Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA

W9123625S13MA

Department of the Army, W2SD Endist Norfolk. Other Heavy and Civil Engineering Construction.

Response deadline

June 19, 2025 at 2:00 PM EDT

Closed 456 days ago. Posted June 5, 2025. Scheduled to archive August 15, 2026.

Description

As published on SAM.gov.

The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A – Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton’s Creek Pump Station (DBB).

This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton’s Creek pump stations are excluded from this contract.

The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. See attached document for addiitional information.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 5, 2025

    Sources sought

    Due June 19, 2025 at 2:00 PM EDT. SAM.gov, notice c8c4909dc5cc4c27be47d75bf938332b