Skip to content
Abierto

Solicitation, total small business set-aside

Mobile Home Demolition

W911YN-26-Q-A024

Department of the Army, W7M2 Uspfo Activity FL Arng. Site Preparation Contractors.

Response deadline

September 11, 2026 at 5:00 PM EDT

Closed 5 days ago. Posted September 9, 2026, first published September 2, 2026. Scheduled to archive September 26, 2026.

Description

As published on SAM.gov.

SEE ATTACHED Q&A SET AS OF 09 SEP 2026

PERFORMANCE WORK STATEMENT Mobile Office Demolition 1.0 Objective The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals. 2.0 Scope of Work This project will be executed in three (3) distinct phases:

Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel.

Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility.

Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition. 3.0 Completion Standard The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear.

4.0 Details Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB)

Site POC: CW2 Merrill, Andrew (904) 682-6215 ext. 1150 andrew.d.merrill2.mil@army.mil Site Visit Date:

09 September 2026 Time:

10:00 AM Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 POC: Andrew Merrill (CW2) andrew.d.merrill2.mil@army.mil (904) 682-6215 ext. 1150 Robert Glanowski (Contract Specialist) robert.j.glanowski.civ@army.mil (904) 823-0555

Attendance is not required and will not prohibit quote submissions.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 2, 2026

    Solicitation

    Due September 11, 2026 at 5:00 PM EDT. SAM.gov, notice da0ab67a2647465e9fd8d2d5b345df58

  2. September 9, 2026

    Solicitation

    Due September 11, 2026 at 5:00 PM EDT. SAM.gov, notice d578f654fd3a46fbac4dfaf905d3e19a

Points of contact