Sources sought, total small business set-aside
Kansas City Levees Closure Structures Across Railroad Tracks
W912DQ25RA042
Department of the Army, W071 Endist Kansas City. Other Heavy and Civil Engineering Construction.
Response deadline
May 5, 2025 at 12:00 PM EDT
Closed 546 days ago. Posted April 7, 2025. Scheduled to archive May 26, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
128 like it are open now in other heavy and civil engineering construction
- Arcadia Wet Well Rehabilitation
Department of the Army, W076 Endist Tulsa
SolicitationNAICS 237990Location not publishedW912BV26RA033Closes in 7 daysNov 9 - Pre Solicitation Notice: FY27 Maintenance Dredging Yokohama North Dock
Department of the Army, W2SN Endist Japan
PresolicitationNAICS 237990Outside the USW912HV26Z0015PSNCloses in 14 daysNov 16 - JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
Department of the Army, W071 Endist Portland
Closes in 17 daysNov 19
All 128 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)-owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units.
The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202.Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees.
Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages.
Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track.Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 7, 2025
Sources sought
Due May 5, 2025 at 12:00 PM EDT. SAM.gov, notice 5fbca5df54ee45448853ee0e2158f37d