Award notice, total small business set-aside, first published as solicitation
Buckhorn Lake Re-surfacing of Tailwater Area Parking Lot and Maintenance Compound in Perry County, KY.
W912QR24Q0089
Department of the Army, W072 Endist Louisville. Highway, Street, and Bridge Construction.
Awarded
$234,175.00 on the award notice, August 6, 2024, contract W912QR24P0075
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one was awarded in 2024
35 like it are open now in highway, street, and bridge construction
- BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes todayNov 3 - TX FW LGA 10(5) Steve Thompson Wildlife Drive
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes todayNov 3 - ND NP THRO 204(1) Buck Hill Road
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationNAICS 237310Medora, ND6982AF25B000004Closes todayNov 3
Description
As published on SAM.gov.
The work will involve the re-surfacing of existing asphalt pavement areas at Buckhorn Lake Tailwater Site. The contractor’s work will include the removal of the existing asphalt surface course by milling, placing new asphalt surface over existing base course asphalt, striping/marking pavement areas, and performing minor improvements to maintenance compound by installing a trench drain system.
The asphalt mixture, construction, and placement are to meet the requirements of Kentucky Department of Highways Standard Specification for Road and Bridge Construction (KYDOH SSRBC), current edition, unless otherwise specified in this scope of work.
The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to complete the work listed below, at the areas specified at Buckhorn Lake Tailwater, located in Perry County, Kentucky.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- The Steel Factor, LLC
- UEI
- THBWMNBXVK55
- CAGE
- 9GJF5
- Vendor location
- Richmond, KY
- Contract
- W912QR24P0075, purchase order
- Obligated
- $237,825.00, potential $273,075
- Actions
- 6 between August 6, 2024 and April 16, 2025
- Competition
- Competed Under SAP, 3 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Buckhorn Lake RE-SURF Acing of Tailwater Area Parking Lot and Maintenance Compound in Perry County, Ky.
- Match
- award number W912QR24P0075 equals the contract number; same awarding office W912QR (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 11, 2024
Solicitation
Due August 1, 2024 at 12:00 PM EDT. SAM.gov, notice 8effac80ff4841d38b5b01264c7a6767
July 11, 2024
Solicitation
Due August 1, 2024 at 1:00 PM EDT. SAM.gov, notice ba1bb8bae3ff45838c67c2909e709fa4
August 6, 2024
Award notice, originally solicitation
Awarded to THE STEEL FACTOR, LLC Richmond for $234,175. SAM.gov, notice 121a4d0d362243d1a893965a8ff0a6fb
Points of contact
- Joel Hubermanjoel.huberman@usace.army.mil5023157409
- Matthew JuddMatthew.p.judd@usace.army.mil5023157425