BuildingsZ2BD Repair Or Alteration Of Airport Runways And Taxiways
- Transactions
- 99 across 52 awards