Selma Alabama Flood Risk Management and Bank Stabilization Project

W9127826RA105

Department of the Army, W074 Endist Mobile. Other Heavy and Civil Engineering Construction.

Response deadline

September 2, 2026 at 3:00 PM EDT

Closed 14 days ago. Posted August 12, 2026. Scheduled to archive August 12, 2027.

Description

As published on SAM.gov.

The U.S. Army Corps of Engineers, Mobile District, has a need for a contract to design and construct a flood risk management and bank stabilization project in the vicinity of downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 12, 2026

    Sources sought

    Due September 2, 2026 at 3:00 PM EDT. SAM.gov, notice c0b79844152842d7a68e64fd18c83dda