Award notice, total small business set-aside, first published as presolicitation
Flood Protection Project Rehabilitation, Saw Mill Run, Allegheny County, PA
W911WN25B8005
Department of the Army, W072 Endist Pittsburgh. Other Heavy and Civil Engineering Construction.
Awarded
Gale Construction Company of Illinois
$1,360,731.31 obligated so far on USAspending
Description
As published on SAM.gov with the solicitation of January 14, 2025.
PL84-99 Flood Protection Project Rehabilitation at Saw Mill Run, City of Pittsburgh, Allegheny County, for the U.S. Army Corps of Engineers, Pittsburgh District. There are two (2) specific work areas within the scope of this project and are noted as Downstream and Upstream Work Areas.
Downstream Area: This work area is approximately 780 feet in length and spans the length of channel between the area near Violet Way and Neptune Street. The work area also includes the area near the Lincoln Highway bridge just above the channel access ramp location near the Artifacts Pittsburgh Store. Features of work that will be covered by Federal Funds for this project include the following:
revetment mat damages (STA 23+52 - 23+86). Features of work that will be covered as Sponsor Deferred Maintenance include the following:
revetment mat damages (STA 22+99 - 23+52), channel scour hole (STA 22+99 - 23+86).
Upstream Area: This work area is approximately 460 feet in length and spans the length of channel at the upper portion of the project limits near the channel access ramp near the intersection of Wabash Street and Greentree Road. Features of work that will be covered by Federal Funds for this project include the following:
revetment mat damages (STA 41+68 - 41+94), upper portions of access ramp damages near STA 41+94, revetment mat damages (STA 42+84 - 45+21), undercutting of existing revetment mat (STA 45+36 - 45+54). Features of work that will be covered as Sponsor Deferred Maintenance include the following:
lower portions of access ramp damages near STA 41+94, scour hole near drop structure (STA 45+36 - 45+54), revetment mat damages (STA 45+21 - 45+36). An important note about project work at the overall Saw Mill Run Project. As of May 2021, the City of Pittsburgh is currently planning on completing deferred maintenance work in the project areas outside of these two (2) specific Rehabilitation Areas.
This work will be completed by a maintenance contract by the City of Pittsburgh, likely ahead of this work under the PL 84-99 action. USACE and the City of Pittsburgh will continue to coordinate the project scope statements of each contract to ensure clarity of work to be completed by each contract.
Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- UEI
- NN82B6SNCLV4
- CAGE
- 5A6N2
- Vendor location
- Joliet, IL
- Contract
- W911WN25C8003, definitive contract
- Obligated
- $1,360,731.31, current value $1,365,283
- Actions
- 7 between February 6, 2025 and March 18, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 2 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Saw Mill Run Flood Protection Project Rehabilitation, Allegheny County.
- Match
- award number W911WN25C8003 equals the contract number; same awarding office W911WN (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 15, 2024
Presolicitation
Flood Protection Project Rehabilitation for Saw Mill Run, Pittsburgh, Pennsylvania, Allegheny County, PA.
Due December 4, 2024 at 5:00 PM EST. SAM.gov, notice 93d2871eeecd49198bc4cad40378f5d4
December 10, 2024
Solicitation
Due January 14, 2025 at 11:00 AM EST. SAM.gov, notice 474825c4e638450393d3f8200ba23640
December 18, 2024
Solicitation
Due January 14, 2025 at 11:00 AM EST. SAM.gov, notice be03ae718fde492facb9826903bcf4ba
January 14, 2025
Solicitation
Due January 14, 2025 at 11:00 AM EST. SAM.gov, notice 240025234b6d462283ee3576348e27e8
February 6, 2025
Award notice, originally solicitation
Awarded to GALE CONSTRUCTION COMPANY OF ILLINOIS 51 W JACKSON ST STE 230 Joliet for $899,163. SAM.gov, notice d8da36f7cea04cf7b7da0bc7c273eff8
July 15, 2025
Award notice
Awarded to GALE CONSTRUCTION COMPANY OF ILLINOIS 51 W JACKSON ST STE 230 Joliet for $899,163. SAM.gov, notice 414564225eb0467c9ab8e3fb9d259fa3
Points of contact
- Mario Dizdarevicmario.dizdarevic@usace.army.mil5023157421
- CONNIE FERGUSONconnie.l.ferguson@usace.army.mil4123957551
Also open from this buyer
- Motor Control PanelsCombined synopsis and solicitationSmall businessNAICS 335314Morgantown, WVW911WN26QA061Closes todaySep 18
- Youghiogheny Resource Managers Building Siding ReplacementSolicitationSmall businessNAICS 238170W911WN26QA059Closes in 10 daysSep 28