# Selma Alabama Flood Risk Management and Bank Stabilization Project

Canonical: https://abierto.us/opportunities/w9127826ra105

- Solicitation number: W9127826RA105
- Notice type: Sources sought
- Status: Closed. Deadline was September 2, 2026 at 3:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W074 Endist Mobile (W91278)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Z2KZ Repair Or Alteration Of Other Conservation And Development Facilities
- First posted: August 12, 2026
- Last posted: August 12, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/c0b79844152842d7a68e64fd18c83dda/view

## Description

The U.S. Army Corps of Engineers, Mobile District, has a need for a contract to design and construct a flood risk management and bank stabilization project in the vicinity of downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.

## Publications

- August 12, 2026: Sources sought, due September 2, 2026 at 3:00 PM EDT. Notice c0b79844152842d7a68e64fd18c83dda. https://sam.gov/workspace/contract/opp/c0b79844152842d7a68e64fd18c83dda/view

## Points of contact

- Jennifer Suit, Jennifer.H.Suit@usace.army.mil, 2514416466

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w9127826ra105.
