{"canonical":"https://abierto.us/opportunities/w912hn24b5005","key":"W912HN24B5005","url":"https://abierto.us/opportunities/w912hn24b5005","title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","solicitation_number":"W912HN24B5005","notice_type":"o","open":false,"response_deadline":"2024-07-24T17:00:00Z","first_posted":"2024-05-01","last_posted":"2024-08-21","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W074 ENDIST SAVANNAH","naics":"237990","psc":"Z1KF","set_aside":null,"place_state":"GA","place_county":"13127","place_county_name":"Glynn County","place_city":"1311560","place_city_name":"Brunswick","winner":null,"award_amount":null,"publications":[{"notice_id":"b020d99438c7402bb806ca7b51ea7050","title":"Presolicitation_W912HN24B5005 - Brunswick Harbor Modifications Project Construction, Glynn County","solicitation_number":"W912HN24B5005","notice_type":"p","base_type":"r","posted":"2024-05-01","posted_at":null,"due_at":"2024-05-15T17:00:00Z","due_date":"2024-05-15","cancelled":null,"archived":null,"archive_date":"2024-05-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b020d99438c7402bb806ca7b51ea7050/view","enriched":false,"history":[]},{"notice_id":"ae3465be7003454b9de262e130f7fc57","title":"Presolicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","solicitation_number":"W912HN24B5005","notice_type":"p","base_type":"p","posted":"2024-05-02","posted_at":null,"due_at":"2024-05-15T17:00:00Z","due_date":"2024-05-15","cancelled":null,"archived":null,"archive_date":"2024-05-30","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ae3465be7003454b9de262e130f7fc57/view","enriched":false,"history":[]},{"notice_id":"e2f6f3d82b5a4e86b5260622a112e295","title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","solicitation_number":"W912HN24B5005","notice_type":"o","base_type":"p","posted":"2024-06-24","posted_at":null,"due_at":"2024-07-24T17:00:00Z","due_date":"2024-07-24","cancelled":null,"archived":null,"archive_date":"2024-08-08","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e2f6f3d82b5a4e86b5260622a112e295/view","enriched":false,"history":[]},{"notice_id":"3ee61c0a7ba34f7ba7c48d0a71ae555a","title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","solicitation_number":"W912HN24B5005","notice_type":"o","base_type":"o","posted":"2024-07-11","posted_at":null,"due_at":"2024-07-24T17:00:00Z","due_date":"2024-07-24","cancelled":null,"archived":null,"archive_date":"2024-08-08","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3ee61c0a7ba34f7ba7c48d0a71ae555a/view","enriched":false,"history":[]},{"notice_id":"f91b8aebbf4249a2b62f3e95e0a65dd6","title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","solicitation_number":"W912HN24B5005","notice_type":"o","base_type":"o","posted":"2024-07-19","posted_at":null,"due_at":"2024-07-24T17:00:00Z","due_date":"2024-07-24","cancelled":null,"archived":null,"archive_date":"2024-08-08","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f91b8aebbf4249a2b62f3e95e0a65dd6/view","enriched":false,"history":[]},{"notice_id":"d75cb763d3a74f79a0a5a994a6d0457b","title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","solicitation_number":"W912HN24B5005","notice_type":"o","base_type":"o","posted":"2024-07-29","posted_at":null,"due_at":"2024-07-24T17:00:00Z","due_date":"2024-07-24","cancelled":null,"archived":null,"archive_date":"2024-08-08","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d75cb763d3a74f79a0a5a994a6d0457b/view","enriched":false,"history":[]},{"notice_id":"5f1e6062ae784e65ba3186327ee10858","title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","solicitation_number":"W912HN24B5005","notice_type":"o","base_type":"o","posted":"2024-08-21","posted_at":null,"due_at":"2024-07-24T17:00:00Z","due_date":"2024-07-24","cancelled":null,"archived":null,"archive_date":"2024-08-08","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5f1e6062ae784e65ba3186327ee10858/view","enriched":false,"history":[]}],"latest_notice_id":"5f1e6062ae784e65ba3186327ee10858","first_type":"p","notices":[{"dates":{"posted":"2024-05-01","response_deadline":{"raw":"2024-05-15T13:00:00-04:00","utc":"2024-05-15T17:00:00Z","date":"2024-05-15","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b020d99438c7402bb806ca7b51ea7050/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Presolicitation_W912HN24B5005 - Brunswick Harbor Modifications Project