# Flood Protection Project Rehabilitation, Saw Mill Run, Allegheny County, PA

Canonical: https://abierto.us/opportunities/w911wn25b8005

- Solicitation number: W911WN25B8005
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Gale Construction Company of Illinois for $899,163.48
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W072 Endist Pittsburgh (W911WN)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1QA Construction Of Restoration Of Real Property (Public Or Private)
- Set-aside: Total small business set-aside
- County: Allegheny County (FIPS 42003). https://abierto.us/counties/allegheny-county-pa-42003
- City: Pittsburgh. https://abierto.us/cities/pittsburgh-pa-4261000
- First posted: November 15, 2024
- Last posted: July 15, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/414564225eb0467c9ab8e3fb9d259fa3/view

## Description

PL84-99 Flood Protection Project Rehabilitation at Saw Mill Run, City of Pittsburgh, Allegheny County, for the U.S. Army Corps of Engineers, Pittsburgh District. There are two (2) specific work areas within the scope of this project and are noted as Downstream and Upstream Work Areas.

**Downstream Area:** This work area is approximately 780 feet in length and spans the length of channel between the area near Violet Way and Neptune Street. The work area also includes the area near the Lincoln Highway bridge just above the channel access ramp location near the Artifacts Pittsburgh Store. Features of work that will be covered by Federal Funds for this project include the following:

revetment mat damages (STA 23+52 - 23+86). Features of work that will be covered as Sponsor Deferred Maintenance include the following:

revetment mat damages (STA 22+99 - 23+52), channel scour hole (STA 22+99 - 23+86).

**Upstream Area:** This work area is approximately 460 feet in length and spans the length of channel at the upper portion of the project limits near the channel access ramp near the intersection of Wabash Street and Greentree Road. Features of work that will be covered by Federal Funds for this project include the following:

revetment mat damages (STA 41+68 - 41+94), upper portions of access ramp damages near STA 41+94, revetment mat damages (STA 42+84 - 45+21), undercutting of existing revetment mat (STA 45+36 - 45+54). Features of work that will be covered as Sponsor Deferred Maintenance include the following:

lower portions of access ramp damages near STA 41+94, scour hole near drop structure (STA 45+36 - 45+54), revetment mat damages (STA 45+21 - 45+36). An important note about project work at the overall Saw Mill Run Project. As of May 2021, the City of Pittsburgh is currently planning on completing deferred maintenance work in the project areas outside of these two (2) specific Rehabilitation Areas.

This work will be completed by a maintenance contract by the City of Pittsburgh, likely ahead of this work under the PL 84-99 action. USACE and the City of Pittsburgh will continue to coordinate the project scope statements of each contract to ensure clarity of work to be completed by each contract.

Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.

## Award on USAspending

- Recipient: Gale Construction Company of Illinois (UEI NN82B6SNCLV4)
- Contract: W911WN25C8003, definitive contract
- Obligated: $1,360,731.31, current value $1,365,283
- Competition: Full and Open Competition After Exclusion of Sources, 2 offers received
- Link: award number W911WN25C8003 equals the contract number; same awarding office W911WN (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_W911WN25C8003_9700_-NONE-_-NONE-/


## Publications

- November 15, 2024: Presolicitation, due December 4, 2024 at 5:00 PM EST. Notice 93d2871eeecd49198bc4cad40378f5d4. https://sam.gov/workspace/contract/opp/93d2871eeecd49198bc4cad40378f5d4/view
- December 10, 2024: Solicitation, due January 14, 2025 at 11:00 AM EST. Notice 474825c4e638450393d3f8200ba23640. https://sam.gov/workspace/contract/opp/474825c4e638450393d3f8200ba23640/view
- December 18, 2024: Solicitation, due January 14, 2025 at 11:00 AM EST. Notice be03ae718fde492facb9826903bcf4ba. https://sam.gov/workspace/contract/opp/be03ae718fde492facb9826903bcf4ba/view
- January 14, 2025: Solicitation, due January 14, 2025 at 11:00 AM EST. Notice 240025234b6d462283ee3576348e27e8. https://sam.gov/workspace/contract/opp/240025234b6d462283ee3576348e27e8/view
- February 6, 2025: Award notice. Notice d8da36f7cea04cf7b7da0bc7c273eff8. https://sam.gov/workspace/contract/opp/d8da36f7cea04cf7b7da0bc7c273eff8/view
- July 15, 2025: Award notice. Notice 414564225eb0467c9ab8e3fb9d259fa3. https://sam.gov/workspace/contract/opp/414564225eb0467c9ab8e3fb9d259fa3/view

## Points of contact

- Mario Dizdarevic, mario.dizdarevic@usace.army.mil, 5023157421
- CONNIE FERGUSON, connie.l.ferguson@usace.army.mil, 4123957551

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w911wn25b8005.