Skip to content
Abierto

Special notice

Notice of Industry Day for Ediz Hook Beach Nourishment Project

W912DW26B0001

Department of the Army, W071 Endist Seattle. Other Heavy and Civil Engineering Construction.

Response deadline

September 5, 2025 at 1:00 PM EDT

Closed 378 days ago. Posted September 9, 2025, first published August 18, 2025. Scheduled to archive October 1, 2025.

Description

As published on SAM.gov.

AGENCY/OFFICE:

U.S. Army Corps of Engineers LOCATION: USACE Northwestern Division – Seattle (NWS)

District TITLE: INDUSTRY DAY – Ediz Hook Beach Nourishment Project LOCATION: Virtual - information provided below.

DATE:

05 September 2025 TIME:

10:00 AM to 10:30 AM PDT DESCRIPTION: The United States Army Corps of Engineers (USACE), Northwestern Division - Seattle District (NWS) is hosting a Virtual Industry Day event to provide additional information and gain feedback from industry on the Ediz Hook Beach Nourishment project in Port Angeles, Washington. The Government is seeking qualified, experienced sources capable of performing this type of project.

The agency has been tasked to solicit for and award a construction contract to procure and place beach nourishment fill material along the seaward toe of the Ediz Hook armor stone revetment to a height of +12 ft Mean Lower Low Water (MLLW). Up to 40,000 tons of 6 to 12” minus rounded cobble is expected to be placed within a 2,900 ft zone along the revetment. Construction will occur in one season and is expected to last 4-8 weeks based on available funding.

Access to repair area would occur over existing roads and over the armored slope of the revetment near the east end of the paper mill near Sta. 151+00. Contractor must temporarily remove and stockpile armor stone to facilitate to the repair area. Upon completion of beach nourishment placement activities, contractor must rebuild the revetment using the stockpiled armor stone. All work (transport and placement) must be performed using land-based equipment.

Work is anticipated to begin 16 July 2026. All construction activity below the High Tide Line must be complete by 30 September 2026. The entire project, including cleanup of the premises, must be complete by 15 October 2026. In accordance with Federal Acquisition Regulation (FAR) Part 36, the estimated construction price range for this project is:

Between $1,000,000 and $5,000,000. Estimated duration of the actual construction activities is 4-8 weeks. The VIRTUAL Industry Day Event will take place on 05 September 2022 at 10:00 AM PDT via Teams. Below is the link to join this meeting. https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_dc569b2535cb40d395efb2281f2e98c5%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%22d7bba062-d8ea-4476-9299-c1e9adc8b209%22%7d Meeting ID:

993 130 529 665 Passcode: Cb35WY7T If you would like to provide feedback for consideration on the documents, please provide them by email to:

Mckenna Rain, Contract Specialist, at Mckenna.T.Rain@usace.army.mil by 12 September 2025, 12:00 PM PDT.

Small Business Program Inquiries:

Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/ Thank you for your interest in this USACE project.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 18, 2025

    Special notice

    Due September 5, 2025 at 1:00 PM EDT. SAM.gov, notice 3c9813dc7b5549b6a10c182b45acb0e8

  2. September 9, 2025

    Special notice

    Due September 5, 2025 at 1:00 PM EDT. SAM.gov, notice b8e53d1242dd49d99f30f99ae0d6d0f4

Points of contact