Solicitation, total small business set-aside

Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota

W9128F26RA107

Department of the Army, W071 Endist Omaha. Highway, Street, and Bridge Construction.

Response deadline

August 27, 2026 at 12:00 PM EDT

Closed 20 days ago. Posted August 26, 2026, first published July 21, 2026. Scheduled to archive September 30, 2026.

Description

As published on SAM.gov.

Amendment 0003 = 1. Revise Section 00 21 00, paragraph 8. 2. Revise Section 00 22 00, paragraph 1. 3. Remove 52.242-4 Final indirect cost rates Offers will be received until 10:00 am Central 27 August 2026. Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses.

Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs 340ft).

This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement.

Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings.

Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 21, 2026

    Solicitation

    Due August 20, 2026 at 12:00 PM EDT. SAM.gov, notice 91040caddf154e54ac527f013385194b

  2. July 21, 2026

    Solicitation

    Due August 20, 2026 at 11:00 AM EDT. SAM.gov, notice cda52c6373d747f2b8ca85c14522028c

  3. July 30, 2026

    Solicitation

    Due August 20, 2026 at 11:00 AM EDT. SAM.gov, notice 0c1907c4c64e4d69a437adbc307004f9

  4. August 11, 2026

    Solicitation

    Due August 27, 2026 at 12:00 PM EDT. SAM.gov, notice bd154587aa5a4402a1daaac8b53bfac4

  5. August 18, 2026

    Solicitation

    Due August 27, 2026 at 12:00 PM EDT. SAM.gov, notice 6c663aecff044cfdb21295a7055ae2e8

  6. August 26, 2026

    Solicitation

    Due August 27, 2026 at 12:00 PM EDT. SAM.gov, notice 8367be48ec6f437bb6b2c3207f4efb88