Presolicitation
Newt Graham Lock and Dam 18 Tainter Gates Replacement
W912BV24PS0018
Department of the Army, W076 Endist Tulsa. Other Heavy and Civil Engineering Construction.
Response deadline
July 10, 2024 at 3:00 PM EDT
Closed 845 days ago. Posted May 17, 2024. Scheduled to archive July 25, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
131 like it are open now in other heavy and civil engineering construction
- Webbers Falls Excitation System Replacements
Department of the Army, W076 Endist Tulsa
SolicitationNAICS 237990Webbers Falls, OKW912BV26RA029Closes in 3 daysNov 5 - Tenkiller Hydropower Excitation System Replacement
Department of the Army, W076 Endist Tulsa
PresolicitationNAICS 237990Gore, OKCY4001Closes in 4 daysNov 6 - Fort Sill NC Gravesite Expansion and FCA Deficiencies 920CM3006
Department of Veterans Affairs, National Cemetery Admin
Closes in 7 daysNov 9
All 131 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The U.S. Army Corps of Engineers--Tulsa District has been tasked to solicit for and award a contract for the replacement of tainter gates 1, 2, and 3 at the Newt Graham Lock and Dam 18 located outside of Inola, OK (Wagoner County). The proposed project will be a competitive, firm-fixed-price contract procured in accordance with FAR 15, Negotiated Procurement, using the trade-off process.
The gate replacement work consists of the removal of the existing Tainter gates and trunnion yoke assemblies, the off-site fabrication of the new Tainter gates and trunnion yoke assemblies, and the delivery and installation of the new Tainter gates at Newt Graham Lock & Dam. 18. The newly fabricated Tainter gates are 60ft x 27ft in size and weigh approximately 181,000 lbs. each. The gates and yoke assemblies will be required to be fabricated in an AISC certified facility.
All awarded Tainter gates will be fabricated first prior to performing any removal of existing Tainter gates and install. Upon delivery of all Tainter gates, coordination will be needed with USACE personal to dewater the Tainter Gate bays. Only 1 tainter gate can be out of service at any given time. Removal and disposal of the existing tainter gates will be required prior to performing the install of the new Tainter Gate.
The existing Tainter will be removed along with the trunnion yoke assemblies from the existing trunnion anchorage. It is anticipated that the existing Tainter gate removal and new Tainter gate install will require a 400-500 Ton crane mounted on a navigable floating plant. Monitor the prevailing river conditions at the project site, referring to the upstream project river gage, river forecasts issued by the National Weather Services to determine when to withdraw equipment and floating plant.
The withdrawal of equipment and floating plant shall ultimately be the Contractor's decision and shall not be directed by the Government. Per DFARS 236.204, the magnitude of this construction project is between $10,000,000 and $25,000,000. A Request for Proposals is projected to be released on or about 10 June 2024, with proposals due 30 days after release of RFP. This project will be an unrestricted solicitation.
The estimated duration of the construction phase for the proposed base contract (replacement of 1 of the 3 tainter gates) is 730 days. Max period of performance (proposed options for remaining 2 tainter gate replacement) is 1460 days. This base period and options may change when solicitation is released.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 17, 2024
Presolicitation, originally sources sought
Due July 10, 2024 at 3:00 PM EDT. SAM.gov, notice 70d32621b15d4c9a93d85dde648c21e9