Skip to content
  • 6,807 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

Hybrid vessel Charging System Project at Caven Point Marine Terminal

W912DS24B0022

Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.

Response deadline

August 22, 2024 at 2:00 PM EDT

Closed 801 days ago. Posted August 7, 2024. Scheduled to archive September 6, 2024.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2024

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation of seven (7) new mooring dolphins. Each mooring dolphin is comprised of six tubular steel casing pipe piles (micropiles) connected to a reinforced concrete cap. Each mooring dolphin micropile is socketed to rock using a threaded bar anchoring system.

Each mooring dolphin is furnished with a new steel bollard for mooring and tubular steel rub rail connected to the existing concrete cap beam using post installed epoxy anchors. The new fender system is comprised of foam-filled camels braced against vertical steel pipe piles that are connected to molded rubber cone fenders with a fabricated steel guide pile sleeve assembly. Work also includes installation of new utility service and powering of project equipment.

This work will consist of the construction and installation of a new shore power station capable of delivering 480VAC 3 phase power at 550 amps to the DCV DRIFTMASTER II to recharge the vessels batteries.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 7, 2024

    Presolicitation, originally sources sought

    Due August 22, 2024 at 2:00 PM EDT. SAM.gov, notice 235a0050c1db4f0cb1a276c43837ab1d

Points of contact