Construction, Glynn County","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-30","archive_type":"auto15"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"b020d99438c7402bb806ca7b51ea7050","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"432e1af236eada5beeeb1c899e780367ea6c462b628991f0d05c284b9dd0934d","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This is a PRE-SOLICITATION NOTICE for the FY24 Savannah Inner Harbor Maintenance Dredging. This acquisition will be offered as an unrestricted competitive solicitation and will result in a Firm Fixed Price Contract Award. The magnitude of this requirement per DFARS 236.204(ii) is between $10,000,000.00 and $25,,000,000.00 Project Description: The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable over depth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable over depth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912HN24B5005","place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2024-05-02","response_deadline":{"raw":"2024-05-15T13:00:00-04:00","utc":"2024-05-15T17:00:00Z","date":"2024-05-15","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ae3465be7003454b9de262e130f7fc57/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Presolicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-30","archive_type":"auto15"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"ae3465be7003454b9de262e130f7fc57","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"5bf879f1dd43ab407bd28488d1712b5a355570f12d2eaaf12b0de3f0aa70fb62","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"This is a PRE-SOLICITATION NOTICE for the Brunswick Harbor Modification Construction Project. This acquisition will be offered as an unrestricted competitive solicitation and will result in a Firm Fixed Price Contract Award. The magnitude of this requirement per DFARS 236.204(ii) is between $10,000,000.00 and $25,000,000.00 Project Description: The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912HN24B5005","place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2024-06-24","response_deadline":{"raw":"2024-07-24T13:00:00-04:00","utc":"2024-07-24T17:00:00Z","date":"2024-07-24","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e2f6f3d82b5a4e86b5260622a112e295/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-08","archive_type":"auto15"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"e2f6f3d82b5a4e86b5260622a112e295","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"0de82626a3c5f448b80444b7d67f8d6fb65ca77b3da5c9d0092c15431846427f","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN24B5005","place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2024-07-11","response_deadline":{"raw":"2024-07-24T13:00:00-04:00","utc":"2024-07-24T17:00:00Z","date":"2024-07-24","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3ee61c0a7ba34f7ba7c48d0a71ae555a/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-08","archive_type":"auto15"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3ee61c0a7ba34f7ba7c48d0a71ae555a","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"f04a28fa69e2ff7c7b4e59b4fff11edf589a2b77bcd013d3c87d6f8fe64440a6","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN24B5005","place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2024-07-19","response_deadline":{"raw":"2024-07-24T13:00:00-04:00","utc":"2024-07-24T17:00:00Z","date":"2024-07-24","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f91b8aebbf4249a2b62f3e95e0a65dd6/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-08","archive_type":"auto15"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f91b8aebbf4249a2b62f3e95e0a65dd6","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d592125bb0d54498755c10b5c11281ef1751880a3dab637c23f52fe7ba7cb26e","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN24B5005","place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2024-07-29","response_deadline":{"raw":"2024-07-24T13:00:00-04:00","utc":"2024-07-24T17:00:00Z","date":"2024-07-24","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d75cb763d3a74f79a0a5a994a6d0457b/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-08","archive_type":"auto15"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d75cb763d3a74f79a0a5a994a6d0457b","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"8d44b56db73300d98d8b094c0329ec3c34701399b8c1a5355837814b19376c1d","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN24B5005","place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"},{"dates":{"posted":"2024-08-21","response_deadline":{"raw":"2024-07-24T13:00:00-04:00","utc":"2024-07-24T17:00:00Z","date":"2024-07-24","time":"13:00:00","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5f1e6062ae784e65ba3186327ee10858/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Solicitation_W912HN24B5005 - Brunswick Harbor Modifications Construction, Glynn County, GA","agency":{"office":{"code":"W912HN","name":"W074 ENDIST SAVANNAH"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-08-08","archive_type":"auto15"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5f1e6062ae784e65ba3186327ee10858","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"4bcb980873f7379f059152a9627ced843000b73d786b02a6fc70781a1b3ac39c","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HN24B5005","place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"product_service_code":"Z1KF"}],"due_at":"2024-07-24T17:00:00Z","due_date":"2024-07-24","closes_at":"2024-07-24T17:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","state":"GA","county":"13127","county_name":"Glynn County","city":"1311560","city_name":"Brunswick","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"5f1e6062ae784e65ba3186327ee10858","description":{"text":"The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.","html":null,"origin":"extract"},"contacts":[{"name":"Rohan Bryan","role":"primary","email":"rohan.a.bryan@usace.army.mil","phone":"9126525619"},{"name":"Glenda Canty","role":"secondary","email":"glenda.a.canty@usace.army.mil","phone":"9126525030"}],"place_of_performance":{"city":{"name":"Brunswick"},"state":{"code":"GA"},"country":{"code":"USA"}},"office_address":{"zip":"31401-3604","city":"SAVANNAH","state":"GA","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[],"awards":[],"related":[{"key":"W912HNA050451","latest_notice_id":"d369a338ac3c445983afddd2e8857795","title":"Master Breacher Course (Construction Project) on Griswold Range for the Regimental Special Troops Battalion of the 75th Ranger Regiment in Fort Benning, Georgia.","solicitation_number":"W912HNA050451","notice_type":"r","first_type":"r","first_posted":"2026-09-14","last_posted":"2026-09-14","notices":1,"due_at":"2026-10-03T03:59:00Z","due_date":"2026-10-02","closes_at":"2026-10-03T03:59:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"236220","psc":"Y1JZ","set_aside":null,"state":"GA","county":"13215","county_name":"Muscogee County","city":"1319000","city_name":"Columbus","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912HN26S1001","latest_notice_id":"ebc28960bf3143aabed6a7dce36a7880","title":"Market Research for FY 27 South Georgia Optimized Remediation Contract","solicitation_number":"W912HN26S1001","notice_type":"r","first_type":"r","first_posted":"2026-09-09","last_posted":"2026-09-09","notices":1,"due_at":"2026-10-09T21:00:00Z","due_date":"2026-10-09","closes_at":"2026-10-09T21:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"562910","psc":"F108","set_aside":null,"state":"GA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912HN26BA005","latest_notice_id":"917f7be661bd4022989ef9b01e43961c","title":"Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina","solicitation_number":"W912HN26BA005","notice_type":"o","first_type":"p","first_posted":"2026-04-10","last_posted":"2026-08-24","notices":5,"due_at":"2026-10-15T15:00:00Z","due_date":"2026-10-15","closes_at":"2026-10-15T15:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"236220","psc":"Y1JZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"},{"key":"W912HN27GREENSBORONCRELO6004","latest_notice_id":"b28b9d01ec82469b8c05b850aa4bc522","title":"Armed Forces Career Center - Greensboro, North Carolina","solicitation_number":"W912HN-27-GREENSBORO-NC-RELO-6004","notice_type":"o","first_type":"o","first_posted":"2026-08-24","last_posted":"2026-08-24","notices":1,"due_at":"2027-09-15T03:59:00Z","due_date":"2027-09-14","closes_at":"2027-09-15T03:59:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HN","office_name":"W074 ENDIST SAVANNAH","naics":"5311","psc":"X1AA","set_aside":null,"state":"NC","county":"37081","county_name":"Guilford County","city":"3728000","city_name":"Greensboro","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}