Solicitation, first published as presolicitation
Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA
W912HN24B5005
Department of the Army, W074 Endist Savannah. Other Heavy and Civil Engineering Construction.
Response deadline
July 24, 2024 at 1:00 PM EDT
Closed 832 days ago. Posted August 21, 2024, first published May 1, 2024. Scheduled to archive August 8, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
132 like it are open now in other heavy and civil engineering construction
- Tybee Island Shoreline Protection Project
Department of the Army, W074 Endist Savannah
PresolicitationNAICS 237990Tybee Island, GAW912HN27BA001Closes in 3 daysNov 6 - Belle Fountain Ditch Cleanout Phase 2
Department of the Army, W07V Endist Memphis
SolicitationSDVOSBNAICS 237990MissouriW912EQ26BA002Closes todayNov 3 - Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Department of the Army, W076 Endist Galveston
SolicitationNAICS 237990Galveston, TXW912HY26BA019Closes todayNov 3
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging).
Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 1, 2024
Presolicitation, originally sources sought
Presolicitation_W912HN24B5005 - Brunswick Harbor Modifications Project Construction, Glynn County
Due May 15, 2024 at 1:00 PM EDT. SAM.gov, notice b020d99438c7402bb806ca7b51ea7050
May 2, 2024
Presolicitation
Presolicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA
Due May 15, 2024 at 1:00 PM EDT. SAM.gov, notice ae3465be7003454b9de262e130f7fc57
June 24, 2024
Solicitation, originally presolicitation
Due July 24, 2024 at 1:00 PM EDT. SAM.gov, notice e2f6f3d82b5a4e86b5260622a112e295
July 11, 2024
Solicitation
Due July 24, 2024 at 1:00 PM EDT. SAM.gov, notice 3ee61c0a7ba34f7ba7c48d0a71ae555a
July 19, 2024
Solicitation
Due July 24, 2024 at 1:00 PM EDT. SAM.gov, notice f91b8aebbf4249a2b62f3e95e0a65dd6
July 29, 2024
Solicitation
Due July 24, 2024 at 1:00 PM EDT. SAM.gov, notice d75cb763d3a74f79a0a5a994a6d0457b
August 21, 2024
Solicitation
Due July 24, 2024 at 1:00 PM EDT. SAM.gov, notice 5f1e6062ae784e65ba3186327ee10858
Points of contact
- Rohan Bryanrohan.a.bryan@usace.army.mil9126525619
- Glenda Cantyglenda.a.canty@usace.army.mil9126525030