# Stringout Construction at Ensley Engineer Yard (EEY).

Canonical: https://abierto.us/opportunities/w912eq25r19f6

- Solicitation number: W912EQ25R19F6
- Notice type: Sources sought
- Status: Closed. Deadline was July 25, 2025 at 1:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W07V Endist Memphis (W912EQ)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1PZ Construction Of Other Non-Building Facilities
- First posted: July 16, 2025
- Last posted: July 18, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/24a646a784634715a508f6edb1d7c519/view

## Description

The U.S. Army Corps of Engineers, Memphis District (MVM) is conducting research to determine the capabilities of potential contractors to support a project requirement. The Memphis District is seeking qualified, experienced sources capable of constructing a Stringout at Ensley Engineer Yard.

The project is to replace the eastern half of the Stringout, which includes the demolition of an existing ramp, existing barges and pile clusters, dredging, construction of the eastern ramp, construction of pile clusters, a GFE landing barge, and GFE Poseidon barges to replace existing material barges that make up the current Stringout. Electrical and mechanical systems will be required in the construction of the Stringout as well.

The structure is located in McKellar Lake, running parallel with the northern border of Ensley Engineer Yard. The Contractor shall construct the new Stringout to government specifications. Portions of the contract may require the contractor to manufacture individual parts of the Stringout at another location and transport them to Ensley Engineer Yard for construction.

[See Attachment - Sources Sought Information] The Government is evaluating whether the use of a Project Labor Agreement (PLA) is appropriate for this construction project in accordance with FAR 22.5 and Executive Order 14063. Your feedback will assist in determining the potential impact of a PLA on project performance, competition, and labor availability. [See Attachment - Project Labor Agreement (PLA) Questionnaire]

## Publications

- July 16, 2025: Sources sought, due July 25, 2025 at 2:00 PM EDT. Notice 9ed3747eb29d477e80f67da99c555838. https://sam.gov/workspace/contract/opp/9ed3747eb29d477e80f67da99c555838/view
- July 18, 2025: Sources sought, due July 25, 2025 at 1:00 PM EDT. Notice 24a646a784634715a508f6edb1d7c519. https://sam.gov/workspace/contract/opp/24a646a784634715a508f6edb1d7c519/view

## Points of contact

- Jessica Lurry, jessica.m.lurry@usace.army.mil, 901.579.2055
- Monica Pitchford, Monica.A.Pitchford@usace.army.mil, 9015443048

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w912eq25r19f6.
