Skip to content
Abierto

Solicitation, total small business set-aside

GREEN RIVER LOCK AND DAM #1 INTERLOCK WIRING AND EQUIPMENT INSTALLATION

W912QR25QA049

Department of the Army, W072 Endist Louisville. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

August 11, 2025 at 2:00 PM EDT

Closed 403 days ago. Posted August 8, 2025, first published July 8, 2025. Scheduled to archive August 8, 2026.

Description

As published on SAM.gov.

PROJECT TITLE: GREEN RIVER LOCK AND DAM #1 INTERLOCK WIRING AND EQUIPMENT INSTALLATIONPROJECT LOCATION: REED, KENTUCKY 42451THE CONTRACTOR SHALL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO INSTALL WIRING AND ELECTRICAL COMPONENTS AND MOUNTS FOR THE LOCK CONTROL SYSTEM LOCATED AT GREEN RIVER LOCK AND DAM 1, 5048 DAM AND LOCK ROAD, REED, KY 42451. PRICES SHALL INCLUDE MOBILIZATION AND DE-MOBILIZATION, FUEL, LABOR, MATERIAL AND EQUIPMENT.

THE CONTRACTOR?S WORK AND RESPONSIBILITY SHALL INCLUDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT, SUPERVISION, COMMUNICATIONS AND INSPECTION NECESSARY TO ASSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ATTACHED SPECIFICATIONS, DRAWINGS, AND ALL OTHER TERMS AND CONDITIONS INCORPORATED HEREIN.

WORK WILL BEGIN WITHIN 14 CALENDAR DAYS OF THE NOTICE TO PROCEED (NTP) AND WILL CONCLUDE 180 CALENDAR DAYS AFTER THE NTP.THIS IS A FIRM FIXED PRICE, 100% SET-ASIDE FOR SMALL BUSINESS.NAICS 237990 - OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD $45,000,000.00.FAR 36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT IS BETWEEN $100,000 AND $250,000.

7/30/2025 - AMENDMENT 0001 HAS BEEN ISSUED TO EXTEND THE DUE DATE TO AUG 8TH 2025.

INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS://WWW.USACE.ARMY.MIL/BUSINESS-WITH-US/PARTNERING/ THEN CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE.Amendment 0002 is to revise the solicitation due date from 08 August 2025 at 1:00PM Eastern to 11 August 2025 at 1:00PM Eastern.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 8, 2025

    Solicitation

    Due July 31, 2025 at 1:00 PM EDT. SAM.gov, notice 1a5efec7d26f4253878796e24b308fa5

  2. July 30, 2025

    Solicitation

    Due August 8, 2025 at 1:00 PM EDT. SAM.gov, notice e146b05f8bff4063b678914f5fc0baa3

  3. August 5, 2025

    Solicitation

    Due August 8, 2025 at 2:00 PM EDT. SAM.gov, notice f8c7c35c6c4b400291a02fb186f50fdf

  4. August 8, 2025

    Solicitation

    Due August 11, 2025 at 2:00 PM EDT. SAM.gov, notice 1bd974a96e9048b886d608de836f70b4

  5. August 8, 2025

    Solicitation

    Due August 11, 2025 at 2:00 PM EDT. SAM.gov, notice 37ba61d7e07e47669280e8f06c98947e

Points of contact