Solicitation, total small business set-aside, first published as presolicitation
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
W9127N26BA024
Department of the Army, W071 Endist Portland. Highway, Street, and Bridge Construction.
Response deadline
October 29, 2026 at 3:00 PM EDT
Closed 2 days ago. Posted October 29, 2026, first published July 6, 2026. Scheduled to archive November 13, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed 2 days ago
36 like it are open now in highway, street, and bridge construction
- FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes in 2 daysNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 3 daysNov 3 - TX FW LGA 10(5) Steve Thompson Wildlife Drive
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 3 daysNov 3
Description
As published on SAM.gov.
*** 20 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement ***
This amendment affects changes to the Block 14 (Description of Amendment/Modification):
CHANGE IN SOLICITATION SPECIFICATIONS:
Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
Paragraph 1.18.4 Traffic Control Plan (TCP) edited.
CHANGE IN SOLICITATION ATTACHMENTS:
Attachment A16 BN NL Bridge As Builts_combined drawings edited.
(SEE ATTACHED AMENDMENT FOR CHANGES)
*** 14 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement ***
This amendment affects changes to the Block 14 (Description of Amendment/Modification):
Solicitation Specifications, Section 01 45 00.00 25 QUALITY CONTROL
Paragraph 3.8.1 GOVERNING FIELD TESTING STANDARDS AND FREQUENCIES added.
Solicitation Specifications, Section 03 30 00.00 99 CAST-IN-PLACE REINFORCED CONCRETE
Paragraph 3.13.1 GENERAL added.
Remove drawing C-104 and replace with C-104 - MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES.
Remove drawing C-106 and replace with C-106 - MARK 1 - AMD-0006 – UPDATE TO PAVING AREA AND NOTES, MARK 2 - AMD-0006 – UPDATE TO DEFINE FENCING AND GATE.
Remove drawing C-102 and replace with C-102 – MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES.
(SEE ATTACHED AMENDMENT FOR CHANGES)
*** 01 October 2026 - Amendment W9127N26BA0240005 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement ***
This amendment effects changes to the Block 14 (Description of Amendment/Modification):
The Solicitation Period is extended by 21 calendar days which changes the Solicitation Closing Date from October 8, 2026, to October 29, 2026.
Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS, Paragraph 1.18.4 Traffic Control Plan (TCP) edited.
Solicitation Specifications, Section 01 45 00.25 25 CONSTRUCTION MANAGEMENT PLATFORM (CMP), Technical Section added in its entirety.
(SEE ATTACHED AMENDMENT FOR CHANGES)
*** 18 September 2026 - Amendment W9127N26BA0240004 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement ***
This amendment effects changes to the Block 14 (Description of Amendment/Modification):
Solicitation Specifications, Section 31 68 13.00 99 – GROUND ANCHORS, Part 1 GENERAL, Paragraph 1.5.2 Qualifications are changed as detailed in the SUMMARY OF CHANGES.
Solicitation Specifications, Section 31 73 20.00 99 – JET GROUTING, Part 1 GENERAL, Paragraph 1.7.1 Qualifications are changed as detailed in the SUMMARY OF CHANGES.
Solicitation Specifications, Section 00 73 00 – Supplementary Conditions, Paragraph L. - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Period of Performance is amended as detailed in the SUMMARY OF CHANGES.
This will allow for work to occur during the 2029 and 2030 In Water Work Window years. Environmental permits remain unchanged by this amendment. Marine Mammal protections as listed in the specification, and as governed by the IHA, included with the Attachments, remain in effect for the permitted years. No in water work, that is governed by IHA, will be allowed beyond the IHA permit years allowed.
(SEE ATTACHED AMENDMENT FOR CHANGES)
*** 09 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement ***
This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 57 19.00 25 - TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.4.3 PROFESSIONAL ARCHAEOLOGICAL MONITOR.
(SEE ATTACHED AMENDMENT FOR CHANGES)
*** 03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement***
This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specifications, Section 00 21 13 – Instruction to Bidders, and Section 00 21 00 – Instructions. Additionally, it extends the solicitation period and provides for an additional site visit.
The Solicitation Period is extended by 20 calendar days which changes the Solicitation Closing Date from September 18, 2026, to October 8, 2026.
Site Visit Registration. Send an email to Michael R. Carl via email at michael.r.carl@usace.army.mil and Courney R. Hollins at courtney.r.hollins@usace.army.mil by COB Wednesday, 09 September 2026, to register for the site visit and provide first name, last name, and company/organization name. Site visit attendees must be U.S. citizens and possess a REAL ID to access the site.
