Presolicitation
Hybrid vessel Charging System Project at Caven Point Marine Terminal
W912DS24B0022
Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.
Response deadline
August 22, 2024 at 2:00 PM EDT
Closed 801 days ago. Posted August 7, 2024. Scheduled to archive September 6, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
132 like it are open now in other heavy and civil engineering construction
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990New JerseyW912PM27BA004Closes tomorrowNov 2 - GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes tomorrowNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes tomorrowNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation of seven (7) new mooring dolphins. Each mooring dolphin is comprised of six tubular steel casing pipe piles (micropiles) connected to a reinforced concrete cap. Each mooring dolphin micropile is socketed to rock using a threaded bar anchoring system.
Each mooring dolphin is furnished with a new steel bollard for mooring and tubular steel rub rail connected to the existing concrete cap beam using post installed epoxy anchors. The new fender system is comprised of foam-filled camels braced against vertical steel pipe piles that are connected to molded rubber cone fenders with a fabricated steel guide pile sleeve assembly. Work also includes installation of new utility service and powering of project equipment.
This work will consist of the construction and installation of a new shore power station capable of delivering 480VAC 3 phase power at 550 amps to the DCV DRIFTMASTER II to recharge the vessels batteries.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 7, 2024
Presolicitation, originally sources sought
Due August 22, 2024 at 2:00 PM EDT. SAM.gov, notice 235a0050c1db4f0cb1a276c43837ab1d
Points of contact
- Michael McCuemichael.l.mccue@usace.army.mil