Sources sought
Stringout Construction at Ensley Engineer Yard (EEY).
W912EQ25R19F6
Department of the Army, W07V Endist Memphis. Other Heavy and Civil Engineering Construction.
Response deadline
July 25, 2025 at 1:00 PM EDT
Closed 465 days ago. Posted July 18, 2025, first published July 16, 2025. Scheduled to archive September 25, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
132 like it are open now in other heavy and civil engineering construction
- Arcadia Wet Well Rehabilitation
Department of the Army, W076 Endist Tulsa
SolicitationNAICS 237990Location not publishedW912BV26RA033Closes in 7 daysNov 9 - Pre Solicitation Notice: FY27 Maintenance Dredging Yokohama North Dock
Department of the Army, W2SN Endist Japan
PresolicitationNAICS 237990Outside the USW912HV26Z0015PSNCloses in 14 daysNov 16 - JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Department of the Army, W071 Endist Portland
Closes in 17 daysNov 19
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The U.S. Army Corps of Engineers, Memphis District (MVM) is conducting research to determine the capabilities of potential contractors to support a project requirement. The Memphis District is seeking qualified, experienced sources capable of constructing a Stringout at Ensley Engineer Yard.
The project is to replace the eastern half of the Stringout, which includes the demolition of an existing ramp, existing barges and pile clusters, dredging, construction of the eastern ramp, construction of pile clusters, a GFE landing barge, and GFE Poseidon barges to replace existing material barges that make up the current Stringout. Electrical and mechanical systems will be required in the construction of the Stringout as well.
The structure is located in McKellar Lake, running parallel with the northern border of Ensley Engineer Yard. The Contractor shall construct the new Stringout to government specifications. Portions of the contract may require the contractor to manufacture individual parts of the Stringout at another location and transport them to Ensley Engineer Yard for construction.
[See Attachment - Sources Sought Information] The Government is evaluating whether the use of a Project Labor Agreement (PLA) is appropriate for this construction project in accordance with FAR 22.5 and Executive Order 14063. Your feedback will assist in determining the potential impact of a PLA on project performance, competition, and labor availability. [See Attachment - Project Labor Agreement (PLA) Questionnaire]
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Jessica Lurryjessica.m.lurry@usace.army.mil901.579.2055
- Monica PitchfordMonica.A.Pitchford@usace.army.mil9015443048