Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

SAFETY SHOWER

W911S226U4017

Department of the Army, W6QM Micc-Ft Drum. Plumbing Fixture Fitting and Trim Manufacturing.

Response deadline

August 18, 2026 at 10:00 AM EDT

Closed 75 days ago. Posted August 10, 2026. Scheduled to archive August 10, 2027.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

8 like it are open now in plumbing fixture fitting and trim manufacturing

  • PURCHASE: FLEX COUPLED PUMP

    Bureau of Indian Affairs, Indian Education Acquisition Office

    SolicitationIndian small businessNAICS 332913Anywhere in the US140A2327Q0304
    Closes in 3 daysNov 4
  • PARTS KIT,LAVATORY

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationNAICS 332913Anywhere in the USSPE8E827T0353
    Closes in 9 daysNov 9
  • HEATER,THERMAL,RELE

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationNAICS 332913Anywhere in the USSPE8E927T0308
    Closes in 9 daysNov 9

All 8 open in plumbing fixture fitting and trim manufacturing

Description

As published on SAM.gov.

ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ ���� Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ? Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ � Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60�F (15.6�C) in freezing or cold-weather conditions ? Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0�F (-17.8�C) ________________________________________���� Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ? Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ ���� Structural and Mounting Specifications ? Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ? Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ � Power Requirements ?Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 10, 2026

    Combined synopsis and solicitation

    Due August 18, 2026 at 10:00 AM EDT. SAM.gov, notice d5979f2abb544b6981b4dd5a2a2139bc

    1 revisions on SAM
    • August 10, 2026: publish, combined synopsis and solicitation

Points of contact