Acceptable forms of proof of citizenship for anyone born outside the USA are:
US Birth Certificate: Must be certified & issued by either a US State or the US State Department.
US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16.
US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current.
US Certificate of Citizenship: Issued by US Citizenship and Immigration Service.
Consular Report of Birth Abroad: Issued by the US State Department.
US Naturalization Certificate: Issued by US Citizenship and Immigration Service.
Enhanced Driver’s License: from Michigan, Minnesota, New York, Vermont, or Washington.
Acceptable ID:
Real ID driver’s license.
Enhanced driver’s license.
Federal Identification Cards PIC/CAC/PIV/Etc.
Transportation Worker Identification Card (TWIC).
United States Passport or United States Passport Card.
Driver’s license issued by the Department of State.
*** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement***
This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence.
The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge.
The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In
addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Bonneville Navigation Lock 1 Bridge Replacement_Drawings_ADVERTISE-EDITED.pdf117.7 MB, August 19, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 6, 2026
Presolicitation, originally sources sought
Due July 21, 2026 at 6:00 PM EDT. SAM.gov, notice cb23149114c044e78cdd489a486c56fb
3 revisions on SAM
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
- March 6, 2026: publish, sources sought
August 19, 2026
Solicitation, originally presolicitation
Due September 18, 2026 at 6:00 PM EDT. SAM.gov, notice 649dc0a978a341069f1a42f2fbd0a736
6 revisions on SAM
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
August 27, 2026
Solicitation
Due September 18, 2026 at 6:00 PM EDT. SAM.gov, notice d20a3955dfe544c2985a1cd4630cd130
6 revisions on SAM
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
August 28, 2026
Solicitation
Due September 18, 2026 at 6:00 PM EDT. SAM.gov, notice 307e98f9a2944d449d0e77660515abcd
6 revisions on SAM
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
September 3, 2026
Solicitation
Due October 8, 2026 at 3:00 PM EDT. SAM.gov, notice 5403178dbb5e4c859a0fe889ed6a4f37
6 revisions on SAM
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
September 9, 2026
Solicitation
Due October 8, 2026 at 3:00 PM EDT. SAM.gov, notice ef5c8e515992418bbcdac03555122d8b
6 revisions on SAM
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
September 18, 2026
Solicitation
Due October 8, 2026 at 3:00 PM EDT. SAM.gov, notice 28690a98563d4e80a862c71ed4b8ff10
7 revisions on SAM
- September 18, 2026: publish, solicitation
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
September 29, 2026
Solicitation
Due October 8, 2026 at 3:00 PM EDT. SAM.gov, notice 09921c6e77bd4bf7b258910bf7a601b8
8 revisions on SAM
- September 29, 2026: publish, solicitation
- September 18, 2026: publish, solicitation
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
October 1, 2026
Solicitation
Due October 29, 2026 at 3:00 PM EDT. SAM.gov, notice 8290c2fd806b40038dc1b77d4c0d3ba2
9 revisions on SAM
- October 1, 2026: publish, solicitation
- September 29, 2026: publish, solicitation
- September 18, 2026: publish, solicitation
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
October 14, 2026
Solicitation
Due October 29, 2026 at 3:00 PM EDT. SAM.gov, notice e8d20fb3aaab46af86d58aac9f67c22e
10 revisions on SAM
- October 14, 2026: publish, solicitation
- October 1, 2026: publish, solicitation
- September 29, 2026: publish, solicitation
- September 18, 2026: publish, solicitation
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
October 20, 2026
Solicitation
Due October 29, 2026 at 3:00 PM EDT. SAM.gov, notice d4ed1867cf004f8d8877b6689b1ca68f
11 revisions on SAM
- October 20, 2026: publish, solicitation
- October 14, 2026: publish, solicitation
- October 1, 2026: publish, solicitation
- September 29, 2026: publish, solicitation
- September 18, 2026: publish, solicitation
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
October 29, 2026
Solicitation
Due October 29, 2026 at 3:00 PM EDT. SAM.gov, notice ca998219205e44f2ba4679024357e04f
12 revisions on SAM
- October 29, 2026: publish, solicitation
- October 20, 2026: publish, solicitation
- October 14, 2026: publish, solicitation
- October 1, 2026: publish, solicitation
- September 29, 2026: publish, solicitation
- September 18, 2026: publish, solicitation
- September 9, 2026: publish, solicitation
- September 3, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 27, 2026: publish, solicitation
- August 19, 2026: publish, solicitation
- July 6, 2026: publish, presolicitation
Points of contact
- Christopher Burroughschristopher.d.burroughs@usace.army.mil
- Justin FigueredoJustin.F.Figueredo@usace.army.